Mohd Haniff Osman

Mr. Mohd Haniff Osman

orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2016 in Procedia Engineering
Verified
Journal Article
Open access
SDSerdar Dindar
Serdar Dindar
Sakdirat KaewunruenSakdirat Kaewunruen
Sakdirat Kaewunruen
Min AnMin An
Min An
MOMohd Haniff Osman
Mohd Haniff Osman
As an essential feature to enable rail operational flexibility, railway turnouts are special track systems used to divert a train from a particular direction or a particular track onto other directions or other tracks. Railway turnout is constructed on a complex geometry and grade, which makes it one of the most critical railway infrastructures. These characteristics pose various risks in rail operations. A considerable number of derailment incidents have occurred every year. Not only do these incidents yield operational downtime and financial losses, but they also give rise to the casualties and sometimes the loss of lives across the world. One of fundamental reasons is that railway industry barely pays attention to risk elements on railway turnouts. This paper thus presents how turnout components work as a system, the diversity of emerging risks considering natural hazards and global warming potential to the system. Additionally, in order to perform a well-designed quantitative-based risk analysis method for appropriate risk management of railway turnouts and crossings, focusing on aging, degradation and signalling faults on the systems, the research develops a number of new ideas

1 September 2019 in ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
Verified
Journal Article
Closed access
Sakdirat KaewunruenSakdirat Kaewunruen
Sakdirat Kaewunruen
MOMohd Haniff Osman
Mohd Haniff Osman
WEWong Hao Cheng Eric
Wong Hao Cheng Eric
Failures in rail fasteners can lead to misalignments of the rails and even cause a train derailment. Current inspection and maintenance regimes for rail fasteners, however, do not adequately address the credible failure modes found in the field. In response to these improvement opportunities, a risk-based maintenance philosophy, driven by a risk management framework, is proposed for rail fasteners. The framework was primarily developed from international standards alongside high-level industry guidelines. Reliability tools were then incorporated, allowing practitioners to arrive at an appropriate combination of reliability tools based on the circumstances under which the assessment is to be conducted. Monte Carlo simulations were undertaken on the embedded anchors of rail fasteners to demonstrate how the resultant framework can be innovatively adopted in practice. The general findings highlight that accurate risk depiction is vital for track components (e.g., embedded anchors, the failure modes of which are dependent on time); thereby, the time frames in which risk for the component transits to different risk categories should be obtained. Note that the finding is unique to the example; thus, the proposed risk framework should be treated carefully before it is applied to other failure modes.

20 July 2017 in Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit
Verified
Journal Article
Closed access
MOMohd Haniff Osman
Mohd Haniff Osman
Sakdirat KaewunruenSakdirat Kaewunruen
Sakdirat Kaewunruen
AJAnson Jack
Anson Jack
Inspection of railway tracks involves a high volume of short-duration tasks (e.g. visual inspection, vehicle-based inspection, measurement, etc.) each of which is repeated at different frequencies and time intervals. It is important to gain as many benefits as possible from the inspection tasks, which incur huge expenses. To date, various optimisation methods have been incorporated into the schedule generation to determine an inspection order for a known number and geographical location of tracks. Due to the specific requirements of certain tracks or inspection problem—for example, the number of schedule parameters and one-off or incremental type schedules—researchers have developed more sophisticated and problem-dependent optimisation methods. However, introduction of a new inspection technology and policy in the last five years, especially in the United Kingdom, has urged a remodelling of the scheduling problem in track inspection in order to cope up with the new operational and business constraints. Thus, this paper conducts a review and gap analysis of previous studies with regard to track inspection scheduling problems from an optimisation point of view. In addition, the authors discuss several potential research interests resulting from the gap analysis undertaken. This study shows that heuristic methods are popular among researchers in searching for an optimal schedule subject to single or multiple optimisation function(s) while satisfying various technical and business constraints.

9 January 2019 in Frontiers in Built Environment
Verified
Journal Article
Open access
PDF file
Sakdirat KaewunruenSakdirat Kaewunruen
Sakdirat Kaewunruen
MOMohd Haniff Osman
Mohd Haniff Osman
PRPanrawee Rungskunroch
Panrawee Rungskunroch
Operations of railway business have always placed “safety” as the first priority. Managing “public safety” requires integral risk monitoring and management. The risk monitoring for rail infrastructure management relies on accurate health monitoring and integrated track inspection. Health monitoring of all rail assets have given rise to “Big Data,” which have been derived and recorded from on-board monitoring and on-track inspections of both fixed and mobile assets. In this paper, the safety-critical inspections of fixed assets or railway infrastructures have be emphasized in order to obtain the integral insights into track defects, irregularities and deterioration of track geometry and components. This paper highlights the systems-based integration framework of on-board and on-site inspection data for railway track integrity assurance under uncertain settings. The risks and consequences of extreme climates have been considered in order to improve adaptiveness, agility, and readiness of the systems-based framework of the total track inspection activities that could underpin and assure track infrastructure integrity and resilience. New challenges in observational field data have been highlighted as the evidences for the necessity for the adaptive systems-based framework of the total track inspection.

1 October 2017 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
PDF file
SDSerdar Dindar
Serdar Dindar
Sakdirat KaewunruenSakdirat Kaewunruen
Sakdirat Kaewunruen
MOMohd Haniff Osman
Mohd Haniff Osman
One of the emerging significant advances in engineering, satellite imaging (SI) is becoming very common in any kind of civil engineering projects e.g., bridge, canal, dam, earthworks, power plant, water works etc., to provide an accurate, economical and expeditious means of acquiring a rapid assessment. Satellite imaging services in general utilise combinations of high quality satellite imagery, image processing and interpretation to obtain specific required information, e.g. surface movement analysis. To extract, manipulate and provide such a precise knowledge, several systems, including geographic information systems (GIS) and global positioning system (GPS), are generally used for orthorectification. Although such systems are useful for mitigating risk from projects, their productiveness is arguable and operational risk after application is open to discussion. As the applicability of any novel application to the railway industry is often measured in terms of whether or not it has gained in-depth knowledge and to what degree, as a result of errors during its operation, this novel application generates risk in ongoing projects. This study reviews what can be achievable for risk management of railway turnouts thorough satellite imaging. The methodology is established on the basis of other published articles in this area and the results of applications to understand how applicable such imagining process is on railway turnouts, and how sub-systems in turnouts can be effectively traced/operated with less risk than at present. As a result of this review study, it is aimed that the railway sector better understands risk mitigation in particular applications.

13 October 2016
Verified
Conference Paper
Closed access
MOMohd Haniff Osman
Mohd Haniff Osman
Sakdirat KaewunruenSakdirat Kaewunruen
Sakdirat Kaewunruen
Min AnMin An
Min An
SDSerdar Dindar
Serdar Dindar
Disruptions can occur during the execution of any schedule or plan. Both minor and major disruptions must be handled properly, because they have the potential to cause deviation from the original schedule's main goals. In rail track inspection schedules, ultrasonic machine breakdown, unavailability of tracks due to extreme weathers and special inspection requests are some of potential disruption factors. Surprisingly, it is difficult to obtain a single publication that has discussed in details about disruption management in track inspection schedule operation, while an opposite trend is seen for railway operations, i.e., crew and rolling stock schedules. This unbalanced situation presents a challenge, because track inspection schedules are also implemented in a real-time setting. Since proper inspection activities are essential to ensure the continuity and safety of train operations, this paper aims to first identify the potential sources of disruption to predetermined track inspection schedules. The findings are then used to formulate an appropriate strategy for dealing with disruption and a method for developing a practical rescheduling operator.