Recent advancements in green building technologies (GBTs) have grown substantially, as an outcome of the environmental, economic and societal benefits. It has the potential to move toward sustainable development, specifically related to climate change. In GBTs, the main objective is to use energy, water and other resources in a balanced way, without using them extensively. This will improve the environmental conditions. Green buildings (GBs) are beneficial when it comes to energy consumption and emissions; low maintenance and operation costs; boosting health and productivity; etc. There is a lack of a critical review of the past or present research work in the area of the Green Building Technology (GBT) sector to identify the future roadmap for sustainable green building technologies. A critical review, with the help of proper research methodology, was identified. The scope of this study is to analyze the existing work on different issues, and find different key issues in green building research, which has minimal use of natural resources, is cost-effective and is designed and constructed for a longer duration, considering future prospects. This paper examines the state of green building construction today and makes recommendations for further study and development which will be necessary for a sustainable future. In order to encourage research, this study also identified a few possible future research directions in sustainable development.
This paper proposes an effective approach to solve renewable distributed generators (RDGs) and electric vehicle charging station (EVCS) allocation problems in the distribution system (DS) to reduce power loss (PLoss) and enhance voltage profile. The RDGs considered for this work are solar, wind and fuel cell. The uncertainties related to RDGs are modelled using probability distribution functions (PDF). These sources’ best locations and sizes are identified by the voltage stability index (VSI) and political optimization algorithm (POA). Furthermore, EV charging strategies such as the conventional charging method (CCM) and optimized charging method (OCM) are considered to study the method’s efficacy. The developed approach is studied on Indian 28 bus DS. Different cases are considered, such as a single DG, multiple DGs and a combination of DGs and EVs. This placement of multiple DGs along with EVs, considering proper scheduling patterns, minimizes PLoss and considerably improves the voltage profile. Finally, the proposed method is compared with other algorithms, and simulated results show that the POA method produces better results in all aspects.
1 October 2011 in Renewable and Sustainable Energy Reviews
The increased popularity of small-scale DER has replaced the well-established concept of conventional generating plants around the world. In the present energy scenario, a significant share of energy production now comes from the grid integrated DERs installed at various consumer premises. These DERs are being renewable-based generates only intermittent power, which in turn makes the scheduling of electrical dispatch a tough task. The Virtual Power Plant (VPP) is a potential solution to this challenge, which coordinates and aggregates the DERs generation into a single controllable profile. In this paper, a modified PSO-based multi-objective optimization is proposed for the VPP scheduling in distribution network applications such as energy cost minimization, peak shaving, and reliability improvement. For feasibility analysis of the VPP, a case study of state power utility is taken, which includes a 90 bus industrial feeder with grid integrated PVs as DER. The optimized results are computed in both grid-connected and autonomous mode reveal that the operating cost, peak demand, and EENS are declined by 31.70%, 23.59%, and 62.30% respectively. The overall results obtained are compared by the results obtained from other well-established optimization techniques and it is found that the proposed technique is comparatively more cost-effective than others.
2 September 2019 in International Transactions on Electrical Energy Systems
The purpose of this research is to develop an efficient single-phase grid-connected PV system using a better performing asymmetrical multilevel inverter (AMI). Circuit component reduction, harmonic reduction, and grid integration are critical criteria for better inverter efficiency. The proposed inverter’s optimized topology requires seven unidirectional switches, three symmetric dc sources, and three diodes to produce an asymmetric fifteen level output; whereas, the same configuration will generate 7, 11, and 15-level output with an appropriate choice of dc source magnitudes. It is possible to reduce inverter losses and boost efficiency by decreasing the number of switches used. The integration of an asymmetric 15-level inverter with a grid-connected solar photovoltaic system is discussed in this article. A grid-connected solar photovoltaic (GCSPV) system is modelled and simulated using an asymmetric 15-level inverter. The dc sources of the 15-level inverter are replaced with PV sources. The results were analyzed with different operating temperatures and solar irradiance conditions. The GCSPV system is controlled by a closed-loop control system using Particle Swarm Optimization (PSO), Harris Hawk Optimization (HHO), and Hybrid Particle Swarm Optimization-Genetic Algorithm (PSOGA) based Proportional plus Integral (PI) controllers. Grid voltage, grid current, grid power, and total harmonic distortion (THD) of grid currents were analyzed. The performance of the 15-level asymmetric inverter was evaluated by comparing the THD of the grid current and the efficiency of the grid-connected photovoltaic system.