Yu hang Zhou

Mr. Yu hang Zhou


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 May 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XOXun Ou
Xun Ou
YLYuanming Liu
Yuanming Liu
CLChao Li
Chao Li
Xiaohan ZhouXiaohan Zhou
Xiaohan Zhou
QCQingzhi Chen
Qingzhi Chen
ZQzhang quan
zhang quan
The interaction mechanism between a two-lane shield tunnel and an existing tunnel during oblique underpass is a matter of widespread concern in the engineering community, and knowledge in this area remains crude. In the construction of subway tunnels in mountainous cities with huge topographical fluctuations, internal forces and deformations are inevitable in existing tunnels. To verify the applicability of existing shield construction technology and empirical parameters to the Guiyang area, a systematic and refined numerical analysis was conducted on the shield passing under the existing tunnel section of the Tao-Hua interval of Guiyang Metro Line 3. In this paper, the accuracy of the numerical simulation is verified by comparing the calculated results with the data measured in the field; the settlement pattern that appeared above the existing tunnel during the construction of the shield with slurry hardening is analyzed; the internal forces, lateral deformation, and torsional deformation of the existing tunnel caused during the excavation of the new tunnel are obtained based on the numerical simulation results; finally, the effect of the old and new tunnels on the torsional deformation and settlement of the existing tunnel under different spatial intersection angles is studied. The results show that the internal forces, lateral deformation, and surface settlement of the existing tunnel due to the diagonal underpass show obvious asymmetric characteristics. Additionally, the existing tunnel experiences local irrecoverable torsional deformation, with the maximum torsional deformation occurring at the intersection of the old and new tunnels, and the spatial intersection angle of the old and new tunnels has a great influence on the maximum settlement of the tunnel vault and arch bottom, which shows a negative correlation.

8 December 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YZYu hang Zhou
Yu hang Zhou
YLYuanming Liu
Yuanming Liu
QCQingzhi Chen
Qingzhi Chen
XOXun Ou
Xun Ou
YLYingxiao Li
Yingxiao Li
When urban subway tunnels cross existing bridge pile foundations, having a pile foundation underpinning that ensures the safe operation of existing bridges while enabling the safe construction of subway tunnels is the focus of attention. This paper takes the running tunnel project from Huaguoyuan West Station to Huaguoyuan East Station of Rail Transit Line 3 in Guiyang City, Guizhou Province as the background. The reasonableness and feasibility of the passive underpinning construction scheme for the Guihuang Viaduct was studied. The construction plan includes the following steps: underpinning pile construction, foundation pit excavation, the concreting of the underpinning bearing platform, and existing pile truncation. In order to ensure the structural safety of the existing viaduct during the construction of the pile foundation underpinning, a 3D numerical model of the construction of pile foundation underpinning and the whole process of tunnel construction was established. The settlement calculation results of the foundation pit and bridge pier were compared and analyzed with the field monitoring data to verify the accuracy of the numerical model. Further detailed analysis of the settlement of the bridge deck, the deformation of the existing piles, the axial forces of the existing piles, and the forces on the underpinning bearing platform was carried out. The results show that the bridge superstructure load can be transferred to the underpinning bearing platform smoothly after the existing pile truncation construction. The removal of obstacle piles during tunnel excavation has a very limited impact on the superstructure of the bridge, proving the reasonableness and feasibility of the construction plan.