In order to expand the simulation scale of smart substation, a simulation model of the inlet-outlet line unit, as described by the 0/108 S conductance for multivalued coefficients pre-storage is presented in this paper. As a part of orders decomposition, the address conversion circuit for multivalued coefficients can reduce the computational burden of processing elements. For the convenience of the generalization of the real-time digital solver based on FPGA (FRTDS, FPGA: Field–Programmable Gate Array), the address conversion circuit for multivalued coefficients is matched with the guide word, the formation module of sampled value (SV) packet, and the resolution module of generic object oriented substation event (GOOSE) packet are associated with the application identification (APPID) in the Ethernet frame. The address conversion circuit for multivalued coefficients, the formation module of SV packet, and the resolution module of GOOSE packet are reconstructed via the orders. A hardware-in-the-loop real-time simulation platform for smart substation is built based on the novel FRTDS. A case is given to demonstrate the simulation calculating capability and the hardware-in-the-loop ability of the novel FRTDS.
To meet the requirements of micro-grid real-time simulation, a novel real-time simulator for micro-grids based on Field-Programmable Gate Array (FPGA) and orders (FO-RTDS) is designed. We describe the design idea of the real-time solver and the order generator. Multi-valued parameter prestorage and multi-rate simulation are introduced to reduce the computational pressure. The data scheduling is carried out following the principle of saving the resources and the minimizing the average distance between variables. An example is performed on XC7VX690T-2FFG1761 chip, which proves the novel FO-RTDS method greatly improves the scale of real-time simulation of micro-grids.
To make the object of electromagnetic transient (EMT) simulation flexible to change, the authors propose using the method of electromagnetic transient-transient stability analysis (TSA) hybrid real-time simulation of the variable area of interest. The area where the fault is to be set, or where the operation takes place, is defined as the area of interest. The simulation object is divided into multiple sub-networks. The EMT simulation range is determined according to the voltage drop depth at the boundary of the adjacent sub-network caused by the three-phase short-circuit fault at the boundary of an area of interest. The Norton equivalent is obtained by using the sub-network as a basic unit. The electromagnetic sub-network forms its own Norton equivalent on the TSA side by means of the Norton equivalent admittance of its TSA model. Based on this, the overall framework of hybrid real-time simulation of the variable area of interest is constructed. The fundamental phasor prediction and Norton equivalent current source prediction are adopted to reduce the interface error. The performance of the proposed method in terms of feasibility, flexibility, and effectiveness have been verified by the simulation studies on the IEEE 118-bus system.
A field-programmable gate array (FPGA)-based digital solver for real-time electromechanical transient simulation is designed in this paper. The solving process for a device or sub-network in an electromechanical transient simulation is packaged into the orders in soft function solvers. The orders are reused by soft function solvers that are invoked by microprocessor cores. The data exchange between the microprocessor cores and soft function solvers is enhanced through explicit and implicit channels. The orders of the microprocessor cores are stored in the synchronous dynamic random access memory on the FPGA board, which solves the problem of insufficient storage space for the orders in electromechanical transient simulation. A real-time digital solver for electromechanical transient simulation, whose feasibility is verified by a simulation of part of the power system in East China, is successfully constructed by applying a small number of microprocessor cores and multiple soft function solvers.
The microgrid containing a large amount of high frequency power switches and nonlinear components has put forward high requirements for power system real-time simulation technology. Multivalued coefficient prestorage can reduce the calculation steps in real-time simulation. In order to reduce the storage pressure of the multivalued coefficients, the whole network is divided into multiple subnetworks that can be simulated in parallel, and only the parameters for computing input variables and internal variables are prestored. The multiport hybrid equivalent is performed to reduce the number of simultaneous network equations. The input variables are tied to state variables of the circuit so that the iterative calculation is limited to the local network. The devised methodology is validated through simulation of a low-voltage microgrid on a field programmable gate array (FPGA)-based real-time digital simulation (FRTDS) platform at a 5 μs time step. Comparison with a power systems computer aided design (PSCAD)/electromagnetic transients including DC (EMTDC) model shows that the proposed method is effective.
Considering the rational use of field programmable gate array (FPGA) resources, this paper proposes a new FPGA-based real-time digital solver (FRTDS) for power system simulation. Based on the relationship between the number of computing components, the operating frequency, and the pipeline length, the best selection principle is given. By analyzing the implementation method of the Multi-Port Read/Write Circuit, the computing formula of the Look-Up-Table (LUT) consumption was derived. Given the excessive use of LUTs in the original computing components, the computing components were assembled in a single typical arithmetic expression of the power system simulation program, as the basic computing formula was characterized by a subset of the typical computing formula and multiple uses of the same variable. Data communication between different computing components was realized by using Multi-Port Input Circuits that share some outputs of read controller, and Multi-Port Output Circuits, which share some outputs of computing cores. According to the test results of original FRTDS and new FRTDS, it was found that the solution proposed in this paper had a shorter ideal simulation time and a higher parallel computing capability, which was very suitable for real-time digital simulation of power systems.