Wei-Min Hong

Wei-Min Hong


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 September 2022 in Buildings
Verified
Journal Article
Open access
PDF file
HSHonghao Sun
Honghao Sun
HLHongmei Liu
Hongmei Liu
JTJunjie Tian
Junjie Tian
RGRong Guo
Rong Guo
QXQian Xu
Qian Xu
CZChenhui Zhu
Chenhui Zhu
With the continuous promotion of urbanization, the generation of construction and demolition waste (CDW) is increasing. The environmental problems and safety hazards caused as a result need to be resolved. In this paper, based on the system dynamics (SD) theory, the modeling, the cost, and the environmental benefit of CDW resource management under the life cycle assessment (LCA) are proposed. Specifically, we propose a combined policy derived through three variables, namely, fines, subsidies, and charges. The target is to reduce illegal dumping behavior and landfill volume and to improve the recycling volume and environmental benefits. The model is constructed with the help of the software VENSIM, and the validity and feasibility of the model are demonstrated with data from Nantong City. The results show that a single policy cannot simultaneously improve environmental benefits, illegal dumping, recycling, and landfill behavior. A combined policy combines the advantages of three single policies, fines, subsidies, and charges, which not only can effectively curb illegal dumping and landfill disposal under the premise of prioritizing environmental benefits, but can also promote the recycling of CDW. The reasonable range for the fine is 300–350 CNY/ton; the rational range for subsidies is 30–40 CNY/ton; and the flexible range for treatment charge is 40–80 CNY/ton. The model can be used for the quantitative assessment of urban CDW management costs and environmental benefits and can also provide a theoretical basis for the government.

4 April 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
HLHong-Mei Liu
Hong-Mei Liu
HSHonghao Sun
Honghao Sun
RGRong Guo
Rong Guo
DWDong Wang
Dong Wang
HYHao Yu
Hao Yu
WHWei-Min Hong
Wei-Min Hong
Industrial solid waste (ISW) accounts for the most significant proportion of solid waste in China. Improper treatment of ISW will cause significant environmental pollution. As the basis of decision-making and the management of solid waste resource utilization, the accurate prediction of industrial solid waste generation (ISWG) is crucial. Therefore, combined with China’s national conditions, this paper selects 14 influential factors in four aspects: society, economy, environment and technology, and then proposes a new prediction model called the principal component analysis nonlinear autoregressive back propagation (PCA-NARBP) neural network model. Compared with the back propagation (BP) neural network model and nonlinear autoregressive back propagation (NARBP) neural network model, the mean absolute percentage error (MAPE) of this model reaches 1.25%, which shows that it is more accurate, includes fewer errors and is more generalizable. An example is given to verify the effectiveness, feasibility and stability of the model. The forecast results show that the output of ISW in China will still show an upward trend in the next decade, and limit the total amount to about 4.6 billion tons. This can not only provide data support for decision-makers, but also put forward targeted suggestions on the current management situation in China.