Open-pit unclassified cemented paste backfilling (OPUCPB) methods have not only addressed the disposal problems of tailings but also eliminated geological hazards of high and steep open pit slopes and created conditions for ecological restoration of the open pit in the future. In this paper, slope safety simulations, heavy metal leaching, groundwater monitoring, and pollutant diffusion predictions were examined to evaluate the slope safety pattern and environmental protection enabled by OPUCPB. The results showed that: (1) The safety factor of the open pit slope was proportional to the height of OPUCPB operation. Under the condition of seismic force and seepage field, the safety factor of slope B was increased from 1.188 to 1.574 by OPUCPB. (2) The toxic and harmful components in tailings were significantly stabilized by the OPUCPB. Under the conditions of acid leaching and water leaching, the quality of the leaching solution met the requirements of the class III limit of groundwater (GB/T14848-2017). (3) The monitoring results of groundwater quality around the open pit showed that the OPUCPB had no effect on groundwater, and the water quality met the requirements of the class III limit of groundwater (GB/T14848-2017). (4) Considering the diffusion prediction of pollutants and groundwater under extreme conditions, it was found that the pollution process is slow, and the shortest time required for pollutants to reach the standard limit is 232 d at a distance of 50 m from the leakage point. Therefore, the influence of OPUCPB can be controlled, and this method can achieve improved reclamation of open pits and safety treatment of tailings. It was worth popularizing and applying in mining enterprises.
The empty-space subsequent filling mining method is the main mining scheme for underground metal mines to achieve large-scale mechanized mining. The stage height, one of the main parameters of this method, affects the various production process aspects of the mine and influences the stability of the goaf. In order to determine the stage height scientifically and rationally in the empty-space subsequent filling mining method, a formula for the stabilized critical safe height of a high goaf in an underground metal mine was derived based on Pu’s arch equilibrium theory, Bieniawski’s pillar strength limit theory, and the Kastner equation and combined with the results of an orthogonal analysis to rank the importance of the main factors in the formula. A copper mine in Jiangxi Province was used as a case study, with the reliability of the formula verified by numerical simulation and industrial testing. The factors in the formula influencing the critical stabilized safe height of the goaf were, in descending order, the compressive strength of the rock body, the width of the two-step mining pillar, the width of the one-step mining room, the mining height, and the depth of mining. Based on the calculation results, the recommended stage heights are 30 m (−378 m middle section) and 25 m (−478 m middle section) in the area of poor rock body stability and 50 m in the area of better rock body stability. The simulation results show that the goaf is significantly affected by the compressive stress under the condition of a certain rock body stability and that the compressive stress increases with increasing goaf height. The minimum recommended values of the sidewall safety coefficients in areas of poor and better rock stability are 1.04 and 1.06, respectively. The volume deviation coefficients of the three industrial test mines were all controlled within 3%, indicating that no obvious collapse and destabilization phenomenon occurred in the goaf. This paper provides some theoretical and applied guidance for the stage height design of similar underground metal mines using the empty-space subsequent filling mining method.
Ground vibrations induced by underground mining blasting has a significant impact on the stability and safety of surface buildings near mines. Due to the thick rock layers overlying underground mines, there is presently limited accuracy in regard to predicting ground vibrations induced by underground mine blasting. Therefore, this study aims to improve the accuracy of predicting ground vibrations induced by underground blasting by comprehensively measuring the peak particle velocity (PPV) in all three directions and independently considering on the impact of vertical distance. Random forest regression (RFR), bagging regression (BR), and gradient boosting regression (GBR) were used to regress the X-axis PPV (X-PPV), Y-axis PPV (Y-PPV), and Z-axis PPV (Z-PPV) based on blasting records measured at an iron mine. In addition, a genetic algorithm, gray wolf optimizer (GWO), and a particle swarm optimization were used to optimize the parameters of the RFR, BR, and GBR. The comparison results show that GWO-GBR is the optimal model for the prediction of the X-PPV (R2 = 0.8072), Y-PPV (R2 = 0.9147), and Z-PPV (R2 = 0.9265), respectively. Thus, the GWO-GBR model proposed in this study is considered a highly reliable model for predicting ground vibrations induced by underground mine blasting to ensure the safety of the mines’ surroundings.
With mining operations worldwide comprehensively advancing the development of intelligent mines, mine digitalization has become an inevitable trend in the evolution of the mining industry. In this context, efficient and high-precision fracture identification has emerged as a critical prerequisite technology for achieving digital transformation in intelligent mining systems. However, severe environmental noise in deep mines and the limitations of standard pixel-wise loss functions, which ignore the geomechanical continuity of fractures, often lead to fragmented segmentation results. To address this, we introduce the existing SCSegamba architecture as an efficient feature extraction backbone and propose a novel Fracture Orientation Consistency Loss (FOCL) as our core optimization objective. By penalizing directional discrepancies between predicted and actual fracture networks, FOCL explicitly enforces geometric and topological continuity. We evaluated our framework on a custom dataset of 600 high-resolution images from deep underground roadways. The results demonstrate that the SCSegamba-FOCL framework effectively bridges discontinuous fine cracks in low-contrast zones. It achieves a superior Mean Intersection over Union (mIoU) of 85.67% and an F1-Score of 0.869, while maintaining a real-time inference speed of 38 frames per second (FPS) on edge hardware.
Pre-existing concealed goafs underneath open-pit slopes (PCO-goafs) pose a serious threat to the stability of open-pit slopes (OP-slopes), which is a common problem worldwide. In this paper, the variable weight-target approaching method, equilibrium beam theory, Pratt’s arch theory, and numerical simulation are used to analyze the management solutions and stability of five PCO-goaf groups in the Nannihu molybdenum mine located in Luoyang City, Henan Province, China. The five PCO-goaf groups, numbered 1#, 2#, 3#, 4#, and 5#, are divided into four hazard classes, ranging from extremely poor to good stability. The stability of 1#, 2#, and 4# is poor and must be managed by filling, and the design strength of backfill is 1.2 MPa; caving is used to treat 3# and 5#, and the safe thickness of the overlying roof is calculated to be 10.5–41 m. After treatment, the safety coefficient of the slope is greater than 1.2, indicating that the slope is stable. This study provides insight and guidance for the safe operation of open-pit mines threatened by the existence of PCO-goafs.