Prashant Prashant

Mr. Prashant Prashant


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2022 in IEEE Access
Verified
Journal Article
Open access
PPPrashant Prashant
Prashant Prashant
MSMd Sarwar
Md Sarwar
ASAnwar Shahzad Siddiqui
Anwar Shahzad Siddiqui
Sherif GhoneimSherif Ghoneim
Sherif Ghoneim
Karar MahmoudKarar Mahmoud
Karar Mahmoud
Mohamed M. F. DarwishMohamed M. F. Darwish
Mohamed M. F. Darwish
Managing transmission congestion had been a major problem with growing competition in the power networks. Accordingly, competitiveness emerges through the network’s reconfiguration and the proliferation of secondary facilities. Congestion of transmission lines is a critical issue, and their regulation poses a technical challenge as the power system is deregulated. Therefore, the present research illustrates a multi-objective strategy for reaching the optimal capabilities of distributed generators (DG) like wind power plants and geothermal power-producing plants to alleviate congestion throughout the transmission network. Goals such as congestion management during power delivery, power loss reduction, power flow improvement with the enhancement of voltage profile, and investment expenditure minimization are considered to boost the network’s technological and economic reliability. The congestion management is achieved using the locational marginal price (LMP) and calculation of transmission congestion cost (TCC) for the optimal location of DG. After identification of congested lines, DG is optimally sized by particle swarm optimization (PSO) and a newly proposed technique that combines the features of modified IL-SHADE and PSO called hybrid swarm optimization (HSO) which employs linear population size reduction technique which improves its performance greatly by reducing the population size by elimination of least fit individuals at every generation giving far better results than those obtained with PSO. In addition, optimal rescheduling of generations from generators has been done to fulfill the load demand resulting in alleviation of congested lines thereby enhancing the performance of the network under investigation. Furthermore, the performance of the proposed methodology of HSO and PSO has been tested successfully on standard benchmark IEEE-30 & IEEE-57 bus configurations in a MATLAB environment with the application of MATPOWER power system package.

11 March 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
PPPrashant Prashant
Prashant Prashant
ASAnwar Shahzad Siddiqui
Anwar Shahzad Siddiqui
MSMd Sarwar
Md Sarwar
AAAhmed Althobaiti
Ahmed Althobaiti
Sherif GhoneimSherif Ghoneim
Sherif Ghoneim
This article presents the selection of location and sizing of multiple distributed generators (DGs) for boosting performance of the radial distribution system in the case of constant power load flow and constant impedance load flow. The consideration of placing and sizing of DGs is to meet the load demand. This article tries to overcome the limitations of existing techniques for determining the appropriate location and size of DGs. The selection of DG location is decided in terms of real power losses, accuracy, and sensitivity. The size of DG is measured in terms of real and reactive power. Both positioning and sizing of DG are analyzed with the genetic algorithm and the heuristic probability distribution method. The results are compared with other existing methods such as ant-lion optimization algorithm, coyote optimizer, modified sine-cosine algorithm, and particle swarm optimization. Further, the power quality improvement of the network is assessed by positioning D-STATCOM, and its location is decided on the basis of the nearby bus having poor voltage profile and high total harmonic distortion (THD). The switching and controlling of D-STATCOM are assessed with fuzzy logic controller (FLC) for improving the performance parameters such as voltage profile and THD at that particular bus. The proposed analytical approach for the system is tested on the IEEE 33 bus system. It is observed that the performance of the system with the genetic algorithm gives a better solution in comparison to heuristic PDF and other existing methods for determining the optimal location and size of DG. The introduction of D-STATCOM into the system with FLC shows better performance in terms of improved voltage profile and THD in comparison to existing techniques.

