The Provincial Government of Bali is collaborating with the Ministry of Energy and Mineral Resources for the developing a 158 kWp rooftop solar power plant that connected to the grid of PLN. The energy produced so far has reduced the supply of electricity from PLN in the Bali Governor's Office area. The purpose of research studies is know the potential energy produced by solar power plant 158 kWp. Energy production is estimated using HelioScope simulation. Data needed includes location of the solar power plant, and solar power plant technical specifications. The simulation produces total energy data in a year of 249,764 kWh/year with the highest energy occurring in May of 24,172 kWh and the lowest energy occurring in January of 16,226 kWh.
1 January 2017 in Contemporary Engineering Sciences
People with hearing disabilities are those who are unable to hear, resulted in their disability to communicate using spoken language. The solution offered in this research is by creating a one way translation technology to interpret spoken language to Indonesian sign language system (SIBI). The mechanism applied here is by catching the sentences (audio) spoken by common society to be converted to texts, by using speech recognition. The texts are then processed in text processing to select the input texts. The next stage is stemming the texts into prefixes, basic words, and suffixes. Each words are then being indexed and matched to SIBI. Afterwards, the system will arrange the words into SIBI sentences based on the original sentences, so that the people with hearing disabilities can get the information contained within the spoken language. This technology success rate were tested using Confusion Matrix, which resulted in precision value of 76%, accuracy value of 78%, and recall value of 79%. This technology has been tested in SMP-LB Karya Mulya on the 7th grader students with the total of 9 students. From the test, it is obtained that 86% of students stated that this technology runs very well.
25 December 2019 in Majalah Ilmiah Teknologi Elektro
One method to process toxic waste of hospital is incinerator. An incinerator burns hospital toxic waste at high temperatures. Many hospitals have to transport their toxic waste to rhid party location which often far away. In Bali, there are 62 hospitals with 6.195 beds with 5.584.310 annual visits from patients from patients and therefore generate large amount of toxic waste. Hospitals in Bali have to send their waste to incinerators in other island a few thousand kilometres away. This practice is expensive and add more environmental problems due to emmisions from transport vehicle and traffic congestion on the Java to Bali land transports. One solution is to develop small sclae incinerator near hospital’s site. This paper discuses the development of small incinerator in Denpasar city of Bali covering insvestment, performance metric, and economical feasibilty. The project is funded by international aid and currently the only incinerator on the island. Description of the plant component, environmental metric, investment analysis Keywords — Hospital, waste treatment, toxic waste, incinerator, environmental, economical feasibility, NPV, payback period, energy conservation.
Utilization of renewable energy is a solution to overcome electricity demand, including PV. PV rooftop can be applied in every building, where solar modules can be placed on the roof buildings. It also can be done in the University of Udayana Rectorate building because the roof has the potential of PV and capable of being a power supply to meet its own needs. This study will discuss about the design PV rooftop of the Udayana rectorate building. It simulates the helioscope with an optimal angle of 14.660 get the result with solar module as much as 135 units with 2 inverter pieces of 50 kW the capacity of 45.2 kWp PLTS. While with a sloped roof angle of 15.60 get the solar module result as many as 137 units with 2 inverter pieces of 50 kW with PLTS capacity of 45.9 kWp. The calculating production of electric energy produced by PV by simulating HOMER get the result of PV configuration with Grid capable of supplying electrical energy of 304,772 kWh/year, where PV is able to supply at 61,217 kWh/year and Grid supplying electricity energy of 243,555 kWh/year. The results of the design PV rooftop and calculation results of electrical energy production can analyze the economy of the simulation results HOMER with the cost of selling electricity energy PV to PLN in the amount of Rp. 883/kWh can be said to be worthy designed because it is able to restore the cost of early investment costs PV rooftop of the rectorate building.