A high intensity four-vane continue wave (cw) RFQ for the Beijing Isotope Separation On-Line (BISOL) high intensity deuteron driver linac has been designed. This RFQ will accelerate the 25 mA cw deuteron beam the 3.0 MeV with an operating frequency of 162.5 MHz. Three beam dynamics design schemes based on different strategies have been proposed and detailed comparisons, including tolerance study and error analysis, are performed to evaluate them. The final design of RFQ can achieve the requirements with a length of 5.29 m and the transmission of 99.1%. The inter-vane voltage is ramped from 60 kV to 75 kV and the maximum Kilpatrick factor is 1.42, which is very modest and beneficial to cw operation mode. The RFQ electromagnetic design is carried out based on the full-length 3D model, including vane modulation, undercuts, π-mode stabilization rods (PSLs) and tuners. The requirements of correct work frequency and voltage ramp are fulfilled by varying vane width and adjusting undercuts. In addition, the π-mode stabilization rods (PSLs) are inserted and optimized to increase mode separation and enhance voltage stabilization. The rf power loss and effective shunt impendence are 118 kW and 210 kΩ⋅m, respectively. In addition, multi-physics analysis of the cavity, based on the electromagnetic codes CST MWS, HFSS and ANSYS, has been carried out to check the cooling system, the temperature rise and deformation of the cavity, as well as the frequency shift in the cw operation. Finally, the frequency sensitivities to cooling water temperature are studied to obtain water temperature tuning coefficients, which will be used for fine tuning of the RFQ cavity during operation.
3 May 2012 in Physical Review Special Topics - Accelerators and Beams
The surface topography of samples after irradiation with heavy ions, protons, and helium ions based on accelerators is an important issue in the study of materials irradiation. We have coupled the separated function radio frequency quadrupole (SFRFQ) electrodes and the traditional RFQ electrodes into a single cavity that can provide a 0.8 MeV helium beam for our materials irradiation project. The higher accelerating efficiency has been verified by the successful commissioning of the prototype SFRFQ cavity. An energy modulated electron cyclotron resonance (ECR) ion source can achieve a well-bunched beam by loading a sine wave voltage onto the extracted electrodes. Bunching is achieved without the need for an external bunch cavity, which can substantially reduce the cost of the system and the length of the beam line. The coupled RFQ-SFRFQ with an energy modulated ECR ion source will lead to a more compact accelerator system. The conceptual design of this novel structure is presented in this paper.
RFQ-based neutron sources for various applications are being developed and constructed worldwide. To simplify RFQ structure and increase the effective shunt impedance, some novel design strategies have been investigated, including trapezoidal electrode modulations, the double dipole (DD) RFQ structure and use of an internal buncher dynamics strategy. Trapezoidal modulations based on 2TERM profiles are proposed to compensate for the variation of inter-vane capacitance, which helps to simplify rf electromagnetic design and field tuning. The double dipole (DD) four-vane structure increases mode separation without adding other equipment by modifying the RFQ undercut scheme. Furthermore, the entrance gap electric field between endplate and electrodes is designed as a longitudinal buncher, which makes the RFQ bunching section much shorter. By applying these considerations, a novel RFQ has been designed. It operates at 162.5 MHz with a duty factor of 1%, and can accelerate the 10 mA deuteron beam to 1.5 MeV. We have reduced the length of electrodes from 2.2 m to 1.8 m while maintaining transmission efficiency above 98.5%. The rf electromagnetic design has been carried out to fulfill the requirements of the resonant frequency, flat longitudinal field distribution and field tuning.
In order to figure out the migration and deposition of impurities on the first wall of HL-2A/2M tokamak, Peking University and Southwestern Institute of Physics are co-developing a deuteron RFQ as part of the in situ ion-beam diagnostic for the material. The RFQ, which operates at 162.5 MHz, is designed to accelerate a 10-mA deuteron beam from 40 keV up to 1.5 MeV. Key design considerations and the final design parameters are presented. The RFQ has been conditioned at a 1% duty factor for 80 h at RF cavity power of 55 kW. The specific shunt impedance of the cavity is 221 kΩ·m by measuring the bremsstrahlung spectrum. The intrinsic Q-value after the high-power tests measured by the Ring-Down method is 13,780. Beam commissioning has been taken place during the first half of 2021, and the beam measurements include beam current and energy of 2H+ ion. A 10 mA 2H+ beam was successfully accelerated through the RFQ.
Based on the latest design requirements proposed by the Beijing On-Line Isotope Separation (BISOL) project, a new -based, 81.25 MHz CW radio frequency quadrupole (RFQ) with external bunching has been designed. This RFQ can accelerate to 0.5 MeV/u with an output longitudinal-normalized rms emittance of 0.20 keV/u·ns over a length of 5.6 m. The tolerance and error analysis results indicate that this RFQ can handle a wide range of non-ideal beams while maintaining relatively lower longitudinal emittance growth and higher transmission efficiency. To maintain the beam intensity, the RFQ will simultaneously accelerate three kinds of high-charge-state mixed ions (, and ), the simulation results given by Impact-T show that the RFQ can achieve high transmission of the mixed beam. Compared with the previous -based internal bunching RFQ scheme, this RFQ has a shorter length and smaller output emittance, which is beneficial to the designs of subsequent Medium-energy Beam Transport (MEBT) and Drift Tube Linac (DTL). In electromagnetic design, a four-vane structure with 48 tuners and 16 -mode stabilizers (PSLs) were chosen. The results of the multi-physics analysis show that the maximum temperature rise and the maximum deformation of the cavity are 13.6 K and 40.3 µm, respectively. The results simulated with CST Microwave Studio (CST) and HFSS software were consistent.
About Me
Professor Zhi Wang works at the State Key Laboratory of Nuclear Physics and Technology, Peking University.
Professor Zhi Wang works at the State Key Laboratory of Nuclear Physics and Technology, Peking University.