Da Liu

Dr. Da Liu

orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 November 2022 in International Journal of Rock Mechanics and Mining Sciences
Verified
Journal Article
Closed access
DLDa Liu
Da Liu
WLWenbo Lu
Wenbo Lu
JYJianhua Yang
Jianhua Yang
JGJianglin Gao
Jianglin Gao
PYPeng Yan
Peng Yan
CYChi Yao
Chi Yao

15 September 2022 in Polymers
Verified
Journal Article
Open access
PDF file
ZLZhidong Liu
Zhidong Liu
XZXiaohua Zhao
Xiaohua Zhao
DLDa Liu
Da Liu
Gaohui WangGaohui Wang
Gaohui Wang
MSMingsheng Shi
Mingsheng Shi
The defense effects of sacrificial cladding have been extensively studied in the field of blast resistance. As a polymer material with a cellular structure, polyurethane also has the potential to act as sacrificial cladding due to its good mechanical properties. The purpose of this study is to compare and select a numerical simulation method that is suitable for exploring the blast damage mitigation effect of polyurethane sacrificial cladding on reinforced concrete slabs. To this end, three numerical models were developed using the Fully Coupled Eulerian–Lagrangian (CEL) method, the Arbitrary Lagrangian–Eulerian (ALE) coupling method, and the Smoothed Particle Hydrodynamics and Finite Element Method (SPH–FEM) coupling method, respectively. These three numerical models were used to investigate the damage features of reinforced concrete slabs with polyurethane sacrificial cladding (PU–RCS) under contact explosions. A field test was also carried out to provide a comparison for numerical simulation results. Moreover, the advantages and disadvantages of the three simulation results and the applicability of the three coupled models were discussed. The results show that compared with the CEL model and the ALE coupling model, the SPH–FEM coupling model can better simulate the damage features of PU–RCS, such as the cracks on the bottom surface of the RC slab and the large deformation failure state of polyurethane sacrificial cladding, while the CEL model and the ALE coupling model can simulate the propagation process of shock waves and have a lower computational cost. In conclusion, the SPH–FEM coupling method is the most applicable method for exploring the blast damage features of PU–RCS in this study.

9 November 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
WJWei Ju
Wei Ju
JYJianhua Yang
Jianhua Yang
CYChi Yao
Chi Yao
XZXiaobo Zhang
Xiaobo Zhang
ZYZhiwei Ye
Zhiwei Ye
DLDa Liu
Da Liu
In order to solve the problem of vegetation restoration in the traditional heap leaching of rare earths, a novel heap leaching technology is proposed. In the novel technology, leaching liquid is laterally injected into the rare earth pile from the side end so that vegetation restoration can be carried out quickly on the top of the pile. In this study, a laboratory test was performed to investigate the permeability of the ion-adsorbed rare earth pile under lateral liquid injection conditions. Four rare earth samples with varied combinations of the mineral particles at different sizes were adopted in the test to emphatically discuss the influence of the particle composition on permeability. The experimental results show that the permeability of the rare earth pile under the lateral liquid injection conditions is governed by the migration of fine particles. As the hydraulic head of the leaching liquid increases, the fine particles undergo a motion process of stabilization, migration initiation, deposition, and remigration. Accordingly, the permeability coefficient of the rare earth pile exhibits a variation of stabilization, a gradual increase, a re-stabilization, and a re-increase. The fine particle migration and exudation causes the permeability of the rare earth pile to be non-uniform in space. The permeability coefficients near the liquid injection end and the liquid outlet end are much greater than those are at the middle positions of the pile. The particle composition of the rare earth has an important effect on the permeability of the pile. In the rare earth with a combination of coarse and fine particles, preferential flow paths are easy to develop as in this soil, the fine particles easily migrate and they cannot block the pore channels. By contrast, the fine particles find it difficult to migrate, and the permeability coefficient is relatively stable in the fine-medium particle rare earth. This particle composition is conducive to the heap leaching of the rare earth under lateral liquid injection conditions.

