1 August 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
BWBo Wu
Bo Wu
YWyu wei
yu wei
GMGuowang Meng
Guowang Meng
SXShixiang Xu
Shixiang Xu
QWQinshan Wang
Qinshan Wang
CZChenxu Zhao
Chenxu Zhao
Construction of the deep foundation pit (DFP) in subway stations is fraught with significant uncertainties, which may cause project delays due to discrepancies between single-indicator monitoring warning information and actual conditions at the site. Therefore, this article proposes a safety assessment method for DFP based on the Game-Cloud Model. An entirely quantitative assessment index system is established with on-site monitoring projects according to the design safety classification of DFP. Considering the one-sidedness of using a single method to determine the weights of assessment indices, game theory is introduced to calibrate the subjective and objective weights determined by the grey decision-making trial and evaluation laboratory (GDEMATEL) and the entropy method, respectively. Next, we use the forward cloud generator of the cloud model (CM) to generate the safety level membership function of the evaluation indicators. Finally, we quantitatively calculate the synthetic safety level of DFP using the comprehensive evaluation approach. A 19-day dynamic assessment was conducted on the actual engineering project by the proposed method. The results indicated that the synthetic safety level of the assessed area ranged between grades Ⅰ and Ⅱ, corresponding to Negligible and Acceptable in the acceptance criteria. Compared with the single-indicator monitoring warning results, it was more in line with on-site observation, which verified its reliability and practicality.

24 April 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
GMGuowang Meng
Guowang Meng
HLHongle Li
Hongle Li
BWBo Wu
Bo Wu
GLGuangyang Liu
Guangyang Liu
HYHuazheng Ye
Huazheng Ye
YZYiming Zuo
Yiming Zuo
Collapse is one of the most significant geological hazards in mountain tunnel construction, and it is crucial to accurately predict the collapse probability. By introducing the reliability theory, this paper proposes a calculation method for the collapse probability in mountain tunnel construction based on numerical simulation, support vector regression (SVR), and the Monte Carlo (MC) method. Taking the Jinzhupa Tunnel Project in Fujian Province as a case study, three-dimensional models were constructed, and the safety factors of the surrounding rock were determined using the strength reduction method. By defining the shear strength parameters of the surrounding rock as random variables, the problem was formulated as a reliability model, and the safety factor was chosen as the reliability index. To increase computational efficiency, the SVR model was trained to replace numerical simulations, and the MC method was adopted to calculate the probability of collapse. The results showed that the cause of the collapse was the change in the excavation method and the very late installation of supports. The feasibility and reliability of the proposed method have been verified, indicating that the method can be used to predict the probability of collapse in a practical risk assessment of mountain tunnel construction.

5 July 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JZjiajia zeng
jiajia zeng
BWBo Wu
Bo Wu
CLCong Liu
Cong Liu
Considering the complexity of the metro pit construction environment, the existing risk early-warning methods cannot ensure high-precision early warning. A high-accuracy metro pit collapse risk fusion early-warning method is proposed in present study. The main contributions include (1) presenting a new input to the fusion model by optimizing the machine learning model through a multi-step rolling method, and then using the basic probability assignment values obtained from the cloud model as input to the fusion model and (2) developing an improved methodology to address the paradoxical results of the fusion of traditional Dempster–Shafer evidence theory when there is a high level of conflict in multi-source risk prediction data. The proposed method is successfully applied to the Guangzhou Metro station project. By analyzing the early-warning results of 240 moments in 6 monitoring points, compared with the single information source method and the traditional D-S method, the early-warning accuracy of this method is increased by 15.8% and 10.8% respectively, the false alarm rate is reduced by 6.3% and 5.5%, respectively, and the missed alarm rate is reduced by 9.5% and 5.3%, respectively. The high-accuracy fusion early-warning method proposed in this paper has good universality and effectiveness in the early warning of subway foundation pit collapse risk.

