Qiancheng Fang

Qiancheng Fang


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 June 2022 in Buildings
Verified
Journal Article
Open access
PDF file
JWJiangfeng Wang
Jiangfeng Wang
Ahmed Salih MohammedAhmed Salih Mohammed
Ahmed Salih Mohammed
Elżbieta MacioszekElżbieta Macioszek
Elżbieta Macioszek
MAMujahid Ali
Mujahid Ali
Dmitrii UlrikhDmitrii Ulrikh
Dmitrii Ulrikh
QFQiancheng Fang
Qiancheng Fang
Numerous studies have reported the effective use of artificial intelligence approaches, particularly artificial neural networks (ANNs)-based models, to tackle tunnelling issues. However, having a high number of model inputs increases the running time and related mistakes of ANNs. The principal component analysis (PCA) approach was used in this work to select input factors for predicting tunnel boring machine (TBM) performance, specifically advance rate (AR). A reliable and precise forecast of TBM AR is desirable and critical for mitigating risk throughout the tunnel building phase. The developed PCAs (a total of four PCAs) were used with the artificial bee colony (ABC) method to predict TBM AR. To assess the created PCA-ANN-ABC model’s capabilities, an imperialist competitive algorithm-ANN and regression-based methods for estimating TBM AR were also suggested. To evaluate the artificial intelligence and statistical models, many statistical evaluation metrics were evaluated and generated, including the coefficient of determination (R2). The findings indicate that the PCA-ANN-ABC model (with R2 values of 0.9641 for training and 0.9558 for testing) is capable of predicting AR values with a high degree of accuracy, precision, and flexibility. The modelling approach utilized in this study may be used to other comparable studies involving the solution of engineering challenges.