Greg Wheatley

Dr. Greg Wheatley


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2021 in Resources, Conservation and Recycling
Verified
Journal Article
Closed access
EOEmenike George Okonkwo
Emenike George Okonkwo
GWGreg Wheatley
Greg Wheatley
YHYinghe He
Yinghe He


1 September 2021 in Journal of Materials Research and Technology
Verified
Journal Article
Open access
KRKaveh Rahmani
Kaveh Rahmani
ANAlireza Nouri
Alireza Nouri
GWGreg Wheatley
Greg Wheatley
HMHossein Malekmohammadi
Hossein Malekmohammadi
HBHamed Bakhtiari
Hamed Bakhtiari
VYVahid Yazdi
Vahid Yazdi

1 September 2021 in Results in Engineering
Verified
Journal Article
Open access
KRKaveh Rahmani
Kaveh Rahmani
GWGreg Wheatley
Greg Wheatley
ASAli Sadooghi
Ali Sadooghi
SHSeyed Jalal Hashemi
Seyed Jalal Hashemi
JBJafar Babazadeh
Jafar Babazadeh

1 September 2021 in Results in Engineering
Verified
Journal Article
Open access
GWGreg Wheatley
Greg Wheatley
MZMohammad Zaeimi
Mohammad Zaeimi

31 March 2021 in Acta logistica
Verified
Journal Article
Closed access
GWGreg Wheatley
Greg Wheatley
RRRobiul Islam Rubel
Robiul Islam Rubel
This article presents the analysis of conveyor drive power requirements for three typical mining conveyors. One of the conveyors was found not to be able to start when fully loaded. The analysis indicates that two of the conveyors are adequately powered while one is underpowered. This was found to be primarily the result of the maximum tonnage of the two adequately powered conveyors being 1500 tonnes per hour (TPH) while the inadequately powered conveyor was classed with a maximum tonnage of 1800 TPH. It is recommended that the current draw for each motor when fully loaded be measured. This will be compared to the design. Further analysis was done to allow 2000 TPH on all conveyors. The required upgraded drive size is presented. This article does not address the structural adequacy of the supporting structure. Rather, only the capabilities of the conveyor belt and drives to transport the required TPH.