Strata movement due to extraction of a longwall panel is of great significance both in terms of environment and ground control. Thick coal seam extraction is expected to severely disturb the overburden, which is critical. Most studies use only one or two methods to investigate strata movement that are not thorough or comprehensive. This paper presents a detailed comprehensive case study of strata movement in extraction of a longwall top coal caving panel of a composite coal seam with partings in the Baozigou Coal Mine. The caved zone and fractured zone development were captured through physical modeling by incorporating the digital image correlation method (DICM), universal distinct element code (UDEC) numerical modeling, and field observation with the method of high-pressure water injection. The result of the physical modeling is 90 m. The numerical modeling result is 84 m. Field data show that the fractured zone is 81 m. Therefore, it demonstrates that the results from different methods are consistent, which indicates that the results from this comprehensive study are reliable and scientific.
During the mining process of fully-mechanized caving faces, the roof of the roadway behind the working face easily forms an arched-shape hanging roof structure with the working face pushed forward, which results in potential hazards such as gas accumulation and large-scale roof collapse. Based on the actual situation of a hanging roof at a difficult caving end in fully-mechanized top coal caving faces, through borehole exploration, surrounding rock displacement observation, bolt stress monitoring, theoretical formula calculation, and numerical simulation methods, the structure characteristics of the hanging roof at the end of the fully-mechanized caving face are studied. The ultimate failure depth and ultimate break distance of the hanging roof structure at the end of the working face are obtained, and its formation mechanism is analyzed. It is concluded that the hanging structure is formed by the following reasons: the lithology of sandy mudstone and fine sandstone above the top coal of the roadway is strong; the hanging roof structure is less affected by working-face mining; there is a result of insufficient rotary pressure of the upper mudstone while working together with the protective coal pillar and end support the caving step distance of the curved hanging roof structure is 10~13.55 m.