Merve Serter

Mrs. Merve Serter

Hasan Kalyoncu University, Gaziantep, Turkey (Türkiye)
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 August 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
STSeda Tan
Seda Tan
GAGulden Gumusburun Ayalp
Gulden Gumusburun Ayalp
MTMuhammed Zubeyr Tel
Muhammed Zubeyr Tel
MSMerve Serter
Merve Serter
YMYusuf Berkay Metinal
Yusuf Berkay Metinal
One of the latest advancements transforming the global architectural, engineering, and construction (AEC) industry is building information modeling (BIM). Although BIM implementation is at high level in developed countries, it is at a lower level in developing countries. BIM is new to the construction industry in Turkey, with only minor construction firms having implemented it. When making projections based on the current state of the Turkish AEC industry, it is foreseen that it will become mandatory in the near future. Considering this projection, it is doubtful that many construction companies will be caught unprepared for this situation and will not know how to implement BIM. Therefore, this study aimed to identify and model the critical success factors for BIM implementation and their impact size in order to gain insight for the fast and efficient implementation of BIM among construction firms in the Turkish AEC industry, which can be generalized for most developing countries. To reach these aims, a questionnaire was designed with 41 identified success criteria (SC) that were derived through a systematic literature review (SLR). The survey was conducted on construction professionals who actively implement BIM technology at their occupied firms in Turkey and they were asked to rank the importance of 41 SC on a five-point Likert scale. The sampling frame consisted of architects and civil engineers, and in total, 243 responses were received. The differentiation between SC and critical success criteria (CSC) was obtained by using a normalized mean cutoff value. An exploratory factor analysis (EFA) was used to identify the critical success factors (CSFs), and structural equation modeling (SEM) was used to examine the underlying size effects of each CSF on BIM implementation in the Turkish AEC industry. The results of this study reveal 20 CSC for successful BIM implementation, and EFA exhibited three CSFs from 20 CSC. Three critical success factors for BIM implementation in the Turkish construction industry were determined and grouped into two categories. “Awareness of technological benefits” and “organizational readiness and competitive advantages” formed one group and are the most influential critical success factors for BIM implementation. “Motivation of management regarding BIM” formed the second group of critical success factors that have a significant effect.

31 October 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
MSMerve Serter
Merve Serter
GAGulden Gumusburun Ayalp
Gulden Gumusburun Ayalp
Post-disaster reconstruction (PDR) is a complex and unpredictable process, especially concerning the construction sector, where understanding associated risks is increasingly vital. This study investigates and evaluates the present condition of post-disaster reconstruction risk (RoPDR) and discerns research trends and deficiencies in the domain via a systematic literature review (SLR) and bibliometric analysis. The Web of Science (WoS) was preferred for its extensive repository of pivotal research publications and its integrated analytical capabilities for producing representative data. This study performed a comprehensive bibliometric analysis of 204 peer-reviewed journal articles regarding the risks associated with post-disaster reconstruction from 1993 to 2024, utilizing the R statistical programming package RStudio Bibliometrix R version 4.3.1 to map the research landscape, identify literature gaps, and analyze rising trends. As a result of the analyses, the risks of post-disaster reconstruction were classified into four main clusters. Despite numerous studies exploring post-disaster reconstruction through diverse perspectives and methodologies, the associated risks of these projects remain inadequately analyzed. This inaugural bibliometric study in the realm of RoPDR utilizes novel techniques, such as the h-index, thematic mapping, and trend topic analysis, to attain a comprehensive understanding. Hence, the outcome of this study will aid scholars and practitioners in thoroughly comprehending the present condition and identifying prospective research directions.

21 December 2025 in Buildings
Verified
Journal Article
Open access
PDF file
MSMerve Serter
Merve Serter
GAGulden Gumusburun Ayalp
Gulden Gumusburun Ayalp
Post-disaster temporary housing units (PDTHUs) are crucial to the rebuilding process after disasters; however, current designs fall short in several areas, including user comfort, contextual relevance, and long-term flexibility. This situation suggests that design weaknesses emerge through interactions among multiple factors, requiring an analytic approach that goes beyond isolated evaluation. This study aims to (1) identify the main design issues in PDTHUs, (2) explore the relationships among these issues, and (3) prioritize interventions by grouping causes for decision makers. First, eleven primary design problems were identified through a systematic literature review. Next, a matrix-based questionnaire was developed and administered to five experts with experience in post-disaster projects. In the third stage, expert opinions were analyzed using the DEMATEL (Decision-Making Trial and Evaluation Laboratory) method. As a result, the design problems were classified into “cause” and “effect” groups, and a cause-and-effect diagram was created. The findings indicate that the lack of contextual and cultural integration in design (4.485); the absence of pre-disaster planning and prototyping (3.964); and low thermal, acoustic, and ergonomic comfort (3.385) are the most influential issues because they belong to “cause groups” with high Pi values. This study provides a guiding framework for practitioners and policymakers to allocate resources efficiently, plan strategically, and develop context-sensitive designs.

13 August 2026 in Buildings
Verified
Journal Article
Open access
PDF file
GAGulden Gumusburun Ayalp
Gulden Gumusburun Ayalp
MSMerve Serter
Merve Serter
Post-disaster temporary housing (PDTH) plays a central role in bridging emergency response and long-term recovery, yet its implementation is affected by a wide range of institutional, economic, site-related, technical, and environmental risks. Existing studies commonly examine only one or a limited number of these risk categories, making it difficult to compare their relative importance within a common analytical framework. This study addresses this limitation by developing and empirically evaluating an integrated risk framework for PDTH. A systematic literature review based on the PRISMA protocol was conducted to identify relevant risks, followed by a questionnaire survey of construction professionals. Principal component and confirmatory factor analyses were employed to identify the underlying risk dimensions and assess the fit and measurement properties of the resulting structure. Meanwhile, fuzzy synthetic evaluation was utilized to determine the relative importance of these dimensions. Following significance-index screening and cross-loading assessment, 29 risks were retained and grouped into four dimensions: institutional and governance risks; economic and lifecycle risks; site planning and infrastructure risks; and design and environmental performance risks. The normalized coefficients were closely clustered, ranging from 0.247 to 0.255. Institutional and governance risks had the largest numerical coefficient (0.255), followed by economic and lifecycle risks (0.250), site planning and infrastructure risks (0.248), and design and environmental performance risks (0.247). The narrow spread indicates that respondents assigned broadly comparable importance to all four dimensions, rather than identifying a single dominant risk area. The findings, therefore, point to the need for a balanced approach to PDTH risk management across governance, economic, site-related, and design-related concerns. The study contributes an empirically supported classification and prioritization framework that brings previously fragmented risk categories into a single assessment structure. The analysis does not establish causal relationships or dynamic interactions among the identified risks; rather, it provides a basis for their systematic comparison and for more detailed investigation of risk interdependencies in future research.

16 July 2025 in Resilience
Verified
Journal Article
Open access
PDF file
MSMerve Serter
Merve Serter
GAGulden Gumusburun Ayalp
Gulden Gumusburun Ayalp
Afetler, insan yaşamını kesintiye uğratarak veya tamamen durdurarak insan ve çevresi arasındaki dengeyi bozan doğal ya da insan kaynaklı olaylardır. Tarih boyunca çığ, heyelan, sel, yangın ve deprem gibi afetler, dünya genelinde ciddi can ve mal kayıplarına yol açmıştır. Bu afetler arasında, etkileri ve neden olduğu tahribat bakımından en büyük zararı depremler vermiştir. Depremlerin olumsuz etkileri ancak afet yönetim planlamalarının yapılması, toplumsal bilinç düzeyinin artırılması ve afet sonrası gereksinimlerin giderilmesi ile azaltılabilir. Deprem sonrası dönemde, afetzedelerin en öncelikli ihtiyaçlarından biri kullanıcı ihtiyacına uygun barınma koşullarının sağlanmasıdır. Deprem sonrası barınma çözümleri; acil durum barınma, geçici barınma, geçici konut ve kalıcı konut olmak üzere dört aşamada ele alınmaktadır. Acil durum barınma birimleri hızlı ve geçici çözüm birimleri, geçici barınma tehlike geçtikten sonra kısa süreli konakları, geçici konut ise kalıcı yerleşime geçene kadar ev düzeninin yeniden kurulduğu ve çoğu zaman aylarca yaşanan birimleri, kalıcı konut ise onarılan, yeniden inşa edilen birimleri ifade etmektedir. Ancak, geçici konutların sağladığı kısa vadeli çözümlerin, tasarım, yapım ve kullanım süreçlerinde çeşitli riskleri de beraberinde getirdiği bilinmektedir. Bu risklerin evrensel düzeyde ele alınarak olası olumsuz etkilerinin azaltılması, etkin bir afet yönetimi açısından büyük önem taşımaktadır. Belirtilen nedenle, bu çalışma, deprem sonrası geçici konutların tasarım, yapım ve kullanım süreçlerine ilişkin evrensel riskleri belirlemeyi ve farklı ülkelerdeki bu risklerin nasıl değişiklik gösterdiğini ortaya koymayı amaçlamaktadır. Bu amaçla çalışma kapsamında Web of Science (WoS) veri tabanı aracılığıyla, PRISMA protokolü kullanılarak sistematik literatür taraması yapılmıştır. Çalışma sonucunda 10 ana başlık altında, 65 risk faktörü tespit edilmiş ve bu risklerin ülkeler bazında nasıl farklılık gösterdiği analiz edilmiştir. Çalışmanın bulguları, deprem sonrası geçici konutlara ilişkin evrensel riskleri sistematik bir şekilde analiz ederek literatüre kapsamlı bir çerçeve sunarken, uygulamada risk yönetimi ve stratejik planlama süreçlerine rehberlik edecek somut veriler sağlamaktadır.

8 February 2026 in Resilience
Verified
Journal Article
Closed access
MSMerve Serter
Merve Serter
GAGulden Gumusburun Ayalp
Gulden Gumusburun Ayalp
Disasters, whether natural or man-made, underscore the urgent demand for effective temporary housing solutions. Post-disaster temporary housing is crucial for providing quick response and shelter, but it also presents several risks related to sustainability principles. In this study, the sustainability risks of temporary housing practices are identified through a comprehensive literature review and organized thematically. In this context, 23 papers found through a keyword search in the Web of Science database between 2016 and 2025 were analyzed using thematic analysis. During the literature review process, each risk theme was categorized by frequency based on the number of publications that referenced it. The numerical density calculated shows the prominence of these risks in the literature. Consistent with the findings, the risks were grouped into four main themes: (i) environmental, (ii) economic, (iii) social, and (iv) organizational. The study aims to assist in reevaluating post-disaster temporary housing strategies from a sustainability perspective and to provide a data-driven foundation for developing design strategy processes.