Gang Lei

Prof. Dr. Gang Lei

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 January 2022 in Advances in Materials Science and Engineering
Verified
Journal Article
Open access
PDF file
PGPanpan Guo
Panpan Guo
GLGang Lei
Gang Lei
LLLina Luo
Lina Luo
XGXiaonan Gong
Xiaonan Gong
Yixian WangYixian Wang
Yixian Wang
HHHaibo Hu
Haibo Hu
This paper describes recent advances in the effect of soil creep on the time-dependent deformation of deep braced excavation. The effect of soil creep is generally investigated using the observational method and the plain-strain numerical simulation method. The observational method is more applicable for deep braced excavations in soft clays constructed using the top-down method. The plain-strain numerical simulation method can be conveniently used for parametric analysis, but it is unable to capture the spatial characteristics of soil creep effect on lateral wall deflections and ground movements. The additional lateral wall deflections and ground movements that are generated due to the soil creep effect can account for as large as 30% of the total displacements, which highlights the importance of considering the effect of soil creep in deep braced excavations through soft clays. The magnitude of the displacements due to soil creep depends on various factors, such as excavation depth, elapsed period, unsupported length, and strut stiffness. Parametric analyses have indicated several effective measures that can be taken in practice to mitigate the detrimental effect of soil creep on the deformation of deep braced excavation. Based on the literature review, potential directions of the related future research work are discussed. This paper should be beneficial for both researchers and engineers focusing on mitigating the adverse effect of soil creep on the stability of deep braced excavations.

17 March 2021 in Geofluids
Verified
Journal Article
Open access
PDF file
PGPanpan Guo
Panpan Guo
FLFeifei Liu
Feifei Liu
GLGang Lei
Gang Lei
XLXian Li
Xian Li
CZCheng-Wei Zhu
Cheng-Wei Zhu
XGXiaonan Gong
Xiaonan Gong
This paper proposes a new method for predicting the displacement and internal force of constructed tunnels induced by adjacent excavation with dewatering. In this method, the total excavation-induced additional stress on the constructed tunnel is derived by superposing the additional stresses induced by excavation unloading and dewatering effects. The additional stress induced by unloading effect is calculated using Mindlin’s solution. The additional stress induced by dewatering effect is calculated using the principle of effective stress and the Dupuit precipitation funnel curve. With the beam on elastic foundation method, the total additional stress is then used for calculating the tunnel displacement and internal force caused by adjacent excavation with dewatering. Based on three well-documented case histories, the performance of the proposed method is verified. Moreover, a parametric analysis is also performed to capture the effects of excavation depth, tunnel-to-excavation distance, initial water level, excavation plan view size, and specific yield on the responses of the constructed tunnels. The results indicate that the effect of excavation depth on the tunnel maximum vertical displacement, maximum bending moment, and maximum shear force is more significant at an excavation depth greater than the cover depth of the constructed tunnel. The tunnel maximum vertical displacement, maximum bending moment, and maximum shear force decrease nonlinearly with an increase in the tunnel-to-excavation distance and the initial water level. Among the investigated parameters, the excavation dimension in the tunnel longitudinal direction affects most the tunnel responses. The effect of specific yield on the tunnel displacement and internal force induced by adjacent excavation with dewatering becomes more obvious as increasing the initial water level and excavation depth.

1 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
GLGang Lei
Gang Lei
XGXiaonan Gong
Xiaonan Gong
Foundation pit envelope and foundation pit excavation solution design is a multidisciplinary problem that could be linked to a series of safety issues in the geotechnical engineering of an actual construction project. Moreover, the construction of large deep foundation pit in soft soil often faces greater risks and challenges as the support structure deforms more easily and unpredictably. In order to improve the deformation prediction of deep foundation pit engineering precision and efficiency and to ensure that the construction of deep foundation pit engineering is safe and efficient, in this article the traditional MSD (mobilizable strength design) theory research and analysis, combined with the Jinan formation characteristics of a tunnel in JInan, and new parameters were introduced to the original MSD method theory: the wall itself within the bending strain energy U and support compression elastic potential energy of V. A new law of conservation of energy is constructed, and finally, an optimized MSD method has been proposed, this method is shown in the article. Finally, the results of foundation pit deformation calculation were compared among the optimized MSD method, finite element calculation method, and field monitoring data analysis method, so as to demonstrate the reliability of the prediction system of optimized MSD method and finite element analysis method. The results show that, by optimizing the MSD calculation method, the horizontal displacement of the retaining wall varies depending on the excavation depth of the foundation pit and the form of internal support with the overall peak value of displacement between 0∼0.2% H (H being the excavation depth); the deformation of retaining wall increases gradually with the increase of excavation depth of the foundation pit, and the peak position of deformation gradually moves down with the excavation of foundation pit. The trend of these changes is consistent with the results of the finite element method and field data analysis method, proving that the optimized MSD method is reliable in predicting the deformation of the foundation pit under specific stratum conditions.

