Shengxian Tang

Mr. Shengxian Tang


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
9 January 2023 in Buildings
Verified
Journal Article
Open access
PDF file
ZCZhuo Cheng
Zhuo Cheng
STShengxian Tang
Shengxian Tang
Hexu LiuHexu Liu
Hexu Liu
Zhen LeiZhen Lei
Zhen Lei
Due to its similarity to industrialized products, the offsite construction industry is seen as a focus for the transformation of Construction 4.0. Many digital technologies have been applied or have the potential to be applied to realize the integration of design, manufacturing, and assembly. The main objective of this review was to identify the current stage of applying digital technologies in offsite construction. In this review, 171 related papers from the last 10 years (i.e., 2013–2022) were obtained by collecting and filtering them. They were classified and analyzed according to the digital twin concept, application areas, and specific application directions. The results indicated that there are apparent differences in the utilization and development level of different technologies in different years. Meanwhile, the introduction, current stages, and benefits of different digital technologies are also discussed. Finally, this review summarizes the current popular fields and speculates on future research directions by analyzing article publication trends, which sheds light on future research.

15 March 2022 in Buildings
Verified
Journal Article
Open access
PDF file
STShengxian Tang
Shengxian Tang
Hexu LiuHexu Liu
Hexu Liu
Manea Mohammed AlmataredManea Mohammed Almatared
Manea Mohammed Almatared
Osama AbudayyehOsama Abudayyeh
Osama Abudayyeh
Zhen LeiZhen Lei
Zhen Lei
AFAlvis Fong
Alvis Fong
Construction-oriented quantity take-off (QTO) refers to the process of determining the quantities for construction items or work packages in accordance with their descriptions. However, the current construction-oriented QTO practice relies on estimators’ manual interpretation of work descriptions and manual processes to look up proper building objects for quantity calculation. Hence, this research aims to develop natural language processing (NLP) and rule-based algorithms to automate the information extraction (IE) from work descriptions for QTO in building construction. Specifically, several named entity recognition (NER) models, including Hidden Markov Model (HMM), Conditional Random Field (CRF), Bidirectional-Long Short-Term Memory (Bi-LSTM), and Bi-LSTM+CRF, were developed to identify construction activities, material, building component, product features, measurement unit, and additional information (e.g., work scope) from work descriptions. Cost items in the RSMeans database are used to evaluate the developed models in terms of F1 scores. HMM was found to achieve a 5% higher F1 score in the NER than the other three algorithms. Then, labeling rules and active learning strategies were applied along with the HMM model, which improved F1 score by 3% and reduced the labeling efforts by 26%. The results showed that the proposed IE method successfully interprets the desired information from the work description for QTO. This research contributed to the body of knowledge by the NLP-based information extraction model integrating HMM and formalized labeling rules that automatically process work descriptions and lay a foundation for automated QTO and cost estimation.