Water can deteriorate the compositional properties of rock through softening and dissolution. The water content rate of rock has a certain effect and can cause changes in rock properties caused by the water action. In this research, to study the effects of the water content rate on the strength and brittle plasticity of limestone, uniaxial compression tests with different water content rate states were conducted, and the form of limestone damage under different water content rate conditions was analyzed. The effects of the different water content rates on the modulus of elasticity, uniaxial compressive strength, brittleness index B value, and brittleness correction index BIM value (BIM: the ratio of dissipated strain energy to releasable elastic strain energy at the peak point of the specimen) of limestone were investigated. It was found that as the rate of water content in the limestone increased from 0% to 0.27%, the penetration shear surface on the limestone’s damaged surface decreased. The modulus of elasticity decreased from 8.85 to 6.76 GPa, the uniaxial compressive strength decreased from 74.11 to 57.60 MPa, the brittleness index B value decreased from 1.17 to 1.04, and the brittleness correction index BIM value increased from 0.09 to 0.26. As the rate of water content on the limestone increased, the rock’s modulus of elasticity and uniaxial compressive strength decreased. Additionally, the rock’s brittleness decreased, and the percentage of plastic deformation in the total deformation increased.
The interaction mechanism between a two-lane shield tunnel and an existing tunnel during oblique underpass is a matter of widespread concern in the engineering community, and knowledge in this area remains crude. In the construction of subway tunnels in mountainous cities with huge topographical fluctuations, internal forces and deformations are inevitable in existing tunnels. To verify the applicability of existing shield construction technology and empirical parameters to the Guiyang area, a systematic and refined numerical analysis was conducted on the shield passing under the existing tunnel section of the Tao-Hua interval of Guiyang Metro Line 3. In this paper, the accuracy of the numerical simulation is verified by comparing the calculated results with the data measured in the field; the settlement pattern that appeared above the existing tunnel during the construction of the shield with slurry hardening is analyzed; the internal forces, lateral deformation, and torsional deformation of the existing tunnel caused during the excavation of the new tunnel are obtained based on the numerical simulation results; finally, the effect of the old and new tunnels on the torsional deformation and settlement of the existing tunnel under different spatial intersection angles is studied. The results show that the internal forces, lateral deformation, and surface settlement of the existing tunnel due to the diagonal underpass show obvious asymmetric characteristics. Additionally, the existing tunnel experiences local irrecoverable torsional deformation, with the maximum torsional deformation occurring at the intersection of the old and new tunnels, and the spatial intersection angle of the old and new tunnels has a great influence on the maximum settlement of the tunnel vault and arch bottom, which shows a negative correlation.
When urban subway tunnels cross existing bridge pile foundations, having a pile foundation underpinning that ensures the safe operation of existing bridges while enabling the safe construction of subway tunnels is the focus of attention. This paper takes the running tunnel project from Huaguoyuan West Station to Huaguoyuan East Station of Rail Transit Line 3 in Guiyang City, Guizhou Province as the background. The reasonableness and feasibility of the passive underpinning construction scheme for the Guihuang Viaduct was studied. The construction plan includes the following steps: underpinning pile construction, foundation pit excavation, the concreting of the underpinning bearing platform, and existing pile truncation. In order to ensure the structural safety of the existing viaduct during the construction of the pile foundation underpinning, a 3D numerical model of the construction of pile foundation underpinning and the whole process of tunnel construction was established. The settlement calculation results of the foundation pit and bridge pier were compared and analyzed with the field monitoring data to verify the accuracy of the numerical model. Further detailed analysis of the settlement of the bridge deck, the deformation of the existing piles, the axial forces of the existing piles, and the forces on the underpinning bearing platform was carried out. The results show that the bridge superstructure load can be transferred to the underpinning bearing platform smoothly after the existing pile truncation construction. The removal of obstacle piles during tunnel excavation has a very limited impact on the superstructure of the bridge, proving the reasonableness and feasibility of the construction plan.
This study will combine the detailed geological survey report of Tongzi Tunnel and the monitoring and measurement data of the site to select the surrounding rock section with rich structural surface and extensive distribution of medium-weathered mudstone and medium-weathered tuff as the representative section, drill cores to make natural rock specimens, and conduct uniaxial compression test. The Hoek-Brown criterion was then used to predict the rock strength of the tunnel envelope in the representative section, and based on this predicted strength a cement mortar with a mass ratio of water: cement: sand = 1:2:3 was selected to make specimens of the rock-like material. After the fabrication of the specimens, the reliability and feasibility of subsequent studies with the rock-like materials used in this study were supplemented by various means. The validation process is mainly to compare the rock-like material specimens with the natural rock specimens collected in the field and the rock-like material specimens recently adopted by other scholars in the following aspects. (1) Comparison of basic mechanical parameters. (2) The damage patterns and crack expansion patterns of natural rock material specimens and rock-like material specimens during uniaxial compression tests were compared by combining acoustic emission techniques and DIC2D-related techniques. (3) Tests were performed using scanning electron microscope (SEM) and energy dispersive spectroscopy (EDS) to compare the microscopic particle and pore sizes of the two specimens. (4) The measured mechanical parameters of the rock-like material specimens were compared with those of the rock-like material specimens used in similar related studies. Through the verification of these four approaches, it was finally proved that the cement mortar with the mass matching ratio of water: cement: sand = 1:2:3 used in this study can be used as a rock-like material to make models to study the mechanical properties of the rock in the tunnel instead of the natural rock.