Because deep foundation pits and tunnels are deformation-sensitive structures, the safety of these projects is generally affected by coupled risks. In deep foundation pit construction, if the existing tunnel structure adjacent to the deposit is damaged, it can produce a severe group disaster. It is necessary to identify an efficient risk analysis model to study the dynamic coupled risk of deep foundation pit projects adjacent to existing underpass tunnels and to analyze the risk evolution law to achieve effective real-time safety control. This study proposes a coupled risk analysis model using the N–K model and dynamic Bayesian network to construct deep foundation pits in adjacent existing underpass tunnels. The model is predicated on association rules to explore the interrelationship between risk factors to build a dynamic Bayesian network structure. In addition, the N–K model is utilized to quantify coupled risks under such complex working conditions and to optimize the dynamic Bayesian network structure. The developed model clarifies the risk coupling mechanism of deep foundation pit construction adjacent to an existing underpass tunnel, finds the critical points in the risk transfer process, and conducts dynamic risk prediction and accident causation diagnosis for the coupled risk to realize the dynamic control of the coupled risk in the adjacent existing underpass tunnel construction. Taking the Nanning underground comprehensive utilization project as an example, the validity and applicability of the proposed approach were tested. The results showed that the model is feasible and has application potential, providing effective decision support for safety control while constructing deep foundation pits adjacent to existing tunnels.
Collapse is one of the most significant geological hazards in mountain tunnel construction, and it is crucial to accurately predict the collapse probability. By introducing the reliability theory, this paper proposes a calculation method for the collapse probability in mountain tunnel construction based on numerical simulation, support vector regression (SVR), and the Monte Carlo (MC) method. Taking the Jinzhupa Tunnel Project in Fujian Province as a case study, three-dimensional models were constructed, and the safety factors of the surrounding rock were determined using the strength reduction method. By defining the shear strength parameters of the surrounding rock as random variables, the problem was formulated as a reliability model, and the safety factor was chosen as the reliability index. To increase computational efficiency, the SVR model was trained to replace numerical simulations, and the MC method was adopted to calculate the probability of collapse. The results showed that the cause of the collapse was the change in the excavation method and the very late installation of supports. The feasibility and reliability of the proposed method have been verified, indicating that the method can be used to predict the probability of collapse in a practical risk assessment of mountain tunnel construction.
The construction of deep foundation pits adjacent to existing subway tunnels faces enormous challenges, and once a safety accident occurs, there are often mass injuries that cause substantial economic losses. However, there are many shortcomings and defects in the traditional methods of assessing the safety of the pit itself and the existing tunnel in the construction of the deep foundation pit adjacent to existing tunnels. This study establishes an optimized complex network-based dynamic risk assessment model to dynamically assess the overall risk of deep foundation pits in adjacent existing tunnels systematically, solving the challenges of inaccurate risk assessment and inaccurate description of correlations between nonstationary time series data. In this study, we first divide the monitoring data into time windows and describe the correlation between nonstationary time-series monitoring data within each window based on the MF-DCCA method and the threshold method, and establish the adjacency matrix to prepare for the establishment of an optimized complex network model. Secondly, based on the adjacency matrix, a complex network model under different time windows is constructed, and risk assessment indexes are established through the topological parameters of the complex network model to explore the evolution of risk in time and space, so as to realize the risk distribution and quantitative evolution assessment of the system which is deep foundation pit adjacent to existing subway tunnels. Finally, the proposed method is tested by taking the Nanning underground comprehensive utilization project as an example. The results show that this method can quantify the risk of the construction of deep foundation pits adjacent to existing tunnels more effectively than the traditional method to describe the evolution law better. It has important guiding significance for strengthening the safety risk monitoring and safety management of the construction system of deep foundation pits adjacent to existing tunnels.