Peter Cheimets

Dr. Peter Cheimets


Research Focus & Metrics

Academic Career Length

29Years (1998-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 1998 in Publications of the Astronomical Society of the Pacific
Verified
Journal Article
Closed access
PDF file
DFDaniel Fabricant
Daniel Fabricant
PCPeter Cheimets
Peter Cheimets
NCNelson Caldwell
Nelson Caldwell
JGJohn Geary
John Geary

1 January 2025 in Journal of Astronomical Telescopes, Instruments, and Systems
Verified
Journal Article
Closed access
PDF file
PCPeter Cheimets
Peter Cheimets
CDCasey T. DeRoo
Casey T. DeRoo
BFBrian T. Fleming
Brian T. Fleming
KFKevin France
Kevin France
EHEdward Neil Hertz
Edward Neil Hertz
Arcus Probe, an X-ray and UV spectroscopy mission proposed for the 2023 NASA Astrophysics Probe call, uses two co-aligned spectrometers—the X-ray spectrometer (XRS) and the UV spectrograph (UVS). We discuss the process of aligning the XRS and UVS such that they acquire simultaneous spectra of astrophysical sources during the observatory’s operation. The definition of each instrument’s field of view and line of sight is given, informing the alignment strategy of the XRS to the UVS. Comprehensive error budgets, beginning with the internal alignment of the XRS optics and proceeding through on-orbit commissioning, are detailed. The mechanism for achieving such alignment on orbit exceeds the required alignment tolerances by ≥14x in all six degrees of freedom, lending confidence that the alignment required for successful science operations can be achieved.