Flooding is one of the most frequent natural disasters across the world, which damages properties and may take the lives of people. Flood warning systems can play a significant role in minimizing those effects by helping to evacuate people from the probable affected areas during peak flash flood times. Therefore, a conceptual approach of an automated flood warning system is presented in this research to protect several houses, roads, and infrastructures along the Grand River, which are vulnerable to flooding during a 500 year return period flash flood. The Grand River is a tributary of Lake Erie, which lies in the Grand River watershed in the northeastern region of the United States and has a humid continental climate and receives lake-effect precipitation. The flood warning system for the Grand River was developed specifically during high flow conditions by calculating flood travel time and generating the inundation mapping for 12 different selected flood stages, which were approximately 2 to 500 years in recurrence interval, ranging from 10 ft. to 21 ft. at gage station 04212100, near the City of Painesville, OH. A Hydraulic Engineering Center-River Analysis System (HEC-RAS) was utilized for hydraulic modeling. Geospatial data required for HEC-RAS was obtained using a Digital Elevation Model (DEM) derived from Light Detection and Ranging (LiDAR) datasets, which were pre-processed and post-processed in HEC-GeoRAS to produce flood inundation maps. The flood travel time and flood inundation maps were generated by integrating LiDAR data with field verified survey results in order to provide the evacuation lead time needed for the people of probable affected areas, which is different from earlier studies. The generated inundation maps estimate the aerial extent of flooding along the Grand River corresponding to the various flood stages at the gage station near the City of Painesville and Harpersfield. The inundation maps were overlaid on digital orthographic maps to visualize its aerial extents, which can be uploaded online to provide a real-time inundation warning to the public when the flood occurs in the river.
The deterioration of bridge substructure is a serious concern across the United States. The pier encasement is one of the most common practices for repairing and strengthening the bridge substructure. It is a rehabilitation process of existing pile piers during the repair or replacement of the bridge superstructure, which involves enclosing part of an existing pile pier with a polyethylene or PVC pipe large enough to provide at least three inches of concrete cover over the existing pier when filled. However, this process of enclosing pile piers might elevate water level due to increase in pier width, which could be hazardous in high-risk flood zones. Furthermore, it may create an adverse impact on the stability of the bridge due to scouring around the pier foundation. In order to gain knowledge on the backwater effect due to pile encasement, Hydraulic Engineering Center-River Analysis System (HEC-RAS) was used in this research to perform hydraulic simulations near the bridge sites. These simulations were carried out for various channel configurations and pier sizes with a wide range of flows, which resulted into 224 HEC-RAS models in order to investigate the effects of pile pier encasement on the headwater elevation. This study demonstrated that the water elevation measured in the upstream of the bridge showed no-rise condition, especially for wider channel sections with flatter slopes. However, the water elevation at the immediate upstream of the bridge was slightly higher, and the increasing pattern was only noticeable for a smaller channel width (20 ft), and specifically, for increased flow rate. As the area of flow was decreased resulting in increased water surface elevation due to encasement, a generic power equation in the form of Y = aXb was suggested for various channel slopes for the increased water surface elevation (Y) for each percentage decrease in channel area (X).
4 February 2020 in Ish Journal of Hydraulic Engineering
The major objective of this research is to assess the effects of winter ice cover and simulate the flooding within bridge vicinity of the Grand River, Ohio, the USA for both in the historical period (1959–2014) and future period (2015–2098). The LiDAR data along with field-verified survey data were utilized for the calibration and validation of HEC-RAS. The stage increments up to 6.75 ft were detected at the upstream section of the Bridge due to historical ice jams. Moreover, the increment in the inundation area varied from 24% to 52% for various percentile winter flows. The percentage increase in the inundation area was highest for the 25-percentile flow than the higher percentile flow when the same thickness of ice cover was used in the simulation. The estimated ice thickness using Stefan’s equation for various emission scenarios (RCP 2.6, RCP 4.5 and RCP 8.5) for three climate models were found to be decreasing in the future period. As per the standard practice in the United States, authors have used U.S. Customary Unit System (fps unit system) in this paper.