Tr en Upon the completion of national road projects, their cost and time deviations are often reported. These deviations from the projected values are a result of complications in the time and cost management of such projects. Controlling the cost and time overrun of projects is important for successful implementation and efficient project management. However, few studies have attempted to measure the project cost and time management efficiency in civil engineering. Thus, this issue requires further investigation. In this study, large road projects that had poor cost and time management were selected. The chosen projects were configured as Decision Making Units (DMUs) in a Data Envelopment Analysis (DEA). DEA is a non-parametric modern mathematical tool for measuring relative managerial performance and determining efficient DMUs. A list containing the causes of cost and time deviations and the percentage deviation for each DMU was prepared. The cost and time management efficiency of the DMUs was calculated using DEA, and the resulting values were ordered according to importance. It is believed that this process will contribute to better cost and time management. Upon the completion of national road projects, their cost and time deviations are often reported. These deviations from the projected values are a result of complications in the time and cost management of such projects. Controlling the cost and time overrun of projects is important for successful implementation and efficient project management. However, few studies have attempted to measure the project cost and time management efficiency in civil engineering. Thus, this issue requires further investigation. In this study, large road projects that had poor cost and time management were selected. The chosen projects were configured as Decision Making Units (DMUs) in a Data Envelopment Analysis (DEA). DEA is a non-parametric modern mathematical tool for measuring relative managerial performance and determining efficient DMUs. A list containing the causes of cost and time deviations and the percentage deviation for each DMU was prepared. The cost and time management efficiency of the DMUs was calculated using DEA, and the resulting values were ordered according to importance. It is believed that this process will contribute to better cost and time management.

24 December 2025
Verified
Thesis
Closed access
CAChangiz AHBAB
Changiz AHBAB
The success of construction projects is highly dependent on meeting the aim of project and objectives within the specified time and budget. Management plays a big role in construction projects. Most important problems that management faces in the projects are methods of execution, management of workers, equipment, scheduling and money. Delay and cost overrun are two of the important defects in construction industry. These failures can lead to various types of negative affections like disputes between contractor and client, decrease quality of work and health and safety accidents. Therefore, there is a high necessity for further investigation on delay and cost overrun factors as well as quality and health & safety and suggesting right actions to minimize these kinds of defects.

12 August 2026 in Sustainability
Verified
Journal Article
Open access
PDF file
Suhib omar abdulkareem AmroSuhib omar abdulkareem Amro
Suhib omar abdulkareem Amro
SNSepanta Naimi
Sepanta Naimi
CAChangiz AHBAB
Changiz AHBAB
The construction sector accounts for around 40% of global energy usage and surpasses 36% of carbon emissions, highlighting the urgent need for improved renovation strategies. This research presents an AI-enabled generative design optimization framework that facilitates concurrent multi-objective optimization of architectural design, structural efficiency, and energy performance. The framework employs a 20-variable parametric design space and integrates a hybrid NSGA-III, a reference-point-based many-objective evolutionary algorithm with particle swarm optimization. Machine-learning surrogate models accelerate physics-based simulations by 500–850 times while maintaining prediction accuracy above 95%. The framework is validated through twelve renovation case studies comprising eleven residential and one office building spanning seven European countries, sourced from IEA SHC Task 37 and Passivhaus Institut databases, and calibrated to ASHRAE Guideline 14 standards (CVRMSE ≤ 18.6% across all buildings). The results evidence average reductions of 84.7% in operational energy consumption and enhancements of 20.1% in material efficiency, while consistently attaining a net-zero annual energy balance. Climate conditions significantly influence optimal insulation requirements, with a 37% difference between continental and Mediterranean regions. This study presents a scalable and computationally efficient method for AI-driven renovation design, overcoming the constraints of sequential approaches and facilitating substantial decarbonization of the built environment.