Zhifeng Qiu

Dr. Zhifeng Qiu


Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 September 2018 in IEEE Transactions on Automation Science and Engineering
Verified
Journal Article
Open access
YYYu Yang
Yu Yang
QJQing-Shan Jia
Qing-Shan Jia
XGXiaohong Guan
Xiaohong Guan
Xuan ZHANGXuan ZHANG
Xuan ZHANG
Zhifeng QiuZhifeng Qiu
Zhifeng Qiu
Geert DeconinckGeert Deconinck
Geert Deconinck
Electric vehicles (EVs) have experienced a rapid growth due to the economic and environmental benefits. However, the substantial charging load brings challenging issues to the power grid. Modern technological advances and the huge number of high-rise buildings have promoted the development of distributed energy resources, such as building integrated/mounted wind turbines. The issue to coordinate EV charging with locally generated wind power of buildings can potentially reduce the impacts of EV charging demand on the power grid. As a result, this paper investigates this important problem and three contributions are made. First, the real-time scheduling of EV charging is addressed in a centralized framework based on the ideas of model predictive control, which incorporates the volatile wind power supply of buildings and the random daily driving cycles of EVs among different buildings. Second, an EV-based decentralized charging algorithm (EBDC) is developed to overcome the difficulties due to: 1) the possible lack of global information regarding the charging requirements of all EVs and 2) the computational burden with the increasing number of EVs. Third, we prove that the EBDC method can converge to the optimal solution of the centralized problem over each planning horizon. Moreover, the performance of the EBDC method is assessed through numeric comparisons with an optimal and two heuristic charging strategies (i.e., myopic and greedy). The results demonstrate that the EBDC method can achieve a satisfactory performance in improving the scalability and the balance between the EV charging demand and wind power supply of buildings.

12 March 2021 in IEEE Transactions on Automation Science and Engineering
Verified
Journal Article
Closed access
JCJie Chen
Jie Chen
YGYuqian Guo
Yuqian Guo
Zhifeng QiuZhifeng Qiu
Zhifeng Qiu
BXBin Xin
Bin Xin
QJQing-Shan Jia
Qing-Shan Jia
WGWeihua Gui
Weihua Gui
Multiagent dynamic task assignment of forest fires is a complicated optimization problem because it requires the consideration of multiple factors, such as the spread speed of fires, firefighting speed of agents, the movement speed of agents, and the number of deployed agents. In this article, we investigate multiagent dynamic task assignment based on a forest fire point model, the objective of which is to minimize task completion time. First, we establish a model for the spread of fire and dynamic task assignments. Second, we prove that the optimal static task assignment always makes all task completion times the same under certain assumptions. Furthermore, we calculate the optimal solution to the static task assignment problem assuming no travel time for the agents, which provides the theoretical basis for the initial deployment and dynamic deployment. Third, we propose a dynamic task assignment scheme based on the global information, which ensures that every reassignment reduces the task completion time and makes all task completion times close to each other. Finally, the simulation is carried out on the MATLAB platform to verify the performance of the proposed dynamic task assignment scheme by comparing with a multistage global auction algorithm. We hope that this work provides insight for decision-makers designing reasonable assignment strategies based on the model and solving assignment optimization problem in different situations. Note to practitioners —The forest firefighting problem considered in this article is a typical multitask and multistage optimization problem. Many searching algorithms for multistage optimization problem are available in the existing literature. However, one of the main challenges is that the time of searching increases exponentially with the number of stages. This work first proves that the tasks are completed in the minimum amount of time, under the constraint of one-shot assignment. This finding helps us to evaluate the gap between the searching algorithm and the optimal solution. In addition, in practice, if the underlying dynamic process can be modeled or partially modeled, then we can predict the behavior of future stages and reduce the searching domain. If a model is available, then we can also adjust the assignment scheme dynamically based on the principle that each adjustment would reduce the total time of tasks completion. In this article, we establish a dynamical fire-spreading model and propose a model-based solution to the multistage optimization problems. The findings in this work can serve as a supplement to the existing optimization algorithms.

