Bingda Zhang

Bingda Zhang


Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 September 2019 in Energies
Verified
Journal Article
Open access
PDF file
STSijia Tu
Sijia Tu
BZBingda Zhang
Bingda Zhang
XJXianglong Jin
Xianglong Jin
With the increasing penetration of wind power generation, the frequency regulation burden on conventional synchronous generators has become heavier, as the rotor speed of doubly-fed induction generator (DFIG) is decoupled with the system frequency. As the frequency regulation capability of wind farms is an urgent appeal, the inertia control of DFIG has been studied by many researchers and the energy storage (ES) system has been installed in wind farms to respond to frequency deviation with doubly-fed induction generators (DFIGs). In view of the high allocation and maintenance cost of the ES system, the capacity allocation scheme of the ES system—especially for fast-frequency response—is proposed in this paper. The capacity allocation principle was to make the wind farm possess the same potential inertial energy as that of synchronous generators set with equal rated power. After the capacity of the ES system was defined, the coordinated control strategy of the DFIG-ES system with consideration of wind speed was proposed in order to improve the frequency nadir during fast-frequency response. The overall power reference of the DFIG-ES system was calculated on the basis of the frequency response characteristic of synchronous generators. In particular, once the power reference of DFIG was determined, a novel virtual inertia control method of DFIG was put forward to release rotational kinetic energy and produce power surge by means of continuously modifying the proportional coefficient of maximum power point tracking (MPPT) control. During the deceleration period, the power reference smoothly decreased with the rotor speed until it reached the MPPT curve, wherein the rotor speed could rapidly recover by virtue of wind power so that the secondary frequency drop could be avoided. Afterwards, a fuzzy logic controller (FLC) was designed to distribute output power between the DFIG and ES system according to the rotor speed of DFIG and S o C of ES; thus the scheme enabled the DFIG-ES system to respond to frequency deviation in most cases while preventing the secondary frequency drop and prolonging the service life of the DFIG-ES system. Finally, the test results, which were based on the simulation system on MATLAB/Simulink software, verified the effectiveness of the proposed control strategy by comparison with other control methods and verified the rationality of the designed fuzzy logic controller and proposed capacity allocation scheme of the ES system.

7 November 2017 in Energies
Verified
Journal Article
Open access
PDF file
BZBingda Zhang
Bingda Zhang
YWYanjie Wu
Yanjie Wu
ZJZhao Jin
Zhao Jin
YWYang Wang
Yang Wang
In order to expand the simulation scale of smart substation, a simulation model of the inlet-outlet line unit, as described by the 0/108 S conductance for multivalued coefficients pre-storage is presented in this paper. As a part of orders decomposition, the address conversion circuit for multivalued coefficients can reduce the computational burden of processing elements. For the convenience of the generalization of the real-time digital solver based on FPGA (FRTDS, FPGA: Field–Programmable Gate Array), the address conversion circuit for multivalued coefficients is matched with the guide word, the formation module of sampled value (SV) packet, and the resolution module of generic object oriented substation event (GOOSE) packet are associated with the application identification (APPID) in the Ethernet frame. The address conversion circuit for multivalued coefficients, the formation module of SV packet, and the resolution module of GOOSE packet are reconstructed via the orders. A hardware-in-the-loop real-time simulation platform for smart substation is built based on the novel FRTDS. A case is given to demonstrate the simulation calculating capability and the hardware-in-the-loop ability of the novel FRTDS.

21 August 2017 in Energies
Verified
Journal Article
Open access
PDF file
BZBingda Zhang
Bingda Zhang
SFShaowen Fu
Shaowen Fu
ZJZhao Jin
Zhao Jin
RHRuizhao Hu
Ruizhao Hu
To meet the requirements of micro-grid real-time simulation, a novel real-time simulator for micro-grids based on Field-Programmable Gate Array (FPGA) and orders (FO-RTDS) is designed. We describe the design idea of the real-time solver and the order generator. Multi-valued parameter prestorage and multi-rate simulation are introduced to reduce the computational pressure. The data scheduling is carried out following the principle of saving the resources and the minimizing the average distance between variables. An example is performed on XC7VX690T-2FFG1761 chip, which proves the novel FO-RTDS method greatly improves the scale of real-time simulation of micro-grids.