9 March 2022 in Protection and Control of Modern Power Systems
Verified
Journal Article
Open access
PDF file
ASAnwar Shahzad Siddiqui
Anwar Shahzad Siddiqui
PPPrashant Prashant
Prashant Prashant
In existing power system networks, the positioning and sizing of multi-DG is critical at the optimum locations for effective energy management. Initially optimal power flow is assessed using the NR method (without DG) in which performance parameters such as real power loss, accuracy, selectivity and MSE are obtained, but in an undesirable manner. To meet load demand; multi-DGs are placed and their optimal locations are assessed by the proposed heuristic probability distribution methodology and an ANN because existing techniques provides poor performance parameters for selecting the location and sizing of DGs. The optimal positions of multi-DGs are estimated in terms of performance parameters including real power loss of transmission network, accuracy, selectivity and MSE, while the performance parameters obtained with the ANN are better than the heuristic pdf. Then, the sizing of multi-DGs is evaluated in relation to active and reactive power. It is found that that sizes of multi-DGs are smaller with ANN than with heuristic pdf. It is preferable to connect the buses having lowest real power losses with the smallest multi-DGs. The performance analysis is tested in the standard IEEE 9- bus and IEEE 57- bus systems on Simulink. To improve the distortion level in real and reactive power, multi-FACTS namely TCSC, TSC and STATCOM are used. The switching of TCSC and TSC is done by SPWM while STATCOM switching is controlled with ANFIS. The locations of multi-FACTS devices are chosen for buses having larger distortion and the sizing of multi-FACTS devices is also optimally decided. The application of multi-FACTS devices helps to improve power quality and fulfill load demand with minimal size in order to make the system economical.

13 August 2021 in International Transactions on Electrical Energy Systems
Verified
Journal Article
Closed access
PDF file
PPPrashant Prashant
Prashant Prashant
ASAnwar Shahzad Siddiqui
Anwar Shahzad Siddiqui
ASABHINAV SAXENA
ABHINAV SAXENA
This article presents intelligent controlling on locational marginal pricing (LMP) of deregulated system for congestion management. Transmission line congestion is a critical concern, and its governance raises a technological obstacle when deregulating the electricity grid. Congestion throughout the unregulated energy market occurs where transmitting capacity is not adequate to reach all the demand transmission constraints across a line. The congestion management is decided by using the LMP difference between two buses. The existing methods have higher LMP cost due to which controlling of LMP is assessed by using a hybrid approach and genetic algorithm (GAs). The LMP difference obtained with GAs is lesser than hybrid approach which makes system economical. After the selection of uniform and high demanded congested zone, a distributed generator (DG) is used to fulfill the demand. The DG is represented by solar PV array and connected to bus through converters. The switching of the converter is assessed by a fuzzy logic controller (FLC) and vector control. The implementation of FLC improves the THD of real and reactive power generated by DG in a better way in comparison to vector control. The performance analysis is tested on standard IEEE 9-bus system, standard IEEE 14-bus system, and standard IEEE 57-bus system on Simulink.

9 February 2023 in IETE Journal of Research
Verified
Journal Article
Closed access
ASABHINAV SAXENA
ABHINAV SAXENA
ADAmit Kumar Dash
Amit Kumar Dash
RVRahul Virmani
Rahul Virmani
PPPrashant Prashant
Prashant Prashant
NSNitya Srivastava
Nitya Srivastava
PRPrateeksha Ranjan
Prateeksha Ranjan
The article presents an analysis of the optimal control of speed and regenerative braking in an electric vehicle (EV). The presence of the continuous generating power is one of the major challenges for battery charging of electric vehicle. In order to meet the demand of continuous power, electric vehicles are driven by solar PV arrays. Initially, maximum power extraction (MPPT) is assessed from a solar photovoltaic (PV) array using the P&O method. The outputs of the solar PV array are integrated with electric vehicles. Such integration creates the problem of maintaining the power quality. The existing methods also address the issue of optimal speed and torque control with high transients and more settling time. In this article, an electric vehicle is modeled first and then operated in regenerative braking mode. To address the shortcomings of existing methods, the linear quadratic regulator (LQR) method is used; then, fuzzy logic controller (FLC)-based LQR is used for optimal speed and torque control during electric vehicle regenerative braking. In terms of reduced settling time and improved peak overshoot, optimal speed and regenerative torque of electric vehicles are better realized with LQR-based FLCs than with LQR controllers. In addition to this, stopping speed characteristics with various electrical parameters (voltage, current, and flux) have been analyzed with different methods in which LQR-based FLC shows its dominance to attain zero speed in regenerative mode with more sharp characteristics.

18 September 2022
Verified
Book Chapter
Closed access
PDF file
PPPrashant Prashant
Prashant Prashant
ASAnwar Shahzad Siddiqui
Anwar Shahzad Siddiqui
SASarwar
Sarwar