26 January 2015 in HIV Research & Clinical Practice
Verified
Journal Article
Closed access
TLTaisheng Li
Taisheng Li
JXJing Xie
Jing Xie
YLYijia Li
Yijia Li
JRJean-Pierre Routy
Jean-Pierre Routy
YLYanling Li
Yanling Li
HJHua Jiang
Hua Jiang
Despite combination antiretroviral therapy (cART), 20% of HIV-infected patients are unable to achieve adequate immunologic recovery, in which immune activation plays a crucial role. We hypothesize that extract of Tripterygium wilfordii Hook F (TwHF), a Chinese medication used to treat autoimmune diseases, has immunomodulatory effects that may help CD4 cell recovery. Eighteen cART-treated HIV-infected patients virally suppressed for over 12 months with suboptimal CD4 cell recovery were enrolled. TwHF extract was administered at a dosage of 10 mg three times daily for 12 months. T-cell subsets and activation markers were evaluated at baseline and during follow-up. The trial was registered at Clinicaltrials.gov (NCT02002286). TwHF extract was associated with a mean increase in CD4 cell count of 88 cells/μl (95% confidential interval [CI], 72-105 cells/μl) after one year of treatment. A significant increase in the mean rate of CD4 cell recovery (26 before vs 75 cells/μl/year after TwHF use, P < 0.001) was observed. Analysis of 13 patients with activation profiles suggested that TwHF extract was associated with a decrease in T-cell immune activation which was temporally correlated with CD4 cell recovery. No discontinuation of TwHF extract was reported. Use of TwHF extract in HIV-infected patients was associated with a reduction in T-cell activation and improved CD4 recovery with an excellent safety profile.

26 October 2020 in IEEE Transactions on Smart Grid
Verified
Journal Article
Closed access
BWBoyuan Wei
Boyuan Wei
Zhifeng QiuZhifeng Qiu
Zhifeng Qiu
Geert DeconinckGeert Deconinck
Geert Deconinck
A model-free distributed control scheme that implements active voltage control in low voltage distribution network (LVDN) is proposed. By solving an individual Hamilton-Jacobi-Bellman-Flemming function with public information, users can compute a good approximation to their optimal control trajectory and take uncertainties into account in a distributed manner. A detailed mathematical framework is given, accompanied by a discussion on the different entries of uncertainties. The proposed control scheme uses a broadcast signal to indicate the probability distribution in mean field theory, and to streamline the demand on Fokker-Planck-Kolmogorov PDE or Mc-Kean Vlasov SDE, which relieves the computational burden. A realistic semiurban distribution network is modified as the study case, with a benchmark of centralized ACOPF to study the performance of the proposed approach. Moreover, two special cases including communication latency and packet loss are given as well, in order to test the robustness of the proposed approach. The results prove that the proposed approach is able to deliver good approximation to the optimal control with uncertainty in a model-free and distributed manner.

4 March 2020 in MATEC Web of Conferences
Verified
Journal Article
Open access
PDF file
JXJinyong Xiang
Jinyong Xiang
Zhifeng QiuZhifeng Qiu
Zhifeng Qiu
QHQihan Hao
Qihan Hao
HCHuhui Cao
Huhui Cao
The accurate and reliable wind speed prediction can benefit the wind power forecasting and its consumption. As a continuous signal with the high autocorrelation, wind speed is closely related to the past and future moments. Therefore, to fully use the information of two direction, an auto-regression model based on the bi-directional long short term memory neural network model with wavelet decomposition (WT-bi-LSTM) is built to predict the wind speed at multi-time scales. The proposed model are validated by using the actual wind speed series from a wind farm in China. The validation results demonstrated that, compared with other four traditional models, the proposed strategy can effectively improve the accuracy of wind speed prediction.

21 March 2025 in Energies
Verified
Journal Article
Open access
PDF file
CYCaixin Yan
Caixin Yan
Zhifeng QiuZhifeng Qiu
Zhifeng Qiu
New power systems, predominantly based on renewable energy, necessitate active load-side management to effectively alleviate the pressures associated with balancing supply-side fluctuations and demand-side energy requirements. Concurrently, as power markets continue to evolve, both the energy market and ancillary services market offer valuable guidance for the optimal economic dispatch of industrial loads. Although substantial energy-saving potential exists within industrial production processes, their inherent complexity, dynamic nature, and mixed continuous–discrete modal characteristics present significant challenges in achieving accurate and efficient demand-side response. Conversely, the ongoing advancement of industrial internet techniques lays a robust technical foundation for the reliable, stable, and economically efficient operation of new power systems with large-scale industrial load response. This paper starts from the industrial load, discusses the resources and advantages and disadvantages of the industry itself, and carefully distinguishes the advantages and disadvantages of participating in the power market to make decisions. This paper provides a comprehensive review of intelligent optimization and regulation of industrial load flexibility in response to new power systems. Firstly, it synthesizes the three prevalent demand response strategies (load shedding, load shifting, and load substitution), along with their associated regulatory techniques, considering the operational characteristics of various industrial sectors. It then examines the trading strategies and modeling challenges of flexible industrial loads within two power market environments: the energy market and the ancillary services market. Subsequently, using the non-ferrous industry electrolytic process as a case study, it explores the optimization of production process parameters under energy usage planning. Finally, from the perspectives of market, technical innovation, and stakeholder engagement, it highlights the unresolved issues and provides insights into future research directions concerning the intelligent, digital, and market-driven integration of flexible industrial load flexibility.