Yeu-Shiang Huang

Yeu-Shiang Huang

Auto-generated profile, based on publicly available information

Yeu-Shiang Huang

National Cheng Kung University

Research Focus & Metrics

Academic Career Length

23Years (2004-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2020 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
YHYeu-Shiang Huang
Yeu-Shiang Huang
CFChih-Chiang Fang
Chih-Chiang Fang
YLYing-An Lin
Ying-An Lin

12 December 2008 in Systems Research and Behavioral Science
Verified
Journal Article
Closed access
PDF file
YHYeu‐Shiang Huang
Yeu‐Shiang Huang
JLJing‐Tai Liao
Jing‐Tai Liao
ZLZu‐Liang Lin
Zu‐Liang Lin

1 December 2010 in Group Decision and Negotiation
Verified
Journal Article
Closed access
PDF file
YHYeu-Shiang Huang
Yeu-Shiang Huang
WLWei-Hao Li
Wei-Hao Li

21 February 2022 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
YHYeu-Shiang Huang
Yeu-Shiang Huang
CFChih-Chiang Fang
Chih-Chiang Fang
CLChang-Ming Lu
Chang-Ming Lu
TTTzu-Liang (Bill) Tseng
Tzu-Liang (Bill) Tseng

19 June 2018 in IEEE Transactions on Engineering Management
Verified
Journal Article
Closed access
YHYeu-Shiang Huang
Yeu-Shiang Huang
CLChia-Jen Lin
Chia-Jen Lin
CFChih-Chiang Fang
Chih-Chiang Fang
Firms can appropriately recycle used products to not only save material costs, but also bring back customers to make repurchases. However, customers may return their used products at any time and in any condition, and firms may thus be unable to fully utilize the returned items in their remanufacturing activities. This study considers a firm that actively recycles its current product, and then sells both new and remanufactured items to the market to compete against a mainstream product produced by a large-scale rival firm, and proposes a two-stage model in which the current product is sold in the first stage and is then recycled in the second stage. The optimal pricing strategy for the current product under competition is determined for the sales stage. With regard to the recycling stage, consumer utility and product remaining value are considered to estimate the probability that customers would return their used products, which can then be remanufactured within the product life cycle. Two different recycling approaches for trade-in rebates are considered to collect used products, fixed timing recycling and continuous period recycling, to investigate their effects on the remanufacturing profitability. Under the assumptions of duopoly market and the two recycling approaches for trade-in rebates, the results indicate that when collecting used products at a fixed time point, the conditions of used products should be a significant concern, and when recycling in a continuous period, appropriately setting a starting timing for collecting used products on the market would be beneficial to the firm.

18 December 2014 in International Journal of Production Research
Verified
Journal Article
Closed access
YHYeu-Shiang Huang
Yeu-Shiang Huang
RHRong-Shuan Ho
Rong-Shuan Ho
CFChih-Chiang Fang
Chih-Chiang Fang
Studies about supply chain coordination have emphasised maximising the profit of the overall supply chain, but the profit changes of individual members in the supply chain have often been overlooked. It has been shown that profit increment of the whole supply chain may not be beneficial for every individual member. Therefore, the use of quantity discounts to achieve the coordination of a supply chain is discussed in this article. A two-echelon selling system with a single buyer and multiple suppliers is considered to enhance profitability for both sides at the same time. An acceptable quantity discount condition for both the buyer and the suppliers to determine an appropriate order quantity allocation to produce more profits in the supply chain is proposed. Furthermore, the profit distribution between the buyer and each supplier is studied. Finally, the results of the numerical application show that the buyer should focus on managing the procurement costs to decrease the acquiring costs, and the suppliers should focus on the fixed costs of management to reduce the production costs in machine operations.