Maximum power point tracking (MPPT) controllers have already achieved remarkable efficiencies. For smaller photovoltaic (PV) systems, any improvement will not really be worth mentioning as an achievement. However, for large solar farms, even a fractional improvement will eventually create a significant impact. This paper presents an MPPT control scheme using global sliding mode control (GSMC) with adaptive gain scheduling. In the two-loop controller, the first loop determines the maximum power point (MPP) reference using online calculations, while the GSMC with adaptive gain scheduling in the second loop adjusts the boost converter’s pulse width modulation (PWM) to force the PV system to operate at the MPP with improved performance. The adaptive gain scheduling regulates the gain of the switching control to maintain the controller performance over a wide range of operating conditions, while GSMC guarantees the system robustness throughout the control process by eliminating the reaching phase and improving MPPT performance. The overall PV system also has Lyapunov stability. Furthermore, the robustness analysis of the proposed controller is also performed under load variations and parametric uncertainties at various temperatures and irradiances. In the simulations, the proposed MPPT control scheme has shown faster response than other controllers, reaching the set point with rise time 0.03 s as compared to 0.07 s and 0.13 s for quasi sliding mode control (QSMC) and conventional sliding mode control (CSMC), respectively. The proposed controller showed an overshoot of 1.2 V around a steady state value of 21.9 V as compared to 1.51 V and 1.45 V, respectively, for QSMC and CSMC for a certain parametric variation. Furthermore, the proposed controller and the QSMC-based scheme showed a steady-state error of 0.3 V, while the CSMC-based approach has a more significant error. In conclusion, the proposed MPPT control scheme has a faster response and low tracking error with minimal oscillations.
Renewable energy sources play a great role in the sustainability of natural resources and a healthy environment. Among these, solar photovoltaic (PV) systems are becoming more economically viable. However, as the utility of solar energy conversion systems is limited by the availability of sunlight, they need to be integrated with electrical energy storage systems to be more sustainable. This paper aims to improve the control performance of a hybrid energy storage system (HESS) with PV power generation as the primary power source. HESSs stabilize DC microgrid systems by compensating for demand generation mismatches. Batteries and supercapacitors are chosen as energy storage elements; batteries have a high energy density and are capable of supplying and absorbing energy over a long duration, while supercapacitors can store and deliver energy very quickly. To enhance the stability of the system, each storage element is connected to the DC bus using a bidirectional Ćuk converter, which offers high efficiency, a continuous current, and minimal switching losses. This study proposes a proportional–integral (PI) controller combined with the fast nonsingular integral terminal sliding mode control (FNITSMC) for HESSs to adjust the power balance in a DC microgrid. FNITSMC has the advantage of enhancing the system states to reach the equilibrium point of a long sliding surface with a fast convergence rate. The reference current for FNITSMC is obtained using a PI controller combined with a low-pass filter (LPF), which eliminates the peaking current spikes on the battery and diverts them towards the supercapacitor. The effectiveness of the proposed control scheme is validated through the real-time hardware-in-the-loop (HIL) simulations on Typhoon™ HIL-402 with added uncertainties, including load variations at various temperatures and irradiances.
Optimal power flow (OPF) is a critical optimization application in power system planning and operation. Numerous studies employ metaheuristic techniques to address OPF problems of varying complexity. However, these techniques often suffer from slow convergence due to their dependence on the quality of initial solutions. To overcome this limitation, initial solutions must be optimally tuned to achieve good outcomes with faster convergence. This paper proposes an optimally tuned pattern search (OPS) algorithm to solve OPF problems in medium and large power systems. The tuning process, performed using the classical interior point method (IPM), provides optimal initial control variable values for the standard pattern search (PS) algorithm. The proposed technique is applied to three test systems: IEEE 30-bus, IEEE 57-bus, and IEEE 118-bus systems. The OPF problem is formulated to minimize four objectives: total active power loss, total generator fuel cost, total generator emission, and total deviation in load bus voltage magnitude. The performance of the OPS algorithm is evaluated based on objective function values and computation times and is compared with IPM and two popular metaheuristic techniques, particle swarm optimization (PSO) and genetic algorithm (GA). Results indicate that the OPS algorithm's performance varies across test systems but generally balances optimization performance with computational efficiency.