20 August 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
DLDa Liu
Da Liu
WXWeijiang Xie
Weijiang Xie
JGJianglin Gao
Jianglin Gao
SHSongtao Hu
Songtao Hu
MCMing Chen
Ming Chen
LLLinhua Li
Linhua Li
High-pressure jet grouting is widely used in the construction of cut-off wall in hydraulic engineering. Compared to the high-pressure jet grouting used for foundation improvement, the high-pressure jet grouting cut-off wall of hydraulic engineering has lower requirements for the advance consolidation and provision of bearing capacity, and more focus on providing an anti-seepage effect and ensuring the continuous integrity of the wall. In the past, the research on high-pressure jet grouting focused more on the application to foundation treatments, and the research on the construction efficiency of cut-off wall is relatively insufficient. Therefore, in this study, a self-developed ipsilateral multi-nozzle jet grouting machine with a large drill diameter and construction method are proposed according to the construction characteristics of the embankment cut-off wall in hydraulic engineering. Based on the dyke protection projects, Jinggangshan navigation hydropower and Xingan navigation hydropower, the large-diameter, multi-nozzle, high-pressure jet cut-off wall test is carried out, and the wall forming effect of the cut-off wall is verified through the combination of indoor and outdoor tests. The results show that the proposed construction method can adapt to the formation conditions in which it is difficult to implement conventional high-pressure jet grouting, and obtains good construction efficiency. A favorable wall quality can be obtained by using more efficient large-diameter and ipsilateral multi-nozzle jet grouting in the construction of high-pressure jet cut-off wall.

1 January 2022 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
DLDa Liu
Da Liu
JGJianglin Gao
Jianglin Gao
FCFang Chen
Fang Chen
SHSongtao Hu
Songtao Hu
XZXiaohua Zhao
Xiaohua Zhao
YLYan Li
Yan Li
The channel slope in the red‐bed soft rock area is prone to instability and collapse due to the influence of the channel flow movement, rainfall, weathering, and other factors. Under long‐term operation conditions, the sediment stripped from the channel side wall is liable to silt along the process of water flow transportation in the channel, which seriously leads to elevation of the channel bottom, increase of channel width, and reduction of the horseway, which affect the normal water conveyance and operation safety of channels. In view of the collapse and instability of Zhetang diversion irrigation channel project in Xinjiang hydraulic project, through on‐site sampling and indoor rock mechanics test, the strength mechanical parameters of slope rock samples are obtained, and the indoor rheological test is carried out, and the triaxial rheological law is obtained. Under different levels of stress, the axial creep strain accounts for more than 50% of the total axial strain, indicating that the rheological effect of sample rock is obvious. Based on the strength parameters of rock samples, a numerical model is established. The stability of red‐bed soft rock channel bank slope is studied by using the strength reduction method of finite element method. The seepage field of channel slope under conventional working conditions is analyzed, and the slope stability under different operating conditions is compared and calculated. The results show that the slope stability safety factor of Zhetang diversion irrigation channel slope is 1.60 under conventional working conditions and 1.33 under check working conditions, which are greater than the recommended value in the specification.

30 December 2022 in Water
Verified
Journal Article
Open access
PDF file
DLDa Liu
Da Liu
TLTaiqing Lin
Taiqing Lin
JGJianglin Gao
Jianglin Gao
Binghan XueBinghan Xue
Binghan Xue
JYJianhua Yang
Jianhua Yang
WSWenbin Sun
Wenbin Sun
The construction of a cut-off wall is a common reinforcement method for earth rock dams. At present, compared with the in-depth study on homogeneous earth dams, more and more attention is being paid to the stability and deformation of earth dams strengthened by a concrete cut-off wall. In this study, aiming at the Wujing project of the earth dam strengthened by cut-off wall, the influence of the water level rise and fall on the stability of the dam slope, the deformation of the dam body, and the crack width on dam crest were analyzed by numerical calculation and in situ measurement. The analysis results show that when the reservoir encounters a sudden drawdown, the safety factor of the dam slope decreases sharply. The faster the sudden drawdown, the faster the safety factor decreases. When the reservoir water level rises, the dam’s horizontal displacement shifts to the upstream direction, and the change of horizontal displacement of the downstream slope is significantly larger than that at the measuring point of the upstream slope. The water level of the reservoir rises, and the surface of the dam body rises, and the fluctuation of settlement deformation shows that the upstream side is larger than the downstream side, especially during the period of abrupt change in the reservoir water level. The longitudinal cracks on the dam crest show a tendency of shrinkage when the reservoir water level rises, and opening decreases with the decrease of deformation gradient increment and increases with the increase of gradient increment.