Kexin Zhang

Dr. Kexin Zhang


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2021 in Journal of Performance of Constructed Facilities
Verified
Journal Article
Closed access
PDF file
KZKexin Zhang
Kexin Zhang
TQTianyu Qi
Tianyu Qi
ZZZhimin Zhu
Zhimin Zhu
XXXingwei Xue
Xingwei Xue
XSXinyuan Shen
Xinyuan Shen
This paper describes an innovative technique, a composite of prestressed steel wire ropes (PSWRs) embedded in polyurethan-cement composite (PUC), used to strengthen a 34-year-old reinforced T-beam bridge. PUC was mixed with polyurethane raw material and cement to provide good mechanical properties. Compared to using polymer mortar for PSWR strengthening, using PUC not only increased the durability of the steel wire ropes but also reinforced the main beams in the PSWR-PUC-strengthened composite. To study the effect of polyurethane cement, one span of the bridge was reinforced by a composite of PSWRs embedded in polymer mortar (PM). Static and dynamic load tests were carried out to test the corresponding responses of the experimental bridge. A finite-element model was used to verify the bridge test results. This study showed that the structural capacity and performance of the bridge were enhanced with PSWR-PUC strengthening. Compared with PSWR-PM reinforced spans with more prestressed steel wire ropes, PSWR-PUC reinforced spans retained good structural capacity.

1 May 2024 in Journal of Bridge Engineering
Verified
Journal Article
Closed access
KZKexin Zhang
Kexin Zhang
JXJingqing Xuan
Jingqing Xuan
XSXinyuan Shen
Xinyuan Shen
XXXingwei Xue
Xingwei Xue

24 August 2022 in Structures
Verified
Journal Article
Closed access
KZKexin Zhang
Kexin Zhang
XSXinyuan Shen
Xinyuan Shen
JLJicheng Liu
Jicheng Liu
FTFei Teng
Fei Teng
GZGuanhua Zhang
Guanhua Zhang
JWJiawei Wang
Jiawei Wang

25 March 2024 in Buildings
Verified
Journal Article
Open access
PDF file
XZXilong Zheng
Xilong Zheng
JJJiashuo Jian
Jiashuo Jian
LLLei Liu
Lei Liu
BSBaitao SUN
Baitao SUN
KZKexin Zhang
Kexin Zhang
HGHongshuai Gao
Hongshuai Gao
Cable-stayed bridges have been widely used in large-span bridge engineering because of their large span capacity and novel structure. The frequent traffic of vehicles transporting flammable and explosive materials has increased the incidence of bridge fires. After being burned, the cable-stayed bridge will suffer from varying degrees of damage, which affects its performance. Therefore, mechanical analysis and evaluation of the fire-damaged cable-stayed bridge are necessary. Due to the development of technology, the structural analysis of cable-stayed bridges has gradually shifted from experimental methods to numerical simulation or artificial intelligence methods, and from local performance research to holistic research. In this paper, a fire accident in the Sifangtai Bridge in Harbin, China, is taken as a case study. Finite element software and damage theory calculation methods were used, and the static and dynamic performances of the bridge under the condition of cable fire damage were analyzed. The results show that the variation of cable force during the movement of vehicle load along the bridge is relatively small, within the range of 7% to 12%. The fusing of the upper cables of the bridge tower has the greatest impact on the deflection of the beam, while the fusing of lower cables has the same impact on the deflection of the entire bridge as the undamaged state. Near the fused cables, cable forces change significantly, increasing by over 20%. As the degree of damage increases, the increase in deflection of the beam becomes more pronounced. The impact of different degrees of cable damage on the dynamic performance of cable-stayed bridges is reflected in quantitative changes. As the degree of cable damage and the amount of fusing increase, the change in structural frequency becomes more pronounced. This paper not only provides technical support and a theoretical basis for the performance analysis of cable-stayed bridges damaged by fire, but it also improves the research content of combining static and dynamic performance, which provides important reference values for similar research in the future.

31 August 2021 in International Journal of Structural Integrity
Verified
Journal Article
Closed access
KZKexin Zhang
Kexin Zhang
TQTianyu Qi
Tianyu Qi
DLDachao Li
Dachao Li
XXXingwei Xue
Xingwei Xue
ZZZhimin Zhu
Zhimin Zhu
Purpose: The paper aims to investigate effectiveness of the strengthening method, the construction process monitoring, fielding-load tests before and after strengthening, and health monitoring after reinforcement were carried out. The results of concrete strain and deflection show that the flexural strength and stiffness of the strengthened beam are improved.Design/methodology/approach: This paper describes prestressed steel strand as a way to strengthen a 25-year-old continuous rigid frame bridge. High strength, low relaxation steel strand with high tensile strain and good corrosion resistance were used in this reinforcement. The construction process for strengthening with prestressed steel strand and steel plate was described. Ultimate bearing capacity of the bridge after strengthening was discussed based on finite element model.Findings: The cumulative upward deflection of the second span the third span was 39.7 mm, which is basically consistent with the theoretical value, and the measured value is smaller than the theoretical value. The deflection value of the second span during data acquisition was −20 mm–10 mm, which does not exceed the maximum deflection value of live load, and the deflection of the bridge is in a safe state during normal use. Thus, this strengthened way with prestressed steel wire rope is feasible and effective.Originality/value: This paper describes prestressed steel strand as a way to strengthen a 25-year-old continuous rigid frame bridge. To investigate effectiveness of the strengthening method, the construction process monitoring, fielding-load tests before and after strengthening and health monitoring after reinforcement were carried out.

1 January 2022 in Structural Durability & Health Monitoring
Verified
Journal Article
Open access
KZKexin Zhang
Kexin Zhang
TQTianyu Qi
Tianyu Qi
DLDachao Li
Dachao Li
XXXingwei Xue
Xingwei Xue
YLYanfeng Li
Yanfeng Li
This paper presents the method of reinforcing main girder of reinforced concrete cable-stayed bridge with prestressed steel strands. To verify the effectiveness of external prestressed strand reinforcement method. Static load tests and health monitoring-based assessment were carried out before and after reinforcement. Field load test shows that the deflection and stress values of the main girder are reduced by 10%~20% after reinforcement, and the flexural strength and stiffness of the strengthened beam are improved. The deflection and strain data of health monitoring of the specified section are collected. The deflection of the second span is 4 mm~10 mm, the strain range of the upper edge of the second span is -10 με~-40 με, and the strain range of the lower edge is 30 με~75 με. These values show the deflection and strain values fluctuate within a prescribed range, verifying the safety of the bridge. The reinforcement method of prestressed steel strand is feasible and effective. It can provide reference basis for the application of external prestressed strand reinforcement technology in similar projects.