Once a construction projects fails in achieving effective cost performance, it will result to cost overruns. These overruns are caused from several factors which are very important to uncover for improving the cost performance. In Malaysia, not many research works have been carried out on studying cost performance factors. Hence, this study was conducted to identify the significant factors causing cost overrun in large construction projects in Malaysia. Questionnaire for the survey was developed based on 35 common factors of cost overrun identified from literature work. These factors were grouped in 7 categories and validated by interviewing five experienced personnel of construction industry. The feedback of from the survey resulted in receiving 262 sets of completed valid responses against 400 questionnaires distributed amongst contractors, consultants and clients involved in large construction projects. The data from the questionnaire was analyzed statistically. Relative importance index method was used for hierarchal assessment of factors and found that the top 3 most significant factors of cost overrun are fluctuation of prices of material, cash flow and financial difficulties faced by contractors and poor site management and supervision. These factors belong to two categories i.e., contractor's site management and financial management category, thus improvements in these categories are paramount for controlling cost overrun in construction projects
This paper outlined the important role played by public transport to meet the demand of business and social life. The paper reviewed the type of bus services, quality of service in the bus operation that influences the passenger decision and also the role of bus provider and bus driver. An improved understanding of the bus operation is important for a well managed bus services. Maintaining a high standard of quality in service and performance is of paramount importance to encourage people to make public transport their preferred choice
15 March 2013 in Research Journal of Applied Sciences, Engineering and Technology
Poor cost performance in construction project is a common problem worldwide resulting in significant amount of cost overrun. This led us to explore the major contributors of cost overrun and propose mitigation measures to control cost overrun factors. Since, there were very few studies on cost issues in construction projects in Malaysia, hence this study was carried out in Malaysia using qualitative research method using semi-structured interview with experienced personnel’s involved in handling construction projects. A total of 21 respondents from client, consultant and contractor organizations were interviewed and requested to evaluate the eight (8) categories of cost overrun factors determined from the author’s previous work. Out of the eight categories of cost overrun factors, the respondents had ranked “contractor's site management” as most severe contributor of cost overrun and followed by “information and communication” category while the least severe category is financial management. Besides that the respondents are also requested to propose and classify mitigation measures for cost control according to suitable implementation strategies. This resulted in 15 proposals on mitigation measures and these were classified in three implementation strategies. The results indicated that among these 15 mitigation measures, five measures are classified as pro-active strategy and four measures are classified as organizational strategy. While other six measures are classified as fluid measures which can be adopted in more than one strategy.
The success of any construction project highly depends on how proper and effective the management of construction resources flow. Studies show that various resources factors affected cost management and have resulted to significant amount of cost overrun worldwide. However, a few investigations had been carried out in Malaysia regarding the effect of resources in construction industry. Hence, this study focuses on identifying significant resource factors causing construction cost overrun and also assessing the relationship between these factors. Data collection was carried out through a structured questionnaire survey consisting of 20 factors identified through a comprehensive literature review. Data was analyzed using statistical software package SPSS. The Cronbach’s alpha of the data was 0.910 which means that the collected data was highly reliable. The factors were ranked through mean rank approach and it was found that 3 most significant factors are “fluctuation of prices of materials”, “cash flow and financial difficulties faced by contractors” and “shortages of materials”. While the least significant factors in causing cost overrun are “insufficient numbers of equipment”, “relationship between management and labour”, and “labour absenteeism”. The result of Spearman test indicates that “cash flow and financial difficulties faced by contractors” with “financial difficulties of owner” correlate strongly at a significant level of 0.752. This identification of factors and relationships will help construction community in controlling resopurce factors for achieving project completion within the budget.
This research aimed to evaluate Kuwait’s current construction and demolition waste (C&D waste) situation by focusing on C&D waste generation and management issues. This work also investigated the causes and factors affecting C&D waste to understand the actual waste management activities and proposed strategies to minimize the waste generated at the local level. This study estimated C&D waste generation rates based on data collected from five construction projects and two demolition projects in Kuwait. In addition, a questionnaire survey was conducted to evaluate the causes of C&D waste generation. The results showed that the average C&D waste quantities generated by construction activities were 49.5 kg/m2 for public/commercial building projects and 35 kg/m2 for residential projects. At the same time, public/commercial construction, residential construction, and demolition works generated 1.480 ton/m2, 0.0495 ton/m2, and 0.035 ton/m2, respectively. The average composition of C&D waste from the construction sector was 35.4% concrete waste, followed by 19.2% tiles/blocks, and 14.2% metals, with the remainder being other materials. Meanwhile, the demolition waste was composed of 70% concrete and cement waste and 20% metals. The results showed that 54% of the projects disposed of their C&D waste directly in the landfills. The leading causes of C&D waste generation were reworks due to changes in specifications, poor material quality, improper material handling, and improper site management. Strategic C&D waste management practices are necessary for sustainable natural resource management and conservation of the environment.
1 April 2019 in International Journal of Integrated Engineering