Chih-Chiang Fang

Prof. Chih-Chiang Fang


Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 June 2018 in IEEE Transactions on Engineering Management
Verified
Journal Article
Closed access
YHYeu-Shiang Huang
Yeu-Shiang Huang
CLChia-Jen Lin
Chia-Jen Lin
CFChih-Chiang Fang
Chih-Chiang Fang
Firms can appropriately recycle used products to not only save material costs, but also bring back customers to make repurchases. However, customers may return their used products at any time and in any condition, and firms may thus be unable to fully utilize the returned items in their remanufacturing activities. This study considers a firm that actively recycles its current product, and then sells both new and remanufactured items to the market to compete against a mainstream product produced by a large-scale rival firm, and proposes a two-stage model in which the current product is sold in the first stage and is then recycled in the second stage. The optimal pricing strategy for the current product under competition is determined for the sales stage. With regard to the recycling stage, consumer utility and product remaining value are considered to estimate the probability that customers would return their used products, which can then be remanufactured within the product life cycle. Two different recycling approaches for trade-in rebates are considered to collect used products, fixed timing recycling and continuous period recycling, to investigate their effects on the remanufacturing profitability. Under the assumptions of duopoly market and the two recycling approaches for trade-in rebates, the results indicate that when collecting used products at a fixed time point, the conditions of used products should be a significant concern, and when recycling in a continuous period, appropriately setting a starting timing for collecting used products on the market would be beneficial to the firm.

23 August 2022 in Quality and Reliability Engineering International
Verified
Journal Article
Closed access
YHYeu‐Shiang Huang
Yeu‐Shiang Huang
CFChih-Chiang Fang
Chih-Chiang Fang
SWStevan Wijaya
Stevan Wijaya

19 May 2022 in Mathematics
Verified
Journal Article
Open access
PDF file
QTQing Tian
Qing Tian
CFChih-Chiang Fang
Chih-Chiang Fang
CYChun-Wu Yeh
Chun-Wu Yeh
In the software development life cycle, the quality and reliability of software are critical to software developers. Poor quality and reliability not only cause the loss of customers and sales but also increase the operational risk due to unreliable codes. Therefore, software developers should try their best to reduce such potential software defects by undertaking a software testing project. However, to pursue perfect and faultless software is unrealistic since the budget, time, and testing resources are limited, and the software developers need to reach a compromise that balances software reliability and the testing cost. Using the model presented in this study, software developers can devise multiple alternatives for a software testing project, and each alternative has its distinct allocation of human resources. The best alternative can therefore be selected. Furthermore, the allocation incorporates debuggers’ learning and negligent factors, both of which influence the efficiency of software testing in practice. Accordingly, the study considers both human factors and the nature of errors during the debugging process to develop a software reliability growth model to estimate the related costs and the reliability indicator. Additionally, the issue of error classification is also extended by considering the impacts of errors on the system, and the expected time required to remove simple or complex errors can be estimated based on different truncated exponential distributions. Finally, numerical examples are presented and sensitivity analyses are performed to provide managerial insights and useful directions to inform software release strategies.

9 January 2023 in Symmetry
Verified
Journal Article
Open access
PDF file
THTao Huang
Tao Huang
CFChih-Chiang Fang
Chih-Chiang Fang
Software testing and debugging is a crucial part of the software development process since defective software not only incurs customer dissatisfaction but also might incur legal issues. However, the managers of a software development company cannot arbitrarily prolong their software debugging period due to their software testing budget and opportunity in the market. Accordingly, in order to propose an advantageous testing project, the managers should be aware of the influence of the testing project on cost, quality, and time to make the best decision. In this study, a new software reliability growth model (SRGM) with consideration of the testing staff’s learning effect is proposed to achieve better prediction. The methods of estimating the model’s parameters and the symmetric confidence intervals are also proposed in the study. Moreover, in the past, most of the SRGMs focused on a single software system. However, in practice, some software systems were developed using modular-based system engineering approaches. Therefore, traditional software testing work can be changed to multiple modular testing work in this scenario. Therefore, the manager can use this to dispatch multiple staff groups to perform the individual testing work simultaneously. The study proposes two mathematical programming models to handle the scheduling of modular testing work. Additionally, the design of a computerized decision support system is also proposed in the study for the application in practice.

15 May 2022 in Mathematics
Verified
Journal Article
Open access
PDF file
QTQing Tian
Qing Tian
CYChun-Wu Yeh
Chun-Wu Yeh
CFChih-Chiang Fang
Chih-Chiang Fang
In this study, an imperfect debugging software reliability growth model (SRGM) with Bayesian analysis was proposed to determine an optimal software release in order to minimize software testing costs and also enhance the practicability. Generally, it is not easy to estimate the model parameters by applying MLE (maximum likelihood estimation) or LSE (least squares estimation) with insufficient historical data. Therefore, in the situation of insufficient data, the proposed Bayesian method can adopt domain experts’ prior judgments and utilize few software testing data to forecast the reliability and the cost to proceed with the prior analysis and the posterior analysis. Moreover, the debugging efficiency involves testing staff’s learning and negligent factors, and therefore, the human factors and the nature of debugging process are taken into consideration in developing the fundamental model. Based on this, the estimation of the model’s parameters would be more intuitive and can be easily evaluated by domain experts, which is the major advantage for extending the related applications in practice. Finally, numerical examples and sensitivity analyses are performed to provide managerial insights and useful directions for software release strategies.

5 November 2022 in Systems
Verified
Journal Article
Open access
PDF file
CFChih-Chiang Fang
Chih-Chiang Fang
CHChin-Chia Hsu
Chin-Chia Hsu
JLJe-Hung Liu
Je-Hung Liu
In the past, most companies in developing countries usually own facilities or equipment for running their businesses. However, for some managerial and financial reasons, the situation may change. Recently, leasing facilities is becoming more popular than purchasing them. Furthermore, since the deterioration of equipment or facilities depends on both time and usage, when considering only one of the two factors, the deterioration estimation for the leased facilities could be distorted. Therefore, in such cases, a two-dimensional failure model would be appropriate for dealing with such problems. In this study, in order to determine the optimal lease decision for lessors, we use analytical models and efficient solution algorithms based on the two deterioration factors (time and usage). However, such complex mathematical models are difficult to apply in real cases, and therefore the study proposes the design of computerized system architecture and the corresponding solution algorithms to enhance the practicality of the applications. Besides, a nonhomogeneous Poisson process is employed to describe the successive failure times of the leased facility. Finally, the application and sensitivity analyses will provide managerial implications and suggestions for decision-makers under different preventive maintenance alternatives.