Khalid Saad A. Al-Gahtani

Prof. Khalid Saad A. Al-Gahtani

King Saud University, Riyadh, Ar Riyāḑ, Saudi Arabia
orcid
Professor of Construction Engineering and Management, Civil ...

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 June 2022 in Buildings
Verified
Journal Article
Open access
PDF file
SASaad Mohammed Alshihri
Saad Mohammed Alshihri
Khalid Saad A. Al-GahtaniKhalid Saad A. Al-Gahtani
Khalid Saad A. Al-Gahtani
AAAbdulmohsen Almohsen
Abdulmohsen Almohsen
Rapid transformation across all sectors through Saudi Arabia’s vision 2030 initiatives led to an increase in construction activities. However, the construction industry has been already facing huge cost and time overruns, affecting all stakeholders. The aim of this study is to identify and explore the influential risk factors that lead to completion delays and cost overruns of government-funded building construction projects in Saudi Arabia, all of which have been subjected to a traditional type of procurement method (Standard Public Works Contract). The literature examined in this study identified a total of 83 risk factors, which have been grouped into nine categories. A questionnaire-based survey was conducted to determine the participants’ perspectives on the degree of probability of occurrence (P) of each risk and its potential impact on a project in terms of time (IT) and cost (IC). The questionnaire survey was distributed to 200 experts and professionals associated with Saudi building construction projects, which were grouped into four categories: clients, designers, consultants, and contractors. Fifty-five acceptable questionnaires were returned and analysed. The relative importance index (RII), and Risk Importance (RI) were used to identify the most influential risk factors, and an agreement test was conducted. The results of the survey revealed that the most significant risks factors contributing to the delay of building construction projects’ completion are contractor’s financial difficulties, owner’s delay in making progress payments for completed works, contracts awarded to the lowest bidder, change orders during construction, ineffective project planning and scheduling by the contractor, shortage of manpower, and contractor’s poor site management and supervision. In addition, change orders during construction and contracts awarded to the lowest bidder are the most significant risks factors of exceeding budgets. Based on the results, it is concluded that for achieving sustainable development, client, contractor, and labour-related risks must be effectively managed.

1 May 2017 in Journal of Cleaner Production
Verified
Journal Article
Closed access
MMMohamed Marzouk
Mohamed Marzouk
EAEslam Mohammed Abdelkader
Eslam Mohammed Abdelkader
Khalid Saad A. Al-GahtaniKhalid Saad A. Al-Gahtani
Khalid Saad A. Al-Gahtani

1 February 2009 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
Khalid Saad A. Al-GahtaniKhalid Saad A. Al-Gahtani
Khalid Saad A. Al-Gahtani
Float ownership is one of the controversial issues in the litigation of delay claims. As float time does not always affect the overall project completion time, many believe that this time can be used by any of the project parties and that it does not belong to a particular party. This study introduces the “total risk approach” for float allocation, a new approach that integrates several current approaches to allocate float among project parties. The approach is based on the basic concept that the party who has the greatest risk in a project should be entitled to float ownership and deserves compensation from other project parties who increase the risk associated with the project by consuming the float. This new approach takes into consideration the changes in float that may occur as a result of actions that delay or accelerate the project’s schedule.

