Brian Jenkins

Mr. Brian Jenkins


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 November 2022 in Energies
Verified
Journal Article
Open access
PDF file
DRDavid Rowell
David Rowell
BJBrian Jenkins
Brian Jenkins
JCJames Carroll
James Carroll
DMDavid McMillan
David McMillan
Offshore wind is poised for huge growth in the coming years, the UK government has set targets of 40 GW of offshore wind, including 1 GW of floating wind, to be installed in the UK by 2030. Many proposed wind development sites are in deeper waters, farther from shore and will therefore need to be developed as floating wind sites. Developing sites in deeper waters provides access to higher, more consistent wind speeds, however this also means increased wave heights and tougher operating conditions. This makes the challenge of site accessibility critical to the goal of lowering the costs of offshore wind. Accessibility is the amount of time that vessels can safely access a given site. The objective of this study was to make a comparison of the accessibility of potential future floating wind sites to existing fixed bottom wind farm sites. Accessibility was calculated by developing Matlab code using established techniques and definitions found in the literature. A case study was then completed using sites in Scottish waters proposed for development as part of the Scotwind leasing plan. The majority of the Scotwind sites will need to be developed as floating wind sites due to the large water depths. This study assesses the accessibility of the Scotwind leasing sites and compares them to a typical fixed bottom site. The study found that accessibility will be a greater challenge for floating farm wind sites compared to fixed bottom sites. Increased access to vessels that can operate in larger wave heights will likely be necessary to operate and maintain floating wind farm sites.

10 August 2022 in Energies
Verified
Journal Article
Open access
PDF file
BJBrian Jenkins
Brian Jenkins
DSDavid Squires
David Squires
JBJohn Barton
John Barton
DSDani Strickland
Dani Strickland
UWUpul Wijayantha
Upul Wijayantha
MTMurray Thomson
Murray Thomson
A battolyser is a combined battery electrolyser in one unit. It is based on flow battery technology and can be adapted to produce hydrogen at a lower efficiency than an electrolyser but without the need for rare and expensive materials. This paper presents a method of determining if a battolyser connected to a wind farm makes economic sense based on stochastic modelling. A range of cost data and operational scenarios are used to establish the impact on the NPV and LCOE of adding a battolyser to a wind farm. The results are compared to adding a battery or an electrolyser to a wind farm. Indications are that it makes economic sense to add a battolyser or battery to a wind farm to use any curtailed wind with calculated LCOE at £56/MWh to £58/MWh and positive NPV over a range of cost scenarios. However, electrolysers, are still too expensive to make economic sense.