Cheng-Hsuan Yang

Cheng-Hsuan Yang

Auto-generated profile, based on publicly available information

Cheng-Hsuan Yang

University of Alberta, Ca

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2021 in Automation in Construction
Verified
Journal Article
Closed access
CYCheng-Hsuan Yang
Cheng-Hsuan Yang
SKShih-Chung Kang
Shih-Chung Kang

1 March 2022 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
MTMeng-Han Tsai
Meng-Han Tsai
CYCheng-Hsuan Yang
Cheng-Hsuan Yang
CWChen-Hsuan Wang
Chen-Hsuan Wang
IYI-Tung Yang
I-Tung Yang
SKShih-Chung Kang
Shih-Chung Kang
Collecting construction equipment information such as the site equipment enter and exit date-time, driver’s name, type, and quantity is essential in construction management. Most construction projects use paper to record the equipment access history. However, manual recording is always labour-intensive and time-consuming. Therefore, this research aims to develop an assistant system, Site Equipment Management Assistant (SEMA), to automate the site equipment management processes. With the introduction of image recognition and multiple objects tracking technologies, the proposed system can extract equipment-related information from raw videos. SEMA is designed as a chatbot system that contains three major modules: data acquisition, information extraction, and information delivery. A deep learning-based model was first trained to automatically recognize and track construction equipment passing by the site monitor. Information such as equipment entering and exiting date-time, type, and quantity would be extracted and stored in a database. A chatbot interface was developed for users to obtain data from the database through an intuitive and easy-to-use interface. A system evaluation and usability test were conducted. The results showed that the system could effectively improve the construction equipment management process. SEMA can save 60.7% of users’ operation time on obtaining related information.

11 December 2020 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
MTMeng-Han Tsai
Meng-Han Tsai
CYCheng-Hsuan Yang
Cheng-Hsuan Yang
JCJames Yichu Chen
James Yichu Chen
SKShih-Chung Kang
Shih-Chung Kang
This research proposes a four-stage consultant framework for applying a chatbot as a data management system. With the advancement of computational power and data storage technology, the increasing amount of data makes the issue of data management difficult to address. Management of a massive amount of data by utilizing chatbots to play the roles of a data manager and a data provider has been extensively studied. Although a chatbot system has been proven to increase the overall efficiency of data management, implementing a chatbot system in a government department remains a challenge, especially in a field with highly complex data. This research presents the authors’ experience of applying a chatbot system in a department of the government of Taiwan for disaster response operations. A four-stage consulting framework comprising 1) existing workflow review, 2) usability evaluation, 3) system improvement, and 4) management plan (EUSM) was thus proposed. After a two-year field test, the authors found that the framework could help the department in clarifying their working process, increase the overall efficiency of the chatbot system, and identify the major issues of introducing the chatbot system.

24 May 2019 in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
Verified
Conference Paper
Closed access
CYCheng-Hsuan Yang
Cheng-Hsuan Yang
TWTzong-Hann Wu
Tzong-Hann Wu
Bo XiaoBo Xiao
Bo Xiao
SKShih-Chung Kang
Shih-Chung Kang

1 January 2023
Verified
Book Chapter
Open access
XHXiao Han
Xiao Han
CYCheng-Hsuan Yang
Cheng-Hsuan Yang
YCYuxiang Chen
Yuxiang Chen
ASAlejandra Hernandez Sanchez
Alejandra Hernandez Sanchez
Currently, industrial robot arms are trending in prefabricated building construction; however, a notable gap exists in established automated processes and related research specifically for the insertion of batt thermal insulation. The current method for accomplishing this task relies on manual insertion, which is labour-intensive for the workers and poses long-term health and safety concerns. This research presents an ongoing research project aimed at developing a feasible robotic process for the automated insertion of batt thermal insulation into prefabricated light-frame wood wall frames. This research focuses on the utilization of a single 6-degree-of-freedom robot arm for the insertion process, complimented by the design of a custom-built end-effector. The proposed robotic insertion process, named GLITPP, comprises of six major steps: (1) Grasp, (2) Lift, (3) Insert, (4) Tilt, (5) Push, and (6) Press. The GLITPP insertion process, along with the custom-built end-effector effectively mitigates the influence of the insulation’s nonlinear mechanical properties, while also taking collision avoidance into consideration. This ensures a tight-fitting insulation within the frame cavity, without visible gaps and deficiencies. The necessary physical operating parameters for the insertion process, such as angles, offset, and force requirements, are identified to ensure the precision, efficiency, and repeatability of insertion. A prototype of the designed end-effector is used to demonstrate and validate the robotic method, achieved a high success rate of 93.3%. The development of this research will further advance the complete automation of light-frame wood wall panel prefabrication, offering the industry a wider range of options for selecting thermal insulation for their processes