Martin Hollender

Dr. Martin Hollender

ABB (Germany), Mannheim, Baden-Württemberg, Germany

Research Focus & Metrics

Academic Career Length

34Years (1993-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2017 in IFAC-PapersOnLine
Verified
Journal Article
Closed access
WHWenkai Hu
Wenkai Hu
TCTongwen Chen
Tongwen Chen
SSSirish L. Shah
Sirish L. Shah
MHMartin Hollender
Martin Hollender

1 August 2016 in Journal of Process Control
Verified
Journal Article
Closed access
CYChristos Yiakopoulos
Christos Yiakopoulos
KGKonstantinos Gryllias
Konstantinos Gryllias
MCMoncef Chioua
Moncef Chioua
MHMartin Hollender
Martin Hollender
IAIoannis Antoniadis
Ioannis Antoniadis

1 September 2016 in atp magazin
Verified
Journal Article
Closed access
PDF file
MAMartin Atzmueller
Martin Atzmueller
BKBenjamin Klöpper
Benjamin Klöpper
HMHassan Al Mawla
Hassan Al Mawla
BJBenjamin Jäschke
Benjamin Jäschke
MHMartin Hollender
Martin Hollender
GSGerd Stu
Gerd Stu
Big data technologies offer new opportunities for analyzing historical data generated by process plants. The development of new types of operator support systems (OSS) which help the plant operators during operations and in dealing with critical situations is one of these possibilities. The project FEE has the objective to develop such support functions based on big data analytics of historical plant data. In this contribution, we share our first insights and lessons learned in the development of big data applications and outline the approaches and tools that we developed in the course of the project.

1 January 2018 in IFAC-PapersOnLine
Verified
Journal Article
Open access
MLMatthieu Lucke
Matthieu Lucke
MCMoncef Chioua
Moncef Chioua
CGChriss Grimholt
Chriss Grimholt
MHMartin Hollender
Martin Hollender
NTNina F. Thornhill
Nina F. Thornhill

14 April 2024
Verified
Conference Paper
Open access
MHMartin Hollender
Martin Hollender
CXChaojun Xu
Chaojun Xu
RTRuomu Tan
Ruomu Tan
This talk summarizes important experiences we cultivated in several projects where we developed AI methods for industrial customers like chemical production plants or gas fired power plants. One might think that applying leading edge AI methods to large quantities of industrial data will automatically yield valuable results. In our experience there are many "traditional" obstacles that need to be removed, before the magic can happen [2]. For many use cases, data from various sources need to be integrated. For example, time series data stored in industrial Data Historians need to be labeled according to quality data stored in Laboratory Information Management Systems (LIMS). The process data like setpoints and raw material characteristics need to be contextualized using the production data, e.g. production orders, raw material lots, from ERP systems. Although many companies are currently building up enterprise data lakes, the reality in many plants still is that data is locked in separate silos and a real-time data integration requires significant efforts. Building, automating and operating a large industrial plant requires major (traditional) engineering efforts and expertise. Data scientists usually have different backgrounds and often lack knowledge, for example in control systems engineering and process engineering. In addition, many important engineering artifacts like Piping and Instrumentation Diagrams (P&ID) and process design document are either not up to date or even unavailable at all. However, in order to define relevant use cases and design powerful AI solutions, quite a high level of both traditional engineering and data science know-how is required. This means that traditional plant experts need to closely cooperate with data science experts. In the long run, software tools like ABB AbilityTM BatchInsight will be able to offer easy to use solutions for a broad class of use-cases, so that plant experts can use AI solutions without the need for additional consulting [3]. Many industrial AI methods work with time series data. A larger industrial plant like a refinery can have many tens of thousands different time series. In the best case a consistent hierarchical naming schema is available and for each time series a good description exists. In reality, it can be cumbersome to identify the best set of time series related to the use case at hand [1]. In addition, data quality needs to be ensured. For example, if sensors are not properly calibrated, using this data can destroy AI models. In one of our projects, a sensor was being replaced at a certain point in time and the measured value changed from power to current. For convenience and because of the typical time pressure during daily operation, the new value was stored in the old variable. Our AI methods identified this abrupt change in system behavior, however this finding had no value for the customer. Industrial plants and their subsystems have different operating states that often need to be clearly separated. For example, if a time interval where the plant was in fault condition is accidentally included to train a reference model, the quality of this model will degrade. In summary, various challenges exist in the application of industrial AI solutions. Our talk will provide our learnings in addressing these challenges and will help to ask the following five questions before starting an industrial AI project: • Can we define a use case with sufficient business value? • Are people both with domain expertise and with expertise in AI committed to the project? • Will the communication between domain experts and AI experts be good enough? • Is all required data available for the project in sufficient quantities? • Is the quality of the data sufficient or are additional preparation and cleaning efforts required?

11 October 2018 in IFAC-PapersOnLine
Verified
Journal Article
Open access
PDF file
MLMatthieu Lucke
Matthieu Lucke
MCMoncef Chioua
Moncef Chioua
CGChriss Grimholt
Chriss Grimholt
MHMartin Hollender
Martin Hollender
NTNina F. Thornhill
Nina F. Thornhill
Alarm systems based on engineering and safety considerations are the prime source of information for operators when it comes to abnormal situations. Conversely, the presence of fault detection and diagnosis algorithms in process plants is still limited, in comparison with other process control technologies. This work presents a simple way to integrate the information contained in the alarm systems into the fault detection and diagnosis algorithm. A normalisation of the process measurements based on the alarm thresholds is proposed, improving the robustness of the algorithm with regard to the variability of the measurements across fault occurrences in industrial systems.