This study, carried out in the northern part of Cyprus, encompasses accidents that happened in the country between the years 1994-2014 and were recorded, based on the archives of the Ministry of Labor and Social Security. Findings obtained as a result of this research, will be presented in an order and will provide a powerful source for the industrial, and even institutional Occupational Health and Safety policies in developing countries Speciall in Turkey and T.R.NC. Within the scope of the study, victims were initially classified according to their industry of work. As a result of this classification, it was established that 793 victims (26.4%) worked in the Construction industry. Further classifications was made, focusing on the Construction industry, establishing date and hour of the accident, type of accident, result of accident, loss of workday, type and place of injury, age, profession, experience, etc. These classifications showed that falls type of accidents were the most frequent (37.7%) and causing the highest number of deaths. It also became clear that unskilled workers encountered accidents most (34.4%). Looking at the frequency of accidents through the year, spring and summer appeared to be the periods in which accidents, and deaths resulting from accidents, were the most frequent.


29 March 2025 in Buildings
Verified
Journal Article
Open access
PDF file
TERFA CALEB AGWATERFA CALEB AGWA
TERFA CALEB AGWA
TÇTahir Çelik
Tahir Çelik
Building Information Modeling (BIM) has significantly impacted the global construction industry, promising efficiency, cost savings, and improved project outcomes. However, its adoption in developing countries, such as Nigeria, remains inconsistent due to multiple barriers. This study aims to investigate the barriers hindering the adoption of BIM in Nigeria’s construction sector, with a view to providing strategic recommendations for stakeholders. A mixed-methods approach was employed, combining a comprehensive literature review with semi-structured interviews from 10 experts in Nigeria, representing both industry and academia. A hybrid analytical methodology, integrating the Analytical Hierarchy Process (AHP) and fuzzy Technique for Order Preference by Similarity to the Ideal Solution (TOPSIS), was used to analyze the data, because they provide a comprehensive framework for informed decision-making. Technical barriers are identified as the most significant challenge to BIM adoption, particularly due to difficulties in accessing advanced technology. Educational barriers also play a major role, with limited awareness among industry professionals hindering widespread implementation. Economic constraints further contribute to the slow adoption, as financial limitations impact investment in necessary tools and training. The study provides policy implications and recommendations, including the development of a national BIM evaluation framework, improved training programs, and government support for standardization. These recommendations are expected to facilitate informed decision-making among stakeholders and promote effective BIM adoption in Nigeria’s construction industry, serving as a roadmap for other developing countries facing similar challenges.

1 March 2019 in Teknik Dergi
Verified
Journal Article
Closed access
PDF file
CAChangiz AHBAB
Changiz AHBAB
SDSahand Daneshvar
Sahand Daneshvar
TÇTahir Çelik
Tahir Çelik
Tr en Upon the completion of national road projects, their cost and time deviations are often reported. These deviations from the projected values are a result of complications in the time and cost management of such projects. Controlling the cost and time overrun of projects is important for successful implementation and efficient project management. However, few studies have attempted to measure the project cost and time management efficiency in civil engineering. Thus, this issue requires further investigation. In this study, large road projects that had poor cost and time management were selected. The chosen projects were configured as Decision Making Units (DMUs) in a Data Envelopment Analysis (DEA). DEA is a non-parametric modern mathematical tool for measuring relative managerial performance and determining efficient DMUs. A list containing the causes of cost and time deviations and the percentage deviation for each DMU was prepared. The cost and time management efficiency of the DMUs was calculated using DEA, and the resulting values were ordered according to importance. It is believed that this process will contribute to better cost and time management. Upon the completion of national road projects, their cost and time deviations are often reported. These deviations from the projected values are a result of complications in the time and cost management of such projects. Controlling the cost and time overrun of projects is important for successful implementation and efficient project management. However, few studies have attempted to measure the project cost and time management efficiency in civil engineering. Thus, this issue requires further investigation. In this study, large road projects that had poor cost and time management were selected. The chosen projects were configured as Decision Making Units (DMUs) in a Data Envelopment Analysis (DEA). DEA is a non-parametric modern mathematical tool for measuring relative managerial performance and determining efficient DMUs. A list containing the causes of cost and time deviations and the percentage deviation for each DMU was prepared. The cost and time management efficiency of the DMUs was calculated using DEA, and the resulting values were ordered according to importance. It is believed that this process will contribute to better cost and time management.