6 September 2023 in Buildings
Verified
Journal Article
Open access
PDF file
AAAljawharah A Alnaser
Aljawharah A Alnaser
NANaif M. Alsanabani
Naif M. Alsanabani
Khalid Saad A. Al-GahtaniKhalid Saad A. Al-Gahtani
Khalid Saad A. Al-Gahtani
Construction delays are a prevalent issue worldwide, and Saudi Arabia is just a short distance from this experience. Although the Saudi construction industry was booming due to Vision 2030, major delays were recorded in numerous construction projects, resulting in extra costs and schedule overruns. Studies on Building Information Modeling (BIM) have increased recently due to their crucial role in managing construction projects. However, more efforts need to be made to define the impact value of adopting BIM using advanced techniques such as System Dynamics (SD). It also aims to demonstrate the BIM impacts globally to encourage taking advantage of such a system. Limited papers studied BIM impact in-depth using advanced techniques such as SD. Thus, A questionnaire was distributed to fifty-nine experts to measure the extent of BIM’s influence on the ten factors affecting project delay times discovered in the literature. The statistical analysis results were used to calculate each factor’s relative importance index (RII), compare them to the results obtained without BIM use, and calculate the relative difference for each factor. These relative differences were considered in the modified SD. The modified SD was applied to a case study representing an academic building in the King Saud University campus. The main finding revealed that BIM decreased construction project delays by 14.55%. In addition, this study found that BIM has a maximum influence on poor site management and supervision by contractors, with a reduction percentage of 17.65%, and a minimum influence on lack of contractor experience and managerial skills, with 11.76%. The SD analysis results confirmed that BIM has a significant impact on reducing construction project delays.

11 July 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
AAAbdullah M. Alsugair
Abdullah M. Alsugair
Khalid Saad A. Al-GahtaniKhalid Saad A. Al-Gahtani
Khalid Saad A. Al-Gahtani
NANaif M. Alsanabani
Naif M. Alsanabani
AAAbdulmajeed A. Alabduljabbar
Abdulmajeed A. Alabduljabbar
AAAbdulmohsen Almohsen
Abdulmohsen Almohsen
Forecasting the final construction contract duration at an early stage plays a vital role in the progress of a project. An inaccurate project duration prediction may lead to the project’s benefits being lost. It is essential to precisely predict the duration due to the presence of several different factors. This paper contributed to developing a model to predict final construction contract duration (FCCD) in the early stages based on parameters characterized as few and shared for any contract. (contract cost, contract duration, and sector). This paper developed an Artificial Neural Network (ANN) model based on 135 Saudi construction project data. The development model has three stages. The first stage was standardization and augmentation using Zavadskas and Turskis’ logarithmic and Pasini methods. The second and third stages were the first and second analyses of the ANN models, respectively. The first analysis aimed to promote the used data and integrate them into the second analysis to develop the ANN model. The ANN models were compared with three linear regression (LR) models (LR1, LR2, and LR3) and other models in the literature. The results revealed that the accuracy of the ANN model provides reasonable accuracy with an average mean absolute percentage error (MAPE) of 12.22%, which is lower than the LR3′s MAPE by 27.03%. The accuracy of the ANN model is similar to that of earned value management (EVM) in the previous study. This paper supports research to deal with relatively little data and integrate them into a neural network. The ANN model assists the stakeholder in making appropriate decisions for the project during the pre-tendering phase by predicting the actual contract duration based on the CC, CD, and project sector.

13 February 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
MAMohammed A. Al-Ghamdi
Mohammed A. Al-Ghamdi
Khalid Saad A. Al-GahtaniKhalid Saad A. Al-Gahtani
Khalid Saad A. Al-Gahtani
Selecting a suitable heating, ventilation, and air-conditioning (HVAC) system is critical, because it impacts a building’s life cycle cost (LCC). Several factors affect the selection decision, such as quality, buildability, internal and external building appearance, HVAC size and weight, and LCC. These criteria are difficult to measure, as they are not based on agreed measurement units. Another challenging factor in the selection process is assessing the building’s function/performance and determining its HVAC needs. Currently, the decision depends mostly on expert knowledge, and there is no agreed-upon systematic method to follow. This paper aims to develop a systematic model for selecting HVAC systems based on the value engineering (VE) concept. The model identified fourteen criteria based on an agreed standard test for objective criteria and a typical evaluation for subjective criteria. These HVAC criteria were assessed using a combination of the AHP, pairwise, function analysis system (FAST), and Monte Carlo techniques. As a result, a complete model was developed to enhance the selection process, programmed within the building information modeling (BIM) environment platform. Several HVAC experts were interviewed and more than twenty expert opinions were collected to validate the model. In addition, a case study building in Riyadh, Saudi Arabia, was implemented using the programmed HVAC selection model for validation purposes. The programmed model can significantly facilitate the selection process for designers.