Yonghong Wu

Yonghong Wu


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 September 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
MWMeiqian Wang
Meiqian Wang
WXWei Xu
Wei Xu
DCDakun Chen
Dakun Chen
JLJianguo Li
Jianguo Li
HMHongyuan Mu
Hongyuan Mu
YWYonghong Wu
Yonghong Wu
The point load test is an effective and rapid way to predict rock strength. Regarding the investigation of point load strength and the failure characteristics of rock, the point load test’s advantages and application scopes are introduced in this paper. According to the three main components—the rock itself, the size effect, and the loading cross-sectional area—the point load strength’s influencing factors and mechanisms on rock failure were analyzed, followed by expounding the significant effect of the technology of the point load test on evaluating engineering safety and stability. Based on previous scholars’ research results, there is a strong correlation between the point load strength and the uniaxial compressive strength. The parameters of the rocks from different regions and different sediments were summarized via substantial field and indoor testing. The functional relationship (mainly including the linear function, quadratic function, exponential function, power function, and logarithmic function) between the point load strength and the uniaxial compressive strength was obtained by mathematical statistical analysis. Finally, the challenges regarding the point load test were discussed, and accordingly, suggestions for future research were provided.

27 July 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
MWMeiqian Wang
Meiqian Wang
WXWei Xu
Wei Xu
HMHongyuan Mu
Hongyuan Mu
JMJian Mi
Jian Mi
YWYonghong Wu
Yonghong Wu
YWYangxing Wang
Yangxing Wang
The No. 2 conduit of the Xiaopu Tunnel in the Yuxi section of central Yunnan’s water diversion project is taken as the research object, starting from the geological conditions along with the characteristics, formation mechanism and evolutionary model of dolomite sanding. This paper discusses the engineering problems of the project’s tunnels with dolomite sanding in the water-rich section, and its corresponding engineering reinforcement plan. It was found that in the tunnel section with normal level of dolomite sanding, there was no water seepage, where measures such as advanced small conduit, mechanical excavation, short grubbing and strong support could all be adopted for safe passage. Even in the water seepage section of the weak dolomite sanding tunnel, the surrounding rock was found in close interlock with strong self-stability. The excavation and support were implemented according to the category of normal surrounding rock. In the water-rich sections with strong and intense dolomite sanding, gushing of water and sand were quite frequent, with developed fissures, broken rock masses and rich waters. During the engineering operation, phosphoric acid and sodium silicate slurry in addition to urea formaldehyde resin and oxalic acid slurry plus Malisan and liquid catalyst slurry were first prepared for water plugging. Then, pure water slurry was used for surrounding rock reinforcement, which exerted an excellent effect. This method can provide reference for reinforcing tunnels of sandy dolomite in other areas of projects.

6 May 2025 in Processes
Verified
Journal Article
Open access
PDF file
YZYuan kai Zhang
Yuan kai Zhang
XLXiaoshan Li
Xiaoshan Li
WYWenhai Yu
Wenhai Yu
YLYunhui Lu
Yunhui Lu
XCXiaoxuan Chen
Xiaoxuan Chen
LYLiu Yang
Liu Yang
The strength of soft rock masses progressively deteriorates under dissolution effects, leading to extensive pore development and structural loosening within the rock matrix. This process induces water and sand inrush phenomena at excavation faces, posing substantial challenges to construction safety. This study systematically investigates the strength degradation mechanisms and engineering disaster evolution of soft rock subjected to water–rock interactions. Utilizing representative water-rich soft rock specimens from a tunnel in central Yunnan, a multi-scale analytical framework incorporating X-ray diffraction mineral analysis systems, triaxial mechanical testing systems for rocks, scanning electron microscopy (SEM), and nuclear magnetic resonance (NMR) was implemented. This integrated methodology comprehensively elucidates the macro–meso damage evolution mechanisms of soft rock under water–rock coupling interactions. The results indicate that as the dolomite content decreases and the impurity content increases, the softening grade of the rock rises, leading to more extensive pore development. Uniaxial compression tests revealed that the Poisson’s ratio of soft rock is significantly higher than that of typical rock. Triaxial compression tests demonstrated that confining pressure has a substantial impact on soft rock, particularly affecting Poisson’s ratio. Increased water content was found to significantly reduce the strength of the soft rock. Compared to loose soft rock, the radial strain of denser soft rock was markedly greater than the axial strain, and the soaking damage effect was more pronounced. This study provides a valuable insight into the mechanical and permeability behavior of soft rock under different conditions, and provides valuable insights into the solutions for soft rock in geological engineering such as tunnel excavations.

2 May 2025 in Buildings
Verified
Journal Article
Open access
PDF file
XZXiaoyu Zhang
Xiaoyu Zhang
XMXuming Ma
Xuming Ma
WCWei Chen
Wei Chen
WXWei Xu
Wei Xu
YKYuan Kang
Yuan Kang
YWYonghong Wu
Yonghong Wu
During long-span arch bridge construction, repeated adjustments of large cantilevered segments and nonuniform cable tensions can lead to deviations from the desired arch profile, reducing structural efficiency and increasing labor and material costs. To precisely control the process of cable-stayed buckle construction in long-span arch bridges and achieve an optimal arch formation state, a constrained optimization for the buckle and anchor cable forces under one-time tension is developed in this paper. First, by considering the coupling effect of the cable-stayed buckle system with the buckle tower and arch rib structure, the control equations between the node displacement and cable force after tensioning are derived based on the influence matrix method. Then, taking the cable force size, arch rib closure joint alignment, upstream and downstream side arch rib alignment deviation, tower deviation, and the arch formation alignment displacement after loosening the cable as the constraint conditions, the residual sum of squares between the arch rib alignment and the target alignment during the construction stage is regarded as the optimization objective function, to solve the cable force of the buckle and anchor cables that satisfy the requirements of the expected alignment. Applied to a 310 m asymmetric steel truss arch bridge, the calculation of arch formation alignment is consistent with the ideal arch alignment, with the largest vertical displacement difference below 5 mm; the maximum error between the measured and theoretical cable forces during construction is 4.81%, the maximum difference between the measured and theoretical arch rib alignments after tensioning is 3.4 cm, and the maximum axial deviation of the arch rib is 5 cm. The results showed the following: the proposed optimization method can effectively control fluctuations of arch rib alignment, tower deviation, and cable force during construction to maintain the optimal arch shape and calculate the buckle and anchor cable forces at the same time, avoiding iterative calculations and simplifying the analysis process.