1 December 2015 in Polymer
31 August 2021 in International Journal of Structural Integrity
Purpose: The paper aims to investigate effectiveness of the strengthening method, the construction process monitoring, fielding-load tests before and after strengthening, and health monitoring after reinforcement were carried out. The results of concrete strain and deflection show that the flexural strength and stiffness of the strengthened beam are improved.Design/methodology/approach: This paper describes prestressed steel strand as a way to strengthen a 25-year-old continuous rigid frame bridge. High strength, low relaxation steel strand with high tensile strain and good corrosion resistance were used in this reinforcement. The construction process for strengthening with prestressed steel strand and steel plate was described. Ultimate bearing capacity of the bridge after strengthening was discussed based on finite element model.Findings: The cumulative upward deflection of the second span the third span was 39.7 mm, which is basically consistent with the theoretical value, and the measured value is smaller than the theoretical value. The deflection value of the second span during data acquisition was −20 mm–10 mm, which does not exceed the maximum deflection value of live load, and the deflection of the bridge is in a safe state during normal use. Thus, this strengthened way with prestressed steel wire rope is feasible and effective.Originality/value: This paper describes prestressed steel strand as a way to strengthen a 25-year-old continuous rigid frame bridge. To investigate effectiveness of the strengthening method, the construction process monitoring, fielding-load tests before and after strengthening and health monitoring after reinforcement were carried out.
1 April 2022 in Journal of Performance of Constructed Facilities
This paper introduces a method of strengthening prestressed concrete continuous box-girder bridges with prestressed steel strands. Construction process monitoring, field load tests before and after reinforcement, and health monitoring after reinforcement were performed to verify the effectiveness of the external prestressed steel strand reinforcement method. During the construction monitoring process, the measured values of each tensioning step are basically consistent with the theoretical values, but the measured values are slightly less than the theoretical values. The results of the field load tests show that the bending strength and stiffness of the strengthened girder have been improved. During health monitoring, the strain value and deflection value data for some parts across the specified section were collected. According to the data, the strain and deflection values fluctuated within the specified limit, and the bridge was always in a safe state.
17 June 2021 in International Journal of Structural Integrity
Purpose: In order to understand the status of the bridge reinforcement process, the construction process monitoring of the reinforced bridge is carried out. The T-beam bridge was tested using the truck loading test. The displacements and concrete strains of the bridge at mid-span were measured during the test.Design/methodology/approach: This paper describes an innovative technique, external prestressing, used to strengthen a 36-year-old prestressed T-beam bridge. This paper introduces the construction process of the prestressed reinforcement method, and makes a theoretical analysis of the reinforced bridge through the establishment of the reinforcement model.Findings: This study showed that the structural capacity and performance of the bridge were enhanced with externally prestressed steel strand strengthening.Originality/value: The innovative reinforcement method of prestressed T-shaped bridge is put forward, which has guiding significance for similar bridge reinforcement and maintenance.
4 November 2021 in International Journal of Building Pathology and Adaptation
Purpose: This paper aims to describe carbon fiber reinforced plastics (CFRP) bars as a way to strengthen a 40-year-old stone arch bridge. To investigate effectiveness of the strengthening method, fielding-load tests were carried out before and after strengthening.Design/methodology/approach: High-strength CFRP bars with minor radius, high tensile strain and good corrosion resistance were used in this reinforcement. The construction process for strengthening with CFRP bars – including CFRP bars cutting, crack grouting, original structural surface treatment, implant drilling, CFRP bars installation and pouring mortar – was described. Ultimate bearing capacity of the bridge after strengthening was discussed.Findings: The results of concrete stress and deflection show that the strength and stiffness of the strengthened bridge are improved. The strengthened way with CFRP bars is feasible and effective.Originality/value: This paper describes CFRP bars as a way to strengthen a 40-year-old stone arch bridge.
7 December 2021 in Proceedings of the Institution of Civil Engineers - Bridge Engineering
To ensure the structural safety and normal operation of a cable-stayed bridge in China (Rainbow Bridge), cables were replaced and construction monitoring and control were conducted. In the process of cable replacements, the cable force and girder elevation were monitored and the distribution of cable force was adjusted according to the construction monitoring results to improve the structural force and increase the safety reserve of the structure. In the process of monitoring the cable force, the difference between the measured cable force and the design cable force was 0.4–4.4%. After adjusting the cable force, the difference between the measured cable force and the design cable force was less than 2%, and the change in the cable force was uniform, meeting the original design requirements. In the monitoring process of the main girder elevation, the elevation was increased by a maximum of 0.054 m. After completing cable adjustment, the main girder elevation was increased by 0–5 mm. This elevation was more reasonable and met the design requirements.