19 June 2021 in Geofluids
Verified
Journal Article
Open access
PDF file
GLGang Lei
Gang Lei
PGPanpan Guo
Panpan Guo
FHFucai Hua
Fucai Hua
XGXiaonan Gong
Xiaonan Gong
LLLina Luo
Lina Luo
This paper investigates the performance of a top-down deep excavation in soil-rock composite stratum. The behavior of the excavation bracing system, consisting of ground anchors and end-suspended piles, has not been well understood due to the lack of relevant research. Based on the observed data of a typical deep excavation case history for the May Fourth Square Station in Tsingtao, China, the characteristics of the horizontal and vertical pile displacements, ground surface settlements, building settlements, axial forces in ground anchors, earth pressure, and pore water pressure during excavation were analysed. Two-dimensional finite element simulations were carried out to further explore the deformation and internal force responses of end-suspended piles and to capture the effects of pile diameter, embedded depth, and rock-socketed depth on the horizontal displacement and bending moment distributions along the pile shaft. It was found that the pattern of the vertical pile displacements could be categorized into three types: rapid settlement, slow settlement, and rapid heave. The magnitudes of the ground and building responses can be well controlled within allowable limits by combining the top-down method with the adopted bracing system. Among the investigated parameters, pile diameter is dominant in affecting the horizontal pile displacement. The primary influence zone for pile bending moment varies, depending on the parameters. It is recommended that a combination of top-down method, ground anchors, and end-suspended piles be adopted for restraining excavation deformation and lowering construction costs of similar deep excavations in soil-rock composite stratum.

20 July 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
GLGang Lei
Gang Lei
GWGuanqing Wang
Guanqing Wang
DWDengke Wang
Dengke Wang
FHFucai Hua
Fucai Hua
XGXiaonan Gong
Xiaonan Gong
In view of the actual gap between the theoretical solution and the measured value of the range of the surrounding rock loose zone excavated by blasting, the formation process and influencing factors of the surrounding rock loose zone after blasting are analyzed by combining theoretical analysis, numerical simulation, and field tests. It is proposed that the formation of the surrounding rock loose zone can be divided into two parts: the stress loose zone formed by in situ stress release after chamber excavation and the blasting–expansion loose zone formed by blasting, corresponding to the stress loose zone crack propagation. In this paper, the stress method and work–energy relationship method based on the Fenner solution were used to study the range of the surrounding rock loose zone formed after chamber excavation. A theoretical formula for determining the range of the surrounding rock loose zone is presented. These methods can clearly explain the formation mechanism of the loose zone, and the parameter selection method is simple and fast, which can be used for the theoretical prediction of the loose zone of surrounding rock in tunnel engineering in rock areas. Finally, the two methods were used to calculate the range of surrounding rock loose zone under three different working conditions in the Qingdao Metro single-track section, and the results were compared with the field monitoring results to verify the applicability of the proposed methods.

5 September 2022 in Materials
Verified
Journal Article
Open access
PDF file
HHHaibo Hu
Haibo Hu
LLLina Luo
Lina Luo
GLGang Lei
Gang Lei
JGJin Guo
Jin Guo
SHShaoheng He
Shaoheng He
XGXiaonan Gong
Xiaonan Gong
Reviewing literature revealed that the studies on the bearing characteristics of pile foundations mainly focuses on clay, ordinary sand, loess, saline soil, and other areas. However, few studies on the bearing characteristics of the pile foundation in calcareous sand were conducted. Besides, existing traditional studies ignored the variation of soil compression modulus with depth, and the effect of void ratio on the transverse bearing characteristics of the pile foundation in a calcareous sand area were not well understood. In response of these problems, this study conducted a theoretical investigation on the transverse bearing characteristics of the pile foundation in a calcareous sand area. The transverse bearing characteristics of the pile foundation were derived based on the Pasternak foundation model and the Winkler foundation model, incorporating the heterogeneous distribution of compressive modulus with buried depth. The calculation results of the Pasternak foundation model are closer to the observed results than the Winkler foundation model. Therefore, the following research on the transverse bearing characteristics of the pile foundation in the calcareous sand area adopts the Pasternak foundation model. Then, the effects of the pile length, pile diameter, pile elastic modulus, horizontal load, bending moment, and void ratio on the transverse bearing characteristics of the pile foundation in a calcareous sand area were thoroughly analyzed. Furthermore, the difference between the transverse bearing characteristics of the pile foundation in a calcareous sand area and a quartz sand area was discussed. Results show that the horizontal displacement of the pile top in a calcareous sand area is greater than the quartz sand area under the same conditions.