Manea Mohammed Almatared

Dr. Manea Mohammed Almatared

Civil Engineering, Najran University, Najrān, Saudi Arabia
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 October 2023 in Buildings
Verified
Journal Article
Open access
PDF file
OHObaidullah Hakimi
Obaidullah Hakimi
Hexu LiuHexu Liu
Hexu Liu
Osama AbudayyehOsama Abudayyeh
Osama Abudayyeh
AHAzim Houshyar
Azim Houshyar
Manea Mohammed AlmataredManea Mohammed Almatared
Manea Mohammed Almatared
AAAli Alhawiti
Ali Alhawiti
Effective civil infrastructure management necessitates the utilization of timely data across the entire asset lifecycle for condition assessment and predictive maintenance. A notable gap in current predictive maintenance practices is the reliance on single-source data instead of heterogeneous data, decreasing data accuracy, reliability, adaptability, and further effectiveness of engineering decision-making. Data fusion is thus demanded to transform low-dimensional decisions from individual sensors into high-dimensional ones for decision optimization. In this context, digital twin (DT) technology is set to revolutionize the civil infrastructure industry by facilitating real-time data processing and informed decision-making. However, data-driven smart civil infrastructure management using DT is not yet achieved, especially in terms of data fusion. This paper aims to establish a conceptual framework for harnessing DT technology with data fusion to ensure the efficiency of civil infrastructures throughout their lifecycle. To achieve this objective, a systematic review of 105 papers was conducted to thematically analyze data fusion approaches and DT frameworks for civil infrastructure management, including their applications, core DT technologies, and challenges. Several gaps are identified, such as the difficulty in data integration due to data heterogeneity, seamless interoperability, difficulties associated with data quality, maintaining the semantic features of big data, technological limitations, and complexities with algorithm selection. Given these challenges, this research proposed a framework emphasizing multilayer data fusion, the integration of open building information modeling (openBIM) and geographic information system (GIS) for immersive visualization and stakeholder engagement, and the adoption of extended industry foundation classes (IFC) for data integration throughout the asset lifecycle.

19 December 2023 in Buildings
Verified
Journal Article
Open access
PDF file
Manea Mohammed AlmataredManea Mohammed Almatared
Manea Mohammed Almatared
Hexu LiuHexu Liu
Hexu Liu
Osama AbudayyehOsama Abudayyeh
Osama Abudayyeh
OHObaidullah Hakimi
Obaidullah Hakimi
MSMohammed Sulaiman
Mohammed Sulaiman
In recent years, the implementation of digital twin (DT) technology has gained significant attention in various industries. However, the fire safety management (FSM) sector has been relatively slow in adopting this technology compared to other major industries. Therefore, this study aims to explore the limitations, opportunities, and challenges associated with adopting DT technology in the FSM sector and further develop a DT-based FSM framework towards smart facility management (FM). To achieve this objective, this research started by reviewing several promising DTs for FSM, including building information modeling (BIM), the Internet of Things (IoT), artificial intelligence (AI), and augmented reality (AR). On this basis, a conceptual framework was synthesized in consideration of the benefits of each technology. A questionnaire was conducted for FM professionals to evaluate the proposed framework and identify the challenges of adopting DT in the FSM sector. The survey results reveal that the proposed framework can assist decision makers in obtaining comprehensive information about facilities’ communication among stakeholders. The survey results validate the potential of the adoption of DTs toward smart FM practices in FSM. The survey results provide insights into the perception of DT technology among FM practitioners and identify the current state of DT technology in the FSM sector, its expected benefits, and its potential challenges. The main barriers to adopting DTs in FSM are a lack of knowledge about DTs, their initial costs, user acceptance, difficulties in systems integration, education training costs, a lack of competence, development complexity, difficulties in data management, and a lack of trust in data security.

7 March 2022
Verified
Conference Paper
Closed access
PDF file
Manea Mohammed AlmataredManea Mohammed Almatared
Manea Mohammed Almatared
HLHexu Liu
Hexu Liu
STShengxian Tang
Shengxian Tang
MSMohammed Sulaiman
Mohammed Sulaiman
ZLZhen Lei
Zhen Lei
HLHong Xian Li
Hong Xian Li
The architecture, engineering, and construction industry (AEC) is embracing digitization in the design, construction, and operation of built assets with the growing prominence of information technologies, such as building information modeling (BIM), internet of things (IoT), and artificial intelligence (AI). In this context, plenty of research efforts have been dedicated to digital twin (DT) applications. This research synthesizes state-of-art on DT in the AEC industry through bibliometric analysis, aiming to identify the research trends, challenges, and knowledge gaps in this growing area. A total of 75 publications regarding DT was identified and retrieved from Scopus. Then, VOSviewer was used for bibliometric analysis, including (1) keyword co-occurrence, and (2) citation analysis of selected publications. The identified research clusters and most-cited publications were discussed to clarify research trends and future needs. The findings revealed that future research should be directed to (1) data interoperability, (2) AIoT, and (3) AI. Moreover, extra research efforts should also be given to the DT applications during the design and construction phases of construction projects. This research contributes to the body of knowledge by quantitatively exposing research trends and needs for DT in the AEC industry.

