This paper presents an investigative study on a selected 11 kV distribution feeder network in Akure township, Nigeria, aimed at evaluating power distribution problems and solution proposals for effective application of existing 11 kV feeders for power supply within Nigeria. Based on peak loads recorded on the feeder for 8 years a long term load forecast up to 2021 was carried out using “Trend’ and “Growth’ functions in Excel worksheet. These functions use Method of Least Squares. The peak network load is 8 MW and the expected load in 2021 is 14.5 MW (18.5 MVA at 0.8 power factor) after an exponential growth rate of 0.6 MW per annum. There is need to increase the rating of the power transformer feeding the feeder in order to enhance the security power supply to the network. Furthermore, the Power Company must provide standard input voltage (1.05x11 kV) to the network in order to normalize end-users voltage quality.
The aim of this study was to assess the capacity of the existing primary feeder network (33 kV) and to determine ways of reinforcing it in view of prospective full scale electrification and power demand of the rural areas of Oyo State. This work was done by using data of maximum power demand allocations to fully electrified areas of the State to compute expected range of power demand per capita, and applying normal mode simulations and solutions using iterative approximation and direct matrix algebra methods. The results show that the load per capita range, and potential load demand for the State are 0.011 kW to 0.094 kW and about 534 MW (huge compared to current 103.7 MW supply from the utility) respectively. The capacities of existing networks and the total injection substations’ capacity (225 MVA) are inadequate for meeting the potential demand of Oyo State, including the rural areas. Upgrading the voltage of the existing network to 132 kV will improve its distribution capacity significantly and solve overloading and voltage problems. Also, installation of more 132 kV substations is needed to relieve the existing fully loaded ones. Otherwise, a full scale rural electrification development in Oyo State, intending to feed from the national grid, will be impossible.
A study of the growth dynamics of the installed capacity of the Nigerian Power System from 1963 to date was done. Perspective available generating capacity was estimated based on service life of existing installed capacity. The sufficiency of generating capacity for future normal operating modes of the system was estimated based on a power load growth forecast from 2003 to 2020. An analysis of the results shows that all the installed capacity since 1963 to the late 80s would have expired by 2020 i.e outlived their rated service lives. At present, only about 4.9 GW (80%) of total installed capacity is valid. Considering the national goal of significant economic development and estimated load forecast of over 8 GW by 2020, there is an urgent need to renovate or replace expired generating units besides the planned building of new power stations which have long gestation periods.