Fatin Amrina A. Rashid

Ms. Fatin Amrina A. Rashid

Universiti Kebangsaan Malaysia, Kuala Selangor, Malaysia
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 October 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
FRFatin Amrina A. Rashid
Fatin Amrina A. Rashid
HHHawa Hishamuddin
Hawa Hishamuddin
NSNizaroyani Saibani
Nizaroyani Saibani
MMMohd Radzi Abu Mansor
Mohd Radzi Abu Mansor
Zambri HarunZambri Harun
Zambri Harun
Various uncertainties exist in the End-of-Life Vehicle (ELV) industry, which further complicates the ELV business’s growth. In order to pursue greater progress in the ELV business establishment, a comprehensive analysis of previous ELV studies with regard to the supply chain uncertainty perspective is essential. The objective of this study is aimed at categorising the existing supply chain uncertainty sources according to their end-of-life (EoL) strategies, identify the management approaches adopted to analyse the prominent research trends, and conduct a regional analysis of ELV supply chain studies for the past years, from 2016 until 2022. The content analysis method was used to extract all the essential information from previous research, and an analysis was performed to obtain the latest research trends and identify the relationship between the gathered data. The findings show that the past research focuses on three main supply chain uncertainties, namely, uncertainty in logistics and network facilities (31.8%), production and operations (30.7%), and environmental (25.0%). Furthermore, the regional analysis shows that 83% of the studies were conducted in developing countries over the past years. Lastly, several research gaps were presented to provide researchers with potential directions and the way forward to explore ELV supply chain research from the uncertainty management context.

24 September 2023 in Mathematics
Verified
Journal Article
Open access
PDF file
NRNuramilawahida Mat Ropi
Nuramilawahida Mat Ropi
HHHawa Hishamuddin
Hawa Hishamuddin
DWD.A. Wahab
D.A. Wahab
WJWakhid Jauhari
Wakhid Jauhari
FRFatin Amrina A. Rashid
Fatin Amrina A. Rashid
MMMohd Radzi Abu Mansor
Mohd Radzi Abu Mansor
Remanufacturing is one of the ways forward for product recovery initiatives and for maintaining sufficient production flow to satisfy customer demand by providing high-quality goods with a combination of new and return parts through a circular economy. Recently, manufacturers have been progressively incorporating remanufacturing processes, making their supply chains vulnerable to disruptions. One of the main disruptions that occurs in remanufacturing systems is the shortage of spare parts supply, which results in unexpected delays in the remanufacturing process and could eventually result in a possible loss of sales. In the event of such potential disruptions, remanufacturing facilities must manage their supply chains in an effective and optimal manner such that the negative impact of disruptions to their business can be minimised. In this study, a two-stage production–inventory system was analysed by developing a cost-minimisation model that focuses on the recovery schedule after the occurrence of a disruption in sourcing spare parts for a remanufacturer’s production cycle. The developed model was solved using the branch-and-bound algorithm, where the experimental results demonstrated that the model provides effective solutions. Through numerical experiments, results indicated that the optimal recovery schedule and the number of recovery cycles are considerably dependent on the disruption time, lost sales and backorder costs. A sensitivity analysis showed that the lost sales option seems to be more effective than the backorder sales option in optimising the system’s overall cost due to unmet demand, which becomes lost sales when serviceable items are reduced, thereby shortening recovery time. Furthermore, a case study revealed that a manufacturer’s response to disruption is highly influenced by the spare part costs and overall recovery costs as well as the supplier’s readiness level. The proposed model could assist managers in deciding the optimal production strategy whilst providing interesting managerial insights into vital spare parts recovery issues when disruption strikes.

14 April 2023 in Preprints.org
Verified
Preprint
Open access
PDF file
NRNuramilawahida Mat Ropi
Nuramilawahida Mat Ropi
HHHawa Hishamuddin
Hawa Hishamuddin
DWD.A. Wahab
D.A. Wahab
WJWakhid Jauhari
Wakhid Jauhari
FRFatin Amrina A. Rashid
Fatin Amrina A. Rashid
MMMohd Radzi Abu Mansor
Mohd Radzi Abu Mansor
Remanufacturing is a way for product recovery initiative and maintaining sufficient production flow to satisfy customer demand through circular economy. Recently, manufacturers have been progressively incorporating remanufacturing processes, making their supply chain vulnerable to disruptions. Among the disruptions that usually occur is the shortage in spare parts supply, which causes unexpected delay in production and possible loss of sales. In the face of potential disruption, it is essential for remanufacturing facilities to manage their supply chains in an optimum manner as to decrease the adverse impact of disruptions to their business. In this study, a two-stage production-inventory system is analysed by developing a cost-minimisation model focusing on the recovery schedule after a disruption occurrence in sourcing spare parts for a remanufacturer’s production cycle. The developed model was solved using the branch and bound algorithm. Through numerical experiments, the results indicate that the optimal recovery schedule and the number of recovery cycles are significantly dependant on disruption time, lost sales and backorder costs. Moreover, a sensitivity analysis shows that the lost sales option seems to be more effective than the backorder option in optimising the system’s overall cost. The proposed model could assist managers in deciding the optimal production strategy while providing interesting managerial insights into vital spare parts recovery issues when disruption strikes.