15 March 2022 in Buildings
Verified
Journal Article
Open access
PDF file
STShengxian Tang
Shengxian Tang
Hexu LiuHexu Liu
Hexu Liu
Manea Mohammed AlmataredManea Mohammed Almatared
Manea Mohammed Almatared
Osama AbudayyehOsama Abudayyeh
Osama Abudayyeh
Zhen LeiZhen Lei
Zhen Lei
AFAlvis Fong
Alvis Fong
Construction-oriented quantity take-off (QTO) refers to the process of determining the quantities for construction items or work packages in accordance with their descriptions. However, the current construction-oriented QTO practice relies on estimators’ manual interpretation of work descriptions and manual processes to look up proper building objects for quantity calculation. Hence, this research aims to develop natural language processing (NLP) and rule-based algorithms to automate the information extraction (IE) from work descriptions for QTO in building construction. Specifically, several named entity recognition (NER) models, including Hidden Markov Model (HMM), Conditional Random Field (CRF), Bidirectional-Long Short-Term Memory (Bi-LSTM), and Bi-LSTM+CRF, were developed to identify construction activities, material, building component, product features, measurement unit, and additional information (e.g., work scope) from work descriptions. Cost items in the RSMeans database are used to evaluate the developed models in terms of F1 scores. HMM was found to achieve a 5% higher F1 score in the NER than the other three algorithms. Then, labeling rules and active learning strategies were applied along with the HMM model, which improved F1 score by 3% and reduced the labeling efforts by 26%. The results showed that the proposed IE method successfully interprets the desired information from the work description for QTO. This research contributed to the body of knowledge by the NLP-based information extraction model integrating HMM and formalized labeling rules that automatically process work descriptions and lay a foundation for automated QTO and cost estimation.

17 November 2025 in Buildings
Verified
Journal Article
Open access
PDF file
Manea Mohammed AlmataredManea Mohammed Almatared
Manea Mohammed Almatared
MSMohammed Sulaiman
Mohammed Sulaiman
AAAbdulaziz Alghamdi
Abdulaziz Alghamdi
ENEman Nasrallah
Eman Nasrallah
This study addresses the persistence of avoidable failures and efficiency losses in HVAC plants by introducing a field-validated predictive maintenance (PdM) framework that estimates component-level RUL from multiyear BMS telemetry and translates forecasts into schedule-aware maintenance actions. The objective was to determine whether an LSTM ensemble with mode-aware segmentation and isotonic calibration could yield decision-quality RUL forecasts that reduce unplanned outages, downtime, and electricity use in a large Riyadh office building. Two years of 1 min BMS data from chillers, primary pumps, and AHU fans were cleaned, standardized, and segmented by operating mode; RUL labels were derived from time-stamped work orders and failure confirmations; the LSTM produced per-minute RUL estimates trained with a Huber loss, calibrated to lower quantiles, and converted to sustained triggers compared against a fixed-interval program. On the held-out test set, the model achieved a weighted MAE of 19.8 ± 2.1 h and RMSE of 29.1 ± 3.3 h, with quantile calibration error (QCE) ≤0.06 and lead-time accuracy (LTA; fraction of triggers whose calibrated lower-quantile RUL is ≥ the planning threshold) of 0.79 at a 10-day threshold. When deployed in counterfactual evaluation, triggers reduced unplanned outages by 47.6% (paired bootstrap p = 0.008) and total downtime by 41.3% (p = 0.012), and yielded a 10.6% reduction in HVAC electricity (95% CI: 7.7–13.2%) and a 9.7% decrease in total operating cost. The findings indicate that calibrated sequence models coupled to simple sustained triggers can convert routine BMS data into reliable maintenance schedules with quantifiable reliability and energy benefits. Practically, conservative calibration (q approximately 0.25) with thresholds of 10–12 days provided stable lead windows; future work should assess transferability across climates and facility types using transfer learning and integrate uncertainty-aware triggering with MPC for joint operational and maintenance optimization.

13 December 2025 in Automation in Construction
Verified
Journal Article
Closed access
Manea Mohammed AlmataredManea Mohammed Almatared
Manea Mohammed Almatared
MAMaher Abuhussain
Maher Abuhussain
ZAZahra Andleeb
Zahra Andleeb
FBFaizah Mohammed Bashir
Faizah Mohammed Bashir