1 July 2007 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
IYI-Tung Yang
I-Tung Yang
The present study develops a new optimization algorithm to find the complete time-cost profile (Pareto front) over a set of feasible project durations, i.e., it solves the time-cost trade-off problem. To improve existing methods, the proposed algorithm aims to achieve three goals: (1) to obtain the entire Pareto front in a single run; (2) to be insensitive to the scales of time and cost; and (3) to treat all existing types of activity time-cost functions, such as linear, nonlinear, discrete, discontinuous, and a hybrid of the above. The proposed algorithm modifies a population-based search procedure, particle swarm optimization, by adopting an elite archiving scheme to store nondominated solutions and by aptly using members of the archive to direct further search. Through a fast food outlet example, the proposed algorithm is shown effective and efficient in conducting advanced bicriterion time-cost analysis. Future applications of the proposed algorithm are suggested in the conclusion.

31 August 2009 in Automation in Construction
Verified
Journal Article
Closed access
Jui-Sheng ChouJui-Sheng Chou
Jui-Sheng Chou
IYI-Tung Yang
I-Tung Yang
WCWai Kiong Chong
Wai Kiong Chong

11 January 2012 in Engineering with Computers
Verified
Journal Article
Closed access
PDF file
IYI-Tung Yang
I-Tung Yang
YHYi-Hung Hsieh
Yi-Hung Hsieh

1 May 2016 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PIPhotios G. Ioannou
Photios G. Ioannou
IYI-Tung Yang
I-Tung Yang
Projects with repeating activities, such as multistory buildings and highways, present unique scheduling challenges. This paper presents the necessary requirements that scheduling systems should address to meet the needs and complexities of repetitive projects in practice. The repetitive scheduling method (RSM) provides a unified scheduling framework that applies to all types of repetitive projects. In RSM, projects are classified as discrete (vertical) or continuous (horizontal or linear) and then as uniform and nonuniform, depending on whether progress is measured using a counting scale or a dominant-attribute scale. RSM modeling elements include three types of activities (line, block, and bar) and 10 types of relationships (links) between activities. RP2, a computer program developed by the authors to validate the proposed scheduling approach, is used to develop the production diagrams and tabular reports of the target schedule for a complex of four-story apartment buildings for a low-income ho...

1 March 2022 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
MTMeng-Han Tsai
Meng-Han Tsai
CYCheng-Hsuan Yang
Cheng-Hsuan Yang
CWChen-Hsuan Wang
Chen-Hsuan Wang
IYI-Tung Yang
I-Tung Yang
SKShih-Chung Kang
Shih-Chung Kang
Collecting construction equipment information such as the site equipment enter and exit date-time, driver’s name, type, and quantity is essential in construction management. Most construction projects use paper to record the equipment access history. However, manual recording is always labour-intensive and time-consuming. Therefore, this research aims to develop an assistant system, Site Equipment Management Assistant (SEMA), to automate the site equipment management processes. With the introduction of image recognition and multiple objects tracking technologies, the proposed system can extract equipment-related information from raw videos. SEMA is designed as a chatbot system that contains three major modules: data acquisition, information extraction, and information delivery. A deep learning-based model was first trained to automatically recognize and track construction equipment passing by the site monitor. Information such as equipment entering and exiting date-time, type, and quantity would be extracted and stored in a database. A chatbot interface was developed for users to obtain data from the database through an intuitive and easy-to-use interface. A system evaluation and usability test were conducted. The results showed that the system could effectively improve the construction equipment management process. SEMA can save 60.7% of users’ operation time on obtaining related information.

13 November 2012 in Automation in Construction
Verified
Journal Article
Closed access
Chyi-Gang KuoChyi-Gang Kuo
Chyi-Gang Kuo
TJTaysheng Jeng
Taysheng Jeng
IYI-Tung Yang
I-Tung Yang