13 October 2018 in Energies
Verified
Journal Article
Open access
PDF file
BZBingda Zhang
Bingda Zhang
RHRuizhao Hu
Ruizhao Hu
STSijia Tu
Sijia Tu
JZJie Zhang
Jie Zhang
XJXianglong Jin
Xianglong Jin
JZJunjie Zhu
Junjie Zhu
In order to expand the simulation scale of the real-time digital solver based on FPGA (FRTDS, FPGA: field-programmable gate array), the power system modeling process is optimized. The multi-valued parameter method is used to represent the external characteristics of the equipment. The methods of addressing the equivalent admittance and voltage coefficient of the interval unit are discussed in detail. The serial degree of the simulation script is effectively reduced. The disadvantageous effects of asymmetric elements and nonlinear elements on node elimination are analyzed. The elimination order of nodes is determined according to the minimum estimate of the execution time of the simulation script. According to the proposed method to reduce the serial degree and calculation time of the simulation script, software for generating an electromagnetic transient simulation script for power systems is developed. The effectiveness of the software is verified by an example.

1 October 2018 in Energies
Verified
Journal Article
Open access
PDF file
BZBingda Zhang
Bingda Zhang
SNShipei Nie
Shipei Nie
ZJZhao Jin
Zhao Jin
To make the object of electromagnetic transient (EMT) simulation flexible to change, the authors propose using the method of electromagnetic transient-transient stability analysis (TSA) hybrid real-time simulation of the variable area of interest. The area where the fault is to be set, or where the operation takes place, is defined as the area of interest. The simulation object is divided into multiple sub-networks. The EMT simulation range is determined according to the voltage drop depth at the boundary of the adjacent sub-network caused by the three-phase short-circuit fault at the boundary of an area of interest. The Norton equivalent is obtained by using the sub-network as a basic unit. The electromagnetic sub-network forms its own Norton equivalent on the TSA side by means of the Norton equivalent admittance of its TSA model. Based on this, the overall framework of hybrid real-time simulation of the variable area of interest is constructed. The fundamental phasor prediction and Norton equivalent current source prediction are adopted to reduce the interface error. The performance of the proposed method in terms of feasibility, flexibility, and effectiveness have been verified by the simulation studies on the IEEE 118-bus system.

8 December 2019 in Energies
Verified
Journal Article
Open access
PDF file
BZBingda Zhang
Bingda Zhang
XJXianglong Jin
Xianglong Jin
STSijia Tu
Sijia Tu
ZJZhao Jin
Zhao Jin
JZJie Zhang
Jie Zhang
Considering the rational use of field programmable gate array (FPGA) resources, this paper proposes a new FPGA-based real-time digital solver (FRTDS) for power system simulation. Based on the relationship between the number of computing components, the operating frequency, and the pipeline length, the best selection principle is given. By analyzing the implementation method of the Multi-Port Read/Write Circuit, the computing formula of the Look-Up-Table (LUT) consumption was derived. Given the excessive use of LUTs in the original computing components, the computing components were assembled in a single typical arithmetic expression of the power system simulation program, as the basic computing formula was characterized by a subset of the typical computing formula and multiple uses of the same variable. Data communication between different computing components was realized by using Multi-Port Input Circuits that share some outputs of read controller, and Multi-Port Output Circuits, which share some outputs of computing cores. According to the test results of original FRTDS and new FRTDS, it was found that the solution proposed in this paper had a shorter ideal simulation time and a higher parallel computing capability, which was very suitable for real-time digital simulation of power systems.