High speed rail (HSR) networks have been an essential catalyst in stimulating and balancing regional economic growth that ultimately benefits the society as a whole. Previous studies have revealed that HSR services sustainably yield superior social values for people, especially for adults and those of working age. This has become an advantage of HSR networks over other forms of public transportation. The Shinkansen network in Japan is one of most successful HSR models. Its services bring significant social advantages to the communities it serves, such as shorter travel times and increased job opportunities. Nevertheless, the societal impact of HSR networks depends on many factors, and the benefits of HSR could also be overrated. The goal of this research is to measure the socioeconomic impacts of HSR on people of all genders and age groups. The outcomes could lead to more suitable development of HSR projects and policies. This study investigates data sets for Japanese social factors over 55 years in order to determine the impacts of HSR. The assessment model has been established using Python. It applies Pearson’s correlation (PCC) technique as its main methodology. This study broadly assesses social impacts on population dynamics, education, age dependency, job opportunities, and mortality rate using an unparalleled dataset spanning 55 years of social factors. The results exhibit that younger generations have the most benefits in terms of equal educational accessibility. However, the growth of the HSR network does not influence an increase in the employment rate or labour force numbers, resulting in little benefit to the workforce.
20 July 2017 in Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit
Inspection of railway tracks involves a high volume of short-duration tasks (e.g. visual inspection, vehicle-based inspection, measurement, etc.) each of which is repeated at different frequencies and time intervals. It is important to gain as many benefits as possible from the inspection tasks, which incur huge expenses. To date, various optimisation methods have been incorporated into the schedule generation to determine an inspection order for a known number and geographical location of tracks. Due to the specific requirements of certain tracks or inspection problem—for example, the number of schedule parameters and one-off or incremental type schedules—researchers have developed more sophisticated and problem-dependent optimisation methods. However, introduction of a new inspection technology and policy in the last five years, especially in the United Kingdom, has urged a remodelling of the scheduling problem in track inspection in order to cope up with the new operational and business constraints. Thus, this paper conducts a review and gap analysis of previous studies with regard to track inspection scheduling problems from an optimisation point of view. In addition, the authors discuss several potential research interests resulting from the gap analysis undertaken. This study shows that heuristic methods are popular among researchers in searching for an optimal schedule subject to single or multiple optimisation function(s) while satisfying various technical and business constraints.
Platform screen doors (PSD) are the sliding barrier doors installed at the edges of station platforms in many modern metro stations and occasionally on heavy rail systems. They serve many functions among which are the suicide prevention, optimisation of station energy consumption and safety, particularly by shielding passengers from gaining access to the rail tracks. PSD can prolong dwell time, increase the danger of mantrap and can extend emergency evacuation periods, among others. These pave way for the existence of PSD to have both positive and negative effects on the railway system. This research identified the benefits that could be derived from installing PSD at train stations and the drawbacks associated with its presence, with a view of evaluating the overall effects that the PSD has on the railway system. Upon identification of both factors, a causal loop diagram (CLD) has been developed to enable a pictorial demonstration of the various PSD effects, their systematic interrelations, the polarity of effects, and how they combine to affect the entire railway system. The conclusion reached in the present study was that PSD as a system can have significant impact on many aspects of the railway such as delays, capacity, safety, platform climate control, energy consumption, air quality and so on. But there are no studies that attempt to combine them all into an overall evaluation.
Track inspection is purposely performed to recover tracks from defects and damage and eliminate potential safety hazards. It is scheduled through an exhaustive process that usually integrates many disciplines such as optimization, statistics, risk management, etc. Spending so much of a monetary and an emotional investment in an original schedule (referred to as master schedule hereafter) that the scheduler wants to deliver might be a good excuse not to develop a solid ‘Plan B’. Plan B here refers to scheduler responses or a contingency plan when the master schedule does not go as expected. It is found that there is often low to moderate probability of a crisis occurring when a schedule is executed in a real environment. Nevertheless, its impact can leave transportation services to the mercy of the disruption as shown by the Christmas 2014 incident where a huge volume of passengers using King's Cross and Paddington services experienced both inconvenience and discomfort due to engineering delays and train disruption. Thus, this paper aims to discuss the potential of considering ‘Plan B’ or contingency plan if incidents arise that were not expected during track inspection schedule execution. Benefits, general guidelines and relevant strategies for creating a contingency plan are also discussed. We highlight the rationale to support the claim that an original schedule of track inspection jobs should be adapted to respond to a new context e.g. inspection vehicle machine breakdown, new inspection requests, man-made hazards, terrorist attack, extreme weather, climate change, etc. It is however proposed to develop an appropriate set of performance measure that is used to guide rescheduling in track inspection due to financial, equipment inventory, manpower, safety regulations, time and spatial constraints.
Models have the ability to represent a specific viewpoint of situations or circumstances in the real world. This paper facilitates the understanding of the relationship between railway safety and operational performance by providing an overview of performance models and presenting a model framework that incorporates both elements of safety and operational performance in the rail industry. This framework, if further developed into a working model with complex equations will facilitate decision making by governments and stakeholders in the daily operations and investments of railways.