4 June 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
CLCong Liu
Cong Liu
QTQianlong Tang
Qianlong Tang
BWBo Wu
Bo Wu
QWQiang Wan
Qiang Wan
YYYisheng Ye
Yisheng Ye
A train–tunnel–surrounding rock numerical model was established by using ABAQUS to analyze the dynamic response of a heavy-haul railway tunnel in hard rock, quantify the influence of the train axle load on the tunnel dynamic response and determine its potential vulnerable position. The results suggested that: Under the 30 t train load and surrounding rock pressure coupling, the maximum principal stress caused by rock pressure was 1.27 MPa, located at the bottom of the structure below the side drain; the maximum dynamic response of the tunnel structure and base rock was located directly below the rail. The lower part of the side drain and rail was the vulnerable position in the tunnel bottom structure, and the probability of base disease under the rail may be higher than that in soft-rock tunnels, for it has a greater dynamic response and thinner structure compared to a soft-rock tunnel. The maximum principal stress amplitude of the tunnel structure and base rock were 129.3 kPa and 43.0 kPa, respectively. When the axle load increased by 1 t, the dynamic amplitude of the structure’s maximum principal stress increased by about 4.14 kPa, and the base rock’s maximum principal stress increased by about 1.33 kPa. The rock pressure was not negligible in the dynamic analysis of the railway tunnel, and the dynamic response of the tunnel bottom structure and base rock will decrease, obviously, when the rock pressure is ignored.

16 December 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
WZWeiqiang Zheng
Weiqiang Zheng
BWBo Wu
Bo Wu
SXShixiang Xu
Shixiang Xu
XCXimao Chen
Ximao Chen
YYYongping Ye
Yongping Ye
Zhiping LiZhiping Li
Zhiping Li
In order to reduce the risk of collapse disasters during tunnel construction in mountainous areas and to make full use of the available data, a collapse risk assessment model for highway tunnel construction was established based on the WOA–XGBOOST algorithm. Three major categories of tunnel construction risk, namely engineering geological factors, survey and design factors, and construction management factors, were selected as the first-level indicators, and 14 secondary indicators were further specified as the input variables of the collapse risk assessment model for tunnel construction. The confusion matrix and accuracy metrics were employed to evaluate the training and prediction performance of the risk assessment model on both the training set and the test set. The results show that subjective weights derived from the G1 method were integrated with objective weights generated by the WOA–XGBOOST algorithm. A game-theory-based weight integration strategy was then applied to optimize the combined weights, effectively mitigating the biases inherent in single-method weighting approaches. Risk quantification was systematically conducted using a cloud model, while spatial risk distribution patterns were visualized through graphical cloud-mapping techniques. After completion of model training, the proposed model achieved a high accuracy of over 99% on the training set and around 95% on the held-out test set based on an available dataset of 100 collapse-prone tunnel construction sections. Case-based verification further suggests that, in the studied collapse scenarios, the predicted risk levels are generally consistent with the actual engineering risks, indicating that the model is a promising tool for assisting tunnel construction risk assessment under similar conditions. The research outcomes provide an efficient and reliable approach for assessing risks in tunnel construction, thereby offering a scientific basis for engineering decision-making processes.

13 May 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
BWBo Wu
Bo Wu
RZruonan zhu
ruonan zhu
ZLZhaochun Liu
Zhaochun Liu
JZjiajia zeng
jiajia zeng
CLCong Liu
Cong Liu
The backfill area of tunnel projects may deform or collapse due to the cyclic disturbance of groundwater and train loads. Hence, the anti-deformation and crack resistance performance of backfill materials under cyclic disturbance is critical to engineering safety. In this paper, concrete was produced by mixing 0.85 mm, 1–3 mm and 3–6 mm rubber particles instead of 10% sand, and tested to discuss the effect of rubber particle size on the deterioration of concrete material properties (compressive characteristics and energy dissipation) after bearing cyclic loading. The stress–strain curve and various parameters obtained through the uniaxial compression test and cyclic load test were used to explore the optimal grain size that can be applied to the tunnel engineering backfill area, and numerical simulation was adopted to calculate the deformation of the surrounding rock and the structural stress of different backfill materials. Research shows that the increase in particle size lessens the compressive strength, deformation resistance and cracking resistance of specimens, but after the cyclic loading test, the concrete material deterioration analysis indicates that rubber concrete has lesser and more stable losses compared to ordinary concrete, so the optimum rubber particle size is 0.85 mm. Numerical calculations show that RC-1 reduces the arch top displacement by 0.4 mm, increases the arch bottom displacement by 0.6 mm and increases the maximum principal stress by 11.5% compared to OC. Therefore, rubber concrete can ensure the strength and stability requirements of tunnel structures, which can provide a reference for similar projects.