1 November 2021 in Teknik Dergi
Verified
Journal Article
Closed access
PDF file
OIOsman İlter
Osman İlter
TÇTahir Çelik
Tahir Çelik
En tr One of the most common concerns in construction projects is changes during execution. Changes can increase the cost and duration of the construction project hereby, can lead to conflict between the parties involved in construction projects. The change causes may differ depending on the organizations and regions characteristics. The aim of this study is to investigate the impact of organizational and regional characteristics on key change factors. In this regard, top risky change factors were identified with respect to contractors, consultants, and owners located in North Cyprus, Turkey, and the U.S.A. The research findings showed that the most risky change factors differed in accordance with the characteristics of organizations and regions. It was concluded that “Errors/Inadequacies in Contract Drawing” was the riskiest factor according to contractors while “Low price due to high competition” was noted to be the riskiest change causes with respect to consultants and owners. In point of regions, “Inconsistency between different design disciplines” was identified as the top risky change factor according to the respondents in the U.S.A. located organizations. However “Low contract price” was designated as the top risky change factor according to the respondents in North Cyprus and Turkey. In addition, key measures were suggested to be able to mitigate changes in accordance with organizational and regional characteristics. One of the most common concerns in construction projects is changes during execution. Changes can increase the cost and duration of the construction project hereby, can lead to conflict between the parties involved in construction projects. The change causes may differ depending on the organizations and regions characteristics. The aim of this study is to investigate the impact of organizational and regional characteristics on key change factors. In this regard, top risky change factors were identified with respect to contractors, consultants, and owners located in North Cyprus, Turkey, and the U.S.A. The research findings showed that the most risky change factors differed in accordance with the characteristics of organizations and regions. It was concluded that “Errors/Inadequacies in Contract Drawing” was the riskiest factor according to contractors while “Low price due to high competition” was noted to be the riskiest change causes with respect to consultants and owners. In point of regions, “Inconsistency between different design disciplines” was identified as the top risky change factor according to the respondents in the U.S.A. located organizations. However “Low contract price” was designated as the top risky change factor according to the respondents in North Cyprus and Turkey. In addition, key measures were suggested to be able to mitigate changes in accordance with organizational and regional characteristics.

8 January 2025 in Buildings
Verified
Journal Article
Open access
PDF file
ZAZanyar Omar Abdullah
Zanyar Omar Abdullah
TÇTahir Çelik
Tahir Çelik
TCTolga Celik
Tolga Celik
The construction industry in developing countries faces persistent challenges, including limited funding, poor infrastructure, insufficient use of technology, and weak quality management practices. These issues reduce productivity, compromise safety, and lower efficiency, often resulting in project delays, cost overruns, and substandard structures. This study introduces a safety and quality management framework that uses affordable camera technology and a structured web-based platform to address these challenges. The proposed system is designed to identify, document, and resolve potential issues systematically, fostering safer and more efficient construction environments. This research addresses the gap between the potential of technological advancements and their limited adoption in resource-constrained settings. Financial barriers often limit the availability of expertise on-site and restrict access to sophisticated tools, while inadequate quality control exacerbates risks, wastes resources, and undermines project outcomes. By introducing an affordable, easy-to-deploy solution, this study aims to bridge that gap and improve industry practices. Initial case studies have demonstrated promising results, including achieving acceptable quality and safety levels through the help of expertise from abroad. This paper details the design, implementation, and scalability of the proposed system while highlighting its adaptability to diverse construction contexts in developing nations. Additionally, it emphasizes the broader benefits of integrating technology into the construction industry, such as promoting economic growth and supporting sustainable development. Adopting this high-impact, cost-effective solution has the potential to significantly enhance technical capabilities, improve efficiency, and elevate social conditions through safer and more sustainable construction practices. This framework represents a transformative opportunity for the construction industry in developing countries, contributing to long-term progress and prosperity.