Seda Tan

Ms. Seda Tan

Hasan Kalyoncu University, Gaziantep, Turkey (Türkiye)
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 August 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
STSeda Tan
Seda Tan
GAGulden Gumusburun Ayalp
Gulden Gumusburun Ayalp
MTMuhammed Zubeyr Tel
Muhammed Zubeyr Tel
MSMerve Serter
Merve Serter
YMYusuf Berkay Metinal
Yusuf Berkay Metinal
One of the latest advancements transforming the global architectural, engineering, and construction (AEC) industry is building information modeling (BIM). Although BIM implementation is at high level in developed countries, it is at a lower level in developing countries. BIM is new to the construction industry in Turkey, with only minor construction firms having implemented it. When making projections based on the current state of the Turkish AEC industry, it is foreseen that it will become mandatory in the near future. Considering this projection, it is doubtful that many construction companies will be caught unprepared for this situation and will not know how to implement BIM. Therefore, this study aimed to identify and model the critical success factors for BIM implementation and their impact size in order to gain insight for the fast and efficient implementation of BIM among construction firms in the Turkish AEC industry, which can be generalized for most developing countries. To reach these aims, a questionnaire was designed with 41 identified success criteria (SC) that were derived through a systematic literature review (SLR). The survey was conducted on construction professionals who actively implement BIM technology at their occupied firms in Turkey and they were asked to rank the importance of 41 SC on a five-point Likert scale. The sampling frame consisted of architects and civil engineers, and in total, 243 responses were received. The differentiation between SC and critical success criteria (CSC) was obtained by using a normalized mean cutoff value. An exploratory factor analysis (EFA) was used to identify the critical success factors (CSFs), and structural equation modeling (SEM) was used to examine the underlying size effects of each CSF on BIM implementation in the Turkish AEC industry. The results of this study reveal 20 CSC for successful BIM implementation, and EFA exhibited three CSFs from 20 CSC. Three critical success factors for BIM implementation in the Turkish construction industry were determined and grouped into two categories. “Awareness of technological benefits” and “organizational readiness and competitive advantages” formed one group and are the most influential critical success factors for BIM implementation. “Motivation of management regarding BIM” formed the second group of critical success factors that have a significant effect.

10 June 2022 in Open House International
Verified
Journal Article
Closed access
STSeda Tan
Seda Tan
GAGulden Gumusburun Ayalp
Gulden Gumusburun Ayalp
Purpose: Despite several advantages of Building Information Modelling (BIM) technology, BIM has not been adopted and implemented extensively in developing countries. Consequently BIM remains at a beginner level in developing countries. To increase the level of BIM implementation, first, knowing the root factors that resist BIM implementation is necessary to know. Therefore, the objective of this study was to identify the factors that limit BIM implementation in developing countries, specifically in the Turkish Architecture, Engineering and Construction (AEC) industry.Design/methodology/approach: A questionnaire was designed with 46 influencing causes (ICs) identified through a systematic literature review. In total, 141 survey results were returned from architects and engineers, and reliability analysis, exploratory factor analysis, and confirmatory factor analysis were conducted. Furthermore, a structural equation model (SEM) was developed to identify the root factors of BIM implementation.Findings: Eight root factors affecting the prevalent use of BIM technology in the Turkish construction industry were determined and grouped into three categories based on BIM implementation level. Problems with the BIM transition process and a lack of management support are the most influential root factors limiting BIM implementation. Lack of incentives, lack of BIM education, bias regarding BIM technology and BIM-based software problems form the second group of root factors that have a significant effect. Awareness and lack of communication amongst stakeholders were identified as root factors that had a moderate effect.Research limitations/implications: This study contributes to the knowledge body by revealing eight root factors limiting BIM implementation in the Turkish AEC industry which can be generalised to most developing countries. Therefore, the outcomes of this study may be used as a practical reference for future research aimed at improving BIM adoption in developing countries through governmental, educational, and managerial solutions.Originality/value: Several studies have identified the challenges and barriers of BIM implementation in the construction industry using qualitative and quantitative analyses and projected the current state. Unlike previous studies, this study comprehensively and quantitatively determined the root factors that constrain the use of BIM in Turkey using exploratory factor analysis, confirmatory factor analysis, and structural equation modelling to present a structural model.