We have known for decades that IT projects often fail. The usual explanation is that the cause is poor project management, poor cost estimation, poor requirements, etc. But how can we prevent these causes? To answer this question, it is not sufficient to know that there was poor project management, etc. Would it suffice to educate better project managers? And what would we have to teach them that they don’t learn today? We have to know what actually took place in the projects, identify the root causes, and find ways to prevent them (cures). This is similar to accident investigations in aviation. This paper reports the results of five accident investigations of large government IT projects in Denmark. We identified 37 root causes and 22 potential cures. Surprisingly, only one of the causes is programming-related. Each project suffered from around 15 causes. Twenty-seven of the causes are not reported in the research literature on IT project failures (e.g. surprises with system integration and wrong estimate of human performance). Half of the cures are familiar to developers, but were ignored in the specific project (example: usability test). The rest are unfamiliar (e.g. problem-oriented requirements and monitoring remaining work).
A health record database contains structured data fields that identify the patient, such as patient ID, patient name, e-mail and phone number. These data are fairly easy to de-identify, that is, replace with other identifiers. However, these data also occur in fields with doctors’ free-text notes written in an abbreviated style that cannot be analyzed grammatically. If we replace a word that looks like a name, but isn’t, we degrade readability and medical correctness. If we fail to replace it when we should, we degrade confidentiality. We de-identified an existing Danish electronic health record database, ending up with 323,122 patient health records. We had to invent many methods for de-identifying potential identifiers in the free-text notes. The de-identified health records should be used with caution for statistical purposes because we removed health records that were so special that they couldn’t be de-identified. Furthermore, we distorted geography by replacing zip codes with random zip codes.
(1) Background: User stories are widely used in Agile development as requirements. However, few studies have assessed the quality of user stories in practice. (2) Methods: What is the quality of user stories in practice? To answer the research question, we conducted a case study. We used an analysis report from a real-life project where an organization wanted to improve its existing hotline system or acquire a new one. We invited IT practitioners to write requirements for the new system based on the analysis report, user stories, and whatever else they considered necessary. The practitioners could ask the authors questions as they would ask a customer in a real setting. We evaluated the practitioners’ replies using these IEEE 830 quality criteria: completeness, correctness, verifiability, and traceability. (3) Results: The replies covered only 33% of the needs and wishes in the analysis report. Further, the replies largely missed other requirements needed in most projects, such as learnability and maintainability. Incorrect or restrictive solutions were often proposed by the practitioners. Most replies included user stories that were hard to verify, or would have caused a cumbersome user interface if implemented independently. (4) Conclusion: In this project, relying on the user stories would have been a disaster. Although the user stories could have been improved, they wouldn’t cover the necessary requirements in the project.