yixuan wang

Ms. yixuan wang

North China Electric Power University, Baoding, Hebei, China
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 March 2022 in Energies
Verified
Journal Article
Open access
PDF file
ZXZhi Xu
Zhi Xu
JTJianxiong Tang
Jianxiong Tang
YJYupeng Jiang
Yupeng Jiang
YWyixuan wang
yixuan wang
HMHongsheng Ma
Hongsheng Ma
CZChengyong Zhao
Chengyong Zhao
With the rapid development of cities and the increasing complexity of distribution network systems, the cableization of transmission lines and the diversification of power users have brought new challenges to the supply reliability of distribution networks. Short-time outages caused by power outages and maintenance are one of the factors that affect the reliability of the power supply in the distribution network. The non-stop load transfer through a phase-shifting transformer (PST) operation can effectively improve the reliability of power supply to complex distribution systems. Considering the operation mode and structure form and fault type of the urban distribution network in China, comparing and analyzing the applicable scenarios of different neutral grounding methods, and based on the structure and zero sequence path characteristics of PST, an improved PST-based phase shifting and grounding transformer loop closing device with low power consumption is proposed. The fault characteristics of the PST-based loop closing device under the small current grounding system are also analyzed by the sequence component method, and, finally, the effectiveness of the phase-shifting and grounding transformer device is verified by simulation under PSCAD/EMTDC for fault routing and protection configuration of the urban distribution network in China.

23 June 2022 in Energies
Verified
Journal Article
Open access
PDF file
YYYongchun YANG
Yongchun YANG
YWyixuan wang
yixuan wang
YGYajing Gao
Yajing Gao
CGChangzheng Gao
Changzheng Gao
With the depletion of fossil energy and increasingly serious environmental problems, demand-side resources play an increasingly prominent role in peak shaving and valley filling, energy conservation, and emission reduction. Under the background of further promotion of the “double carbon” goal in China, considering the possible double uncertainty factors in the process of unit and demand response resources participating in the scheduling and the goal of minimum carbon emission, the uncertainty models of unit output and demand-side resource response are respectively constructed based on the sequential stochastic production simulation algorithm and the method of additional random variables. In the model, the influence of random forced outage on unit output and the uncertain influence of response deviation caused by the limitation of demand response resource information processing and response aging characteristics are considered, respectively. By analyzing the power supply and demand, considering demand response on two typical peak shaving days, the peak shaving cost, carbon emission reduction, and power limitation are obtained. An IEEE 30 bus 6-machine system example is used to verify the effectiveness of the dual uncertainty demand response model, which provides guidance for power dispatching decision-making.