Caixin Yan

Dr. Caixin Yan


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
21 March 2025 in Energies
Verified
Journal Article
Open access
PDF file
CYCaixin Yan
Caixin Yan
Zhifeng QiuZhifeng Qiu
Zhifeng Qiu
New power systems, predominantly based on renewable energy, necessitate active load-side management to effectively alleviate the pressures associated with balancing supply-side fluctuations and demand-side energy requirements. Concurrently, as power markets continue to evolve, both the energy market and ancillary services market offer valuable guidance for the optimal economic dispatch of industrial loads. Although substantial energy-saving potential exists within industrial production processes, their inherent complexity, dynamic nature, and mixed continuous–discrete modal characteristics present significant challenges in achieving accurate and efficient demand-side response. Conversely, the ongoing advancement of industrial internet techniques lays a robust technical foundation for the reliable, stable, and economically efficient operation of new power systems with large-scale industrial load response. This paper starts from the industrial load, discusses the resources and advantages and disadvantages of the industry itself, and carefully distinguishes the advantages and disadvantages of participating in the power market to make decisions. This paper provides a comprehensive review of intelligent optimization and regulation of industrial load flexibility in response to new power systems. Firstly, it synthesizes the three prevalent demand response strategies (load shedding, load shifting, and load substitution), along with their associated regulatory techniques, considering the operational characteristics of various industrial sectors. It then examines the trading strategies and modeling challenges of flexible industrial loads within two power market environments: the energy market and the ancillary services market. Subsequently, using the non-ferrous industry electrolytic process as a case study, it explores the optimization of production process parameters under energy usage planning. Finally, from the perspectives of market, technical innovation, and stakeholder engagement, it highlights the unresolved issues and provides insights into future research directions concerning the intelligent, digital, and market-driven integration of flexible industrial load flexibility.

4 October 2026 in Electronics
Verified
Journal Article
Open access
PDF file
CYCaixin Yan
Caixin Yan
Zhifeng QiuZhifeng Qiu
Zhifeng Qiu
Extreme-event restoration requires damaged distribution feeders to coordinate sequential line repair with time-dependent support from industrial microgrids. Temporary industrial load reduction releases capacity during outages but creates recovery obligations that compete with later load restoration and storage charging. We study a topology-aware restoration controller with staged correction of discrete network decisions and continuous industrial and storage actions, followed by bounded candidate screening. The modified IEEE 33-bus and 69-bus feeders are each evaluated over 440 matched physical scenarios and three independently trained policies, giving 3960 complete 96-step cases per feeder. Mean weighted grid energy not supplied is 7.268 versus 7.863 MWh for GS-HF and GS on IEEE33 and 5.640 versus 5.800 MWh on IEEE69. Their mean online decision times are 566.2 versus 18.8 ms and 3503.0 versus 24.2 ms, respectively. A separately certified 48-scenario IEEE33 encoder comparison with training seed 2027 yields 2.79% lower mean weighted EENS after removing inter-node message passing, so the complete-controller gains are not attributed to graph message passing. A matched 48-scenario industrial-storage sensitivity study and a completed CEPP action-chain audit provide additional implementation evidence. The demonstrated guarantee remains limited to the stated active-power, topology and industrial-resource model; online voltage, reactive-power and comprehensive AC feasibility are outside its scope.