Arslan Muhammad

Dr. Arslan Muhammad

The Burgundy Computer Science Laboratory (LIB), University of Burgundy, 21000 Dijon, France

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2014 in Automation in Construction
Verified
Journal Article
Closed access
ZRZainab Riaz
Zainab Riaz
Arslan MuhammadArslan Muhammad
Arslan Muhammad
AKAdnan K. Kiani
Adnan K. Kiani
Salman AzharSalman Azhar
Salman Azhar

3 October 2017 in Facilities
Verified
Journal Article
Closed access
ZAZEESHAN AZIZ
ZEESHAN AZIZ
ZRZainab Riaz
Zainab Riaz
Arslan MuhammadArslan Muhammad
Arslan Muhammad
Effective management of highways requires management of diverse data sets including traffic volume data, roadway, and road edge and road-side data. Like all major infrastructure clients, highways administration authorities are under pressure to use such platforms for better management of data that, in addition to creating other opportunities, allows improved life cycle management of asset data and predictive analytics. This paper aims to review such opportunities and the value that can be generated through integrated life cycle data management by leveraging Big Data and building information modelling (BIM). A literature review is initially performed to systematically gather information to identify and understand BIM as a collaborative platform. Data management applications in other industries are also reviewed. Interviews were conducted and two industry workshops were organised to understand BIM implementation challenges within highways development projects and the role BIM can play in bridging inefficiencies resulting from loss of information at handover phases. The overall understanding lead to drawing up user needs, gathering system requirements and eventually a system architecture design to promote efficient information management throughout the asset lifecycle. It is observed that data from the design and construction phases of projects can be used to inform asset registers from an earlier stage. This information can be used to plan maintenance schedules. Moreover, it can also be integrated with data generated from numerous other sensors to develop a better picture of network operations and support key decision-making. Effective road network management involves collection and analysis of huge data from a variety of sources including sensors, mobiles, assets and Open Data. Recent growth in Big Data analytics and data integration technologies provides new opportunities to optimise operations of highways infrastructure. The system architecture designed for this research is translated into a prototype system as a proof of concept. However, it needs to be tested and validated by end users to be transformed into a useful solution for the industry. This paper provides an enhanced understanding of new opportunities created to optimise operations of highways infrastructure using the recent growth in Big Data analytics and data integration technologies.

9 October 2024 in Energy and Buildings
Verified
Journal Article
Open access
Arslan MuhammadArslan Muhammad
Arslan Muhammad
LMLamine Mahdjoubi
Lamine Mahdjoubi
SMSaba Munawar
Saba Munawar

4 December 2017 in Journal of Engineering, Design and Technology
Verified
Journal Article
Closed access
ZRZainab Riaz
Zainab Riaz
EPErika A. Parn
Erika A. Parn
David John EdwardsDavid John Edwards
David John Edwards
Arslan MuhammadArslan Muhammad
Arslan Muhammad
CSCharles Shen
Charles Shen
FPFeniosky Pena-Mora
Feniosky Pena-Mora
Purpose: This research aims to investigate the integration of real-time monitoring of thermal conditions within confined work environments through wireless sensor network (WSN) technology when integrated with building information modelling (BIM). A prototype system entitled confined space monitoring system (CoSMoS), which provides an opportunity to incorporate sensor data for improved visualization through new add-ins to BIM software, was then developed. Design/methodology/approach: An empirical study was undertaken to compare and contrast between the performances (over a time series) of various database models to find a back-end database storage configuration that best suits the needs of CoSMoS. Findings: Fusing BIM data with information streams derived from wireless sensors challenges traditional approaches to data management. These challenges encountered in the prototype system are reported upon and include issues such as hardware/software selection and optimization. Consequently, various database models are explored and tested to find a database storage that best suits the specific needs of this BIM-wireless sensor technology integration. Originality value: This work represents the first tranche of research that seeks to deliver a fully integrated and advanced digital built environment solution for automating the management of health and safety issues on construction sites.

1 October 2019 in Automation in Construction
Verified
Journal Article
Closed access
Arslan MuhammadArslan Muhammad
Arslan Muhammad
CCChristophe Cruz
Christophe Cruz
DGDominique Ginhac
Dominique Ginhac

3 October 2024 in Journal of Decision Systems
Verified
Journal Article
Open access
Arslan MuhammadArslan Muhammad
Arslan Muhammad
SMSaba Munawar
Saba Munawar
CHRISTOPHE CRUZCHRISTOPHE CRUZ
CHRISTOPHE CRUZ