Weiling Jiang

Dr. Weiling Jiang

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2021 in Journal of Cleaner Production
Verified
Journal Article
Closed access
Weiling JiangWeiling Jiang
Weiling Jiang
IMIgor Martek
Igor Martek

24 February 2022 in Polish Journal of Environmental Studies
Verified
Journal Article
Closed access
YZYing Zhou
Ying Zhou
CYChen Yuan
Chen Yuan
LZLi Zhuolu
Li Zhuolu
Weiling JiangWeiling Jiang
Weiling Jiang
The rapid development of Chengdu-Chongqing Economic Circle (CCEC) has caused damage to the ecological environment. Exploring changes in the ecological resilience of Chengdu-Chongqing Economic Circle and improving post-disaster resilience will help improve the green, healthy and sustainable development of similar urban agglomerations in Chengdu-Chongqing Economic Circle. Considering 16 cities in Chengdu-Chongqing Economic Circle as examples, this paper uses the entropy and the linear weighting methods to calculate the ecological resilience level of Chengdu-Chongqing Economic Circle. Using the obstacle degree model, the paper studies the influence factors of ecological resilience level. Finally, Moran's I is used to study the spatial autocorrelation of the ecological resilience of Chengdu-Chongqing Economic Circle. The results show: (1) The overall ecological resilience level of Chengdu-Chongqing Economic Circle is showing an upward trend, but it is currently at an intermediate stage. (2) Disasters have a greater impact on the level of ecological resilience. (3) The spatial autocorrelation of CCEC has changed from negative correlation to positive correlation and then to negative correlation.

31 October 2023 in Journal of Cleaner Production
Verified
Journal Article
Closed access
LGLu Gan
Lu Gan
QWQuaner Wen
Quaner Wen
Benjamin LevBenjamin Lev
Benjamin Lev
Weiling JiangWeiling Jiang
Weiling Jiang

7 November 2022 in Buildings
Verified
Journal Article
Open access
PDF file
Weiling JiangWeiling Jiang
Weiling Jiang
QYQianying Yang
Qianying Yang
JJJie Jiang
Jie Jiang
IMIgor Martek
Igor Martek
FGFanjie Gao
Fanjie Gao
Public–private partnerships (PPPs) are widely applied in the procurement of capital infrastructure, encompassing phases such as financing, design, construction, operation, and transfer. Of these, the operational phase of PPPs is particularly critical to project success given this is when revenues are generated, and costs recouped. However, the revenue stream will be exposed to numerous risks over the relatively long period of infrastructure operation. Management of PPP operational risk is therefore critical. Despite this importance, research dedicated to PPP operational risk management remains limited. Thus, this paper addresses this deficiency by systematically reviewing related studies and proposing an operational risk management framework. A qualitative bibliometric literature review is conducted on 60 papers pertinent to operational risk management, published across 12 peer review journals. Findings reveal that the industry lacks a systematic operational risk factor list, while the impacts of risks are rarely considered when allocating operational risk factors, and moreover that the research on the selection and efficacy of operational risk management strategies remains undeveloped. This study reveals where further efforts in the research of operational risk management of PPP infrastructure projects could be more fruitfully applied.

16 December 2024 in Energy Policy
Verified
Journal Article
Closed access
Weiling JiangWeiling Jiang
Weiling Jiang
KJKeyao Jiang
Keyao Jiang
ZZZhihao Zhang
Zhihao Zhang
IMIgor Martek
Igor Martek
CRCongping Ruan
Congping Ruan
GLGan Lu
Gan Lu

10 August 2023 in PLOS ONE
Verified
Journal Article
Open access
PDF file
WJWen Jiang
Wen Jiang
KSKanfeng Shi
Kanfeng Shi
LZLin Zhang
Lin Zhang
Weiling JiangWeiling Jiang
Weiling Jiang
In the prefabricated construction industry, consumers are sensitive to the construction delivery time, and different power structures are very common. This research uses methods of Stackelberg game, Nash game and supply chain coordination, introduces a manufacturer crashing strategy into a prefabricated construction supply chain and investigates the assembler pricing, manufacturer crashing, and supply chain coordination strategies under three different power structures. It finds that adopting a crashing strategy improves the supply chain’s profit, while the dynamic wholesale price contract achieves supply chain coordination. Meanwhile, when consumer time and price sensitivity are low, it is easier to achieve high profits in the supply chain under unequal power distribution. Conversely, the supply chain profit is higher in the case of a Nash game. This study innovatively introduces the thought of power structure and crashing strategy into the prefabricated construction supply chain, and provides the optimal price and delivery time under three different power structures for prefabricated construction enterprises and realizes supply chain coordination. The conclusion can provide decision suggestions for the prefabricated construction enterprises under different competitive environments.