During the drilling and repairing of wells, the pipe string transfer equipment has a high work frequency. The movement accuracy, response speed, and controllability of the equipment have significant impacts on the stability. In this paper, we propose an analysis method of mechanical arms to lift pipe strings using a rigid–flexible coupling model. With the mechanical arm as a flexible body and the mechanical hand as a rigid body, a numerical calculation model of the rigid-flexible coupling of the system was established based on the Lagrangian equation. ADAMS and Ansys software were applied to numerical simulations of this system to investigate the lifting characteristics, the influence of the operation parameters and structure parameters, and the contact collision analysis of the mechanical arm. The conditions of rigid–flexible modeling for the multi-body system and the main factors affecting the vibration characteristics of the flexible arm are described. We conclude that the arm should be modeled as a rigid body if the structure parameter [w/l] (elastic deformation/length) is between 1/650 and 1/1000, the system can be modeled as a rigid–flexible coupling if [w/l] is between 1/400 and 1/650, and the arm should be modeled as a flexible body and the influence and compensation of the control method should be considered if [w/l] is between 1/250 and 1/400.
Powder laying is a necessary procedure during powder bed additive manufacturing (PBAM), and the quality of powder bed has an important effect on the performance of products. Because the powder particle motion state during the powder laying process of biomass composites is difficult to observe, and the influence of the powder laying process parameters on the quality of the powder bed is still unclear, a simulation study of the biomass composite powder laying process during powder bed additive manufacturing was conducted using the discrete element method. A discrete element model of walnut shell/Co-PES composite powder was established using the multi-sphere unit method, and the powder-spreading process was numerically simulated using two different powder spreading methods (rollers/scrapers). The results showed that the quality of powder bed formed by roller laying was better than that formed by scrapers with the same powder laying speed and powder laying thickness. For both of the two different spreading methods, the uniformity and density of the powder bed decreased as spreading speed increased, although the spreading speed had a more important influence on scraper spreading compared to roller spreading. As powder laying thickness increased, the powder bed formed by the two different powder laying methods became more uniform and denser. When the powder laying thickness was less than 110μm, the particles were easily blocked at the powder laying gap and are pushed out of the forming platform, forming many voids, and decreasing the powder bed’s quality. When the powder thickness was greater than 140 μm, the uniformity and density of the powder bed increased gradually, the number of voids decreased, and the quality of the powder bed improved.
The scrapping of old waterflooding wells and the increase in new waterflooding wells results in mixed flooding of high–low pressure wells in various oil layers in waterflooding systems. In order to meet production operation requirements, the whole system is in a state of high pressure, which leads to an increase in energy consumption and complicates the operation of waterflooding networks. According to the pressure distribution of wells, proceeding with regional accurate waterflooding can reduce operation costs and improve development efficiency. Considering the technical constraints of waterflooding networks, a method was proposed, which can quantitatively optimize classification and zoning for waterflooding of high–low pressure wells according to the pressure of networks and wells. At the same time, the ant colony algorithm and genetic algorithm were fused to form a new adaptive ant colony genetic hybrid algorithm, which can effectively determine the best pumping scheme of the waterflooding station, the pumping flow and optimize the low-pressure area. The K-means algorithm was used to optimize the topology of the pipe network in the high-pressure area to reduce the overall waterflooding pressure. Finally, the method was successfully applied to the large-scale waterflooding system including 2200 wells and 10 waterflooding stations in sites in China. The results show that the method is effective for the operation and reconstruction of waterflooding pipe networks with large-scale and serious mixed high–low pressure.