I Nyoman Satya Kumara

Dr. I Nyoman Satya Kumara

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 September 2019 in Jurnal SPEKTRUM
Verified
Journal Article
Open access
PDF file
NGN. Surya Gunawan
N. Surya Gunawan
IKI Nyoman Satya Kumara
I Nyoman Satya Kumara
RIRina Irawati
Rina Irawati
Smart Microgrid System of Udayana University is collaboration project between Ministry of Energy and Mineral Resources with Udayana University. The system consist of 26.4 kWp Solar Power Plant, 5 kWp Wind Turbine, 20 kWp Diesel Generator, 192 kVAh battery and connected with a low voltage distribution network 220/380 V. This paper discusses performance of the solar power plant with HelioScope. The simulation results will be compared with the real energy production from solar power plant The simulation results is 43,055.4 kWh per year. Whereas the real production is 3,948.28 kWh, lower by 4,107.4 kWh or 9.53% than the simulation. Factors that influence the difference are shade, the cleanliness of solar modules and orientation of the solar modules.

7 September 2019 in Jurnal SPEKTRUM
Verified
Journal Article
Open access
PDF file
MWM.R. Wicaksana
M.R. Wicaksana
IKI Nyoman Satya Kumara
I Nyoman Satya Kumara
IGIda Ayu Dwi Giriantari
Ida Ayu Dwi Giriantari
The Provincial Government of Bali is collaborating with the Ministry of Energy and Mineral Resources for the developing a 158 kWp rooftop solar power plant that connected to the grid of PLN. The energy produced so far has reduced the supply of electricity from PLN in the Bali Governor's Office area. The purpose of research studies is know the potential energy produced by solar power plant 158 kWp. Energy production is estimated using HelioScope simulation. Data needed includes location of the solar power plant, and solar power plant technical specifications. The simulation produces total energy data in a year of 249,764 kWh/year with the highest energy occurring in May of 24,172 kWh and the lowest energy occurring in January of 16,226 kWh.

27 March 2021 in Jurnal SPEKTRUM
Verified
Journal Article
Open access
PDF file
NWN. M. A. Wijaya
N. M. A. Wijaya
IKI Nyoman Satya Kumara
I Nyoman Satya Kumara
YDY. Divayana
Y. Divayana
Nowadays electric vehicles begin to grow and are supported by improved batterytechnology such as smaller size and capable of storing large amounts of energy. One type ofsimple electric vehicle is an electric bicycle. This paper reviews the availability of batteries andbattery chargers for electric bicycles in Indonesia. The review includes a discussion on thetechnical specifications, manufacturer, the vendor of the battery, and battery charger. Thesurvey produced a data consists of 117 batteries and 54 chargers and then processed to obtainstatus on the availability in the domestic market. The information regarding the availability ofbatteries and battery chargers for electric bicycles is expected to be used as a quick referencefor the community in choosing batteries and battery chargers for electric bicycles and canprovide an overview to stakeholders about the status of batteries and chargers in conductingresearch and development of batteries and charging equipment for electric vehicles.

25 December 2019 in Majalah Ilmiah Teknologi Elektro
Verified
Journal Article
Open access
PDF file
KMKadek Hari Merta
Kadek Hari Merta
IKI Nyoman Satya Kumara
I Nyoman Satya Kumara
WAW. G. Ariastina
W. G. Ariastina
Indonesia consumed large amount of electrical energy which mostly generated using conventional resources which was dimisihing. Therefore, government released national energy policy aimed at reducing the use of fossil-based energy and increasing the role of renewable energy. One of the renewable energy source was solar photovoltaic. Udayana University had the potential to develop photovoltaic system on all of its premises and one of them was Udayana Hospital. In this research, a study on the potential of rooftop PV at Udayana University Hospital was presented. It was found that the hospital had the potential to generate total electrical power of 835,560 Wp. Our study showed that Building #1 can potentialy generate 142,560 Wp on its rooftop which capable to supply 31.32% of energy consumption in the building. It was found Building #1 could produce energy of arround 166,407 kWh annualy that was equal to 22.6% of the electrical energy consumption of the building. By incorporating the roof of ground car parking canopy, the PV system could generate total power of 226,710 Wp which was equal to 46.98% of Building #1 total power when it was fully operational. It was estimated that this the combination of rooftop and parking PV could generate energy of 249,610 kWh annualy which was equal to 32.8% of the electric energy consumption of Building.

26 August 2019 in Majalah Ilmiah Teknologi Elektro
Verified
Journal Article
Open access
PDF file
DBDewa Nyoman Tri Budiantara
Dewa Nyoman Tri Budiantara
IKI Nyoman Satya Kumara
I Nyoman Satya Kumara
IGIda Ayu Dwi Giriantari
Ida Ayu Dwi Giriantari
—The need for electricity in Indonesia has always increased from year to year. In Indonesia, the use of fossil power plants is still widely used. Water energy itself is an alternative to replace fossil fuels in general, one of which is a Micro Hydro Power Plant. This research was made to identify MHP in Sususan Karangasem Village can be revitalized (rebuilt) through the measurement and calculation of the potential of water resources with the flow duration curve method with a probability exceeding 80%. To analyze the feasibility of PLTMH financial analysis is carry out namely Net Present Value (NPV), Internal Rate Ratio (IRR), Payback Period (PP) and Benefit Cost Ratio (BCR). The results of the analysis found that the potential of the current Karangasem MHP is 25.18 kWh with annual electricity generation of 220.577 kWh / year and electricity BPP = Rp. 774. per kWh. From the results of the analysis, the MHP of Susuan Karangasem Village can be sayto be feasible for revitalization. Keywords: Micro Hydro Power Plant (MHP), Hydrological Analysis, Energy Economy Analysis, Revitalization.

27 March 2021 in Jurnal SPEKTRUM
Verified
Journal Article
Open access
PDF file
NLNi Made Neli Lestari
Ni Made Neli Lestari
IKI Nyoman Satya Kumara
I Nyoman Satya Kumara
IGIda Ayu Dwi Giriantari
Ida Ayu Dwi Giriantari
PLTS is a power plant that converts sunlight energy into electricity using photovoltaic technology. Solar panels play an important role in PLTS, because solar panels capture solar radiation then convert it into electrical energy. The development of solar panel technology is the key to support the development of PLTS. This article reviews about the development of solar panels in Indonesia as an important component to support the development of national solar power plants towards a capacity of 6500 MW by 2025. The review will be carried out on various aspects of solar panels including the national solar panel industry, solar panels available in the domestic market, and the availability of various panels. Data is obtained from the national panel industry, the PLTS project, the PLTS user association, the national EPC, the Ministry of Energy and Mineral Resources, and the national solar panel vendor. The survey result shows there are 241 panels, both local and foreign production. Panel capacities vary from 5 Watt to 500 Watt and panel voltages are available from 12 Volt, 24 Volt and 48 Volt. Based on the survey, it is also obtained the average of Rp/Wp is Rp.18,853/Wp and the average of W/m2 is 159,46 W/m2. Increasing solar panel production can be done by providing incentives to solar panel producers in the form of product purchase guarantees and incentives to develop new factories. Information regarding the current status of solar panels in Indonesia is expected to be a quick reference for people or institutions that need it, and can be used as an introduction to research and application of PLTS in Indonesia.