Mehdi Mrad

Prof. Mehdi Mrad


Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 January 2018 in IEEE Access
Verified
Journal Article
Open access
MMMehdi Mrad
Mehdi Mrad
NSNizar Souayah
Nizar Souayah
In this paper, we consider the basic makespan minimization problem on identical parallel machines. The aim of this study is to solve to optimality the hard instances of the literature. We present an integer linear program based on an innovative arc-flow model inspired from the duality between the bin packing problem and the parallel-machine scheduling problem. The proposed mathematical model is tested on a large set of hard instances. The results of computational experiments attest the efficiency of the new approach and prove that it outperforms the existing ones. In addition to its efficiency, the proposed method is simple and easy to use.

1 January 2015 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
MMMehdi Mrad
Mehdi Mrad
LHLotfi Hidri
Lotfi Hidri

1 May 2013 in Journal of the Operational Research Society
Verified
Journal Article
Closed access
MMMehdi Mrad
Mehdi Mrad
IMI Meftahi
I Meftahi
MHM Haouari
M Haouari

1 January 2014 in Journal of Applied Mathematics
Verified
Journal Article
Open access
PDF file
MMMehdi Mrad
Mehdi Mrad
OCOlfa Chebbi
Olfa Chebbi
MLMohamed Labidi
Mohamed Labidi
MLMohamed Ali Louly
Mohamed Ali Louly
Personal rapid transit (PRT) is a public and automated transport system in which a fleet of small driverless vehicles operate in order to transport passengers between a set of stations through a network of guided ways. Each customer is carried from one station to another directly with no stop in intermediate stations. This mode of transport can result in a high level of unused capacity due to the empty moves of the vehicles. In this paper, we model the problem of minimizing the energy consumed by the PRT system while assuming predeterministic list of orders; then we solve it using some constructive heuristics. Experiments are run on 1320 randomly generated test problems with various sizes. Our algorithms are shown to give good results over large trip instances.

9 May 2018 in IEEE Access
Verified
Journal Article
Open access
NSNizar Souayah
Nizar Souayah
Nabil MlaikiNabil Mlaiki
Nabil Mlaiki
MMMehdi Mrad
Mehdi Mrad
Fixed point theory is a very important tool in mathematics and applied sciences. Latterly, many application examples have been presented for communication network and computer science fields. The proposed schema can be considered as a theoretical foundation for such a type of applications. In this paper, we introduce the notion of the G m -contraction to generalize and extend the notion of G-contraction. We investigate the existence and uniqueness of the fixed point for such contractions in M-metric space endowed with a graph. Our results extend and generalize various results in the existing literature, in particular the results of Jachymski. Some examples are included, which illustrate the results proved herein.

7 March 2019 in IEEE Access
Verified
Journal Article
Open access
MMMehdi Mrad
Mehdi Mrad
Khalid Saad A. Al-GahtaniKhalid Saad A. Al-Gahtani
Khalid Saad A. Al-Gahtani
RHRahmeto Hulchafo
Rahmeto Hulchafo
NSNizar Souayah
Nizar Souayah
KBKhaled Bamatraf
Khaled Bamatraf
Time, quality, and cost are the most critical performance indicators in project management. It has always been considered a tough challenge for project managers to optimize them simultaneously. This study aims at establishing a simulation-based Integer Linear Programming tool that helps project managers, at the preliminary stages, to assess the risks related to the feasibility and profitability of the projects within the framework of a stochastic discrete time-cost-quality tradeoff problem. Computational experiments on a wide range of benchmark instances from the literature were performed, and the results were compared with those of the deterministic version of the problem. The proposed approach is able to assess the impact of the stochastic behavior of the duration and quality of the tasks on the cost, duration and quality of the whole project. Moreover, the simplicity and the reduced time required for the computation of large size networks revealed to be very promising for giving a practical solution